ApprovedCouncil status: Decided Permit

Construction of attached three bedroom dwelling

9 BLOSSOM CLOSE, BOTLEY, SOUTHAMPTON, SO30 2FR

Eastleigh Borough CouncilReference F/16/78913Full planning

Last published check: 13 Nov 2026, 02:53. Check the council record for more recent changes.

We couldn’t update every section. Some information is from an earlier collection.

Status and dates

Last published check: 13 Nov 2026, 02:53 (UK)

  1. DoneReceived14 Jul 2016
  2. DoneValidated14 Jul 2016
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date8 Sept 2016
  5. DecidedPermit8 Sept 2016

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (4)
  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Decision Date

    Published milestoneCouncil source
  4. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Full planning
Ward
Botley
Parish
Botley CP
Documents
10 published

Proposal

Construction of attached three bedroom dwelling

Reference
F/16/78913
Ward
Botley
Parish
Botley CP
Agent
Mr C Shipperley - Anders Roberts Cheer Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

The document list could not be fully refreshed. View the council record for the complete list.

  • Officer Report (1798457)Officer Report8 Sept 2016View
  • Decision Notice (1798456)Decision Notice8 Sept 2016View
  • Location Plan (1792707)Location Plan18 Aug 2016View
  • Parish Response (1786551)Parish Response12 Aug 2016View
  • Consultees Response (1784460)Consultees Response5 Aug 2016View
  • Plans (1774308)Plans14 Jul 2016View
  • Floor Plan (1774307)Floor Plan14 Jul 2016View
  • Application Form (1774302)Application Form14 Jul 2016View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Permit
Decision Notice (1798456)
Planning conditions
  1. (1) The development hereby permitted shall be implemented in accordance with the following plans numbered: 8769/100 Rev.A, 8769/101 & 8769/102. Reason: For the avoidance of doubt and in the interests of proper planning.

    (1) Development in accordance with approved plans

  2. (2) The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.

    (2) Start - 3 years

  3. (3) No construction or demolition work shall start until a Method Statement has been submitted to, and approved in writing by, the Local Planning Authority. Demolition and construction work shall only take place in accordance with the approved method statement which shall include: a) location of temporary site buildings, compounds, construction material and plant storage areas used during demolition and construction; b) the arrangements for deliveries associated with all construction works, loading/ unloading of plant & materials and restoration of any damage to the highway including vehicle crossovers and grass verges. c) the parking of vehicles of site operatives and visitors; d) measures to control the emission of dust and dirt generated by demolition and construction; e) a scheme for controlling noise and vibration from demolition and construction activities (to include piling); and f) measures to prevent mud and dust on the highway during demolition and construction. Reason: To limit the impact the development has on the amenity of the locality

    (3) No construction/demolition until Method Statement approved

  4. (4) Prior to commencement, details of how the approved dwellings will achieve Code level 4 equivalent requirements for energy and water [or equivalent requirements that are set out in national legislation or policy], with reference to design stage SAP data and the BRE water calculator, as well as evidence that the relevant ESD requirements 2-8 inclusive of the Council’s adopted Environmentally Sustainable Development SPD are being met shall be submitted to, and approved in writing by, the Local Planning Authority. No dwelling shall be occupied until written confirmation that these works have been completed, and the ‘as built’ stage SAP data and a confirmation of the water calculation, has been submitted for that dwelling. Reason: To ensure the development meets the requirements of the national technical standards for energy and water consumption and the Council’s adopted Environmentally Sustainable Development SPD in residential development.

    (4) Energy and water requirements for new dwellings

  5. (5) No development shall start until details for the sustainable disposal of surface water [and disposal of foul sewerage] from the development hereby permitted have been submitted to and approved in writing by the Local Planning Authority. The development shall then accord with the approved details. Reason: To ensure satisfactory provision of foul and surface water drainage.

    (5) Details - Sustainable disposal of surface and foul water - pre start

  6. (6) No development shall start until details of the access [including any footway and verge crossing] have been submitted to and approved in writing by the Local Planning Authority. The development shall not be [occupied/ brought into use] until the approved details have been fully implemented [unless agreed in writing by the Local Planning Authority]. Reason: To ensure satisfactory vehicular access.

    (6) Details access - pre start

  7. (7) No development shall start until details for the on site provision of bin & cycle storage facilities have been submitted to and approved in writing by the Local Planning Authority. The development shall not be occupied until the bin & cycle storage has been constructed in accordance with the approved details and thereafter retained and kept available. Reason: To ensure the adequate provision of on site facilities.

    (7) Details - refuse storage - pre start

  8. (8) The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the adjoining dwelling. Reason: To ensure a satisfactory visual relationship between the new development and the existing.

    (8) Materials to match existing

  9. (9) No construction, demolition or deliveries to the site shall take place during the construction period except between the hours of 0800 to 1800 Mondays to Fridays or 0900 to 1300 on Saturdays and not at all on Sundays or Bank Holidays. Reason: To protect the amenities of the occupiers of nearby dwellings.

    (9) Construction hours

  10. (10) No development shall start on the dwelling hereby approved until boundary fencing to a minimum height of 1.8 metres has been provided along the full length of the western boundary of the application site and shall thereafter be retained throughout the course of construction works. Reason: To ensure a secure boundary to the site and for neighbouring properties.
  11. (11) No burning of materials obtained by site clearance or any other source shall take place during the demolition, construction and fitting out process. Reason: To protect the amenities of the occupiers of nearby properties.

    (11) No burning

  12. (12) The first floor window on the western side elevation shall either be obscure glazed to Pilkingtons level 3 or equivalent with no opening part less than 1.7 metres above the floor level of the room in which it is installed. Once installed the window shall be permanently maintained in that condition. Reason: To protect the amenity and privacy of the adjoining residential properties.

    (12) Windows - obscurity/positioning/opening procedure

  13. (13) The development hereby permitted shall not be occupied until the parking areas for both the approved and existing dwellings have been provided in accordance with the approved plan Ref: '8769/100 Rev.A' and thereafter permanently retained and used only for the purpose of accommodating private motor vehicles incidental to the enjoyment of the dwellinghouses as residences. Reason: To make provision for off street parking for the purpose of highway safety.

    (13) Provision of parking prior to occupation

  14. (14) Notwithstanding the provisions of the Town and Country Planning [General Permitted Development] Order 2015 [or any order revoking and re-enacting that Order with or without modification], no development permitted by Classes A, D & E of Part 1 of Schedule 2 of the order shall be carried out without the prior written consent of The Local Planning Authority. Reason: To protect the amenities of neighbouring properties and to ensure sufficient off-road parking provision.

    (14) Dwelling - no permitted development

  15. Note to Applicant: In accordance with paragraphs 186 and 187 of the National Planning Policy Framework, Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
  16. Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council’s website www.eastleigh.gov.uk by following the links to Planning, Guidance on the process, scroll down to Guidance on Aspects of the Planning & Construction Process and select considerate builders advice note.
  17. Note to Applicant: the permission does not authorise the undertaking of any works involving excavations in the carriageway, footway or verge. A road opening permit must be obtained from Hampshire Highways, HCC call centre number 0845 6035633.
  18. Note to Applicant: In accordance with Appendix C of the Council’s adopted Policy Quality Places SPD, the Council requires developers to meet the cost of bins for general and recycling waste. These must be purchased from Direct Services on 023 80688440.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.