ApprovedCouncil status: Decided Permit

Construction of stand alone Energy Centre including Combined Heat and Power engine, boilers, pumps, ancillary equipment and 15 metre high flue together with installation of district heating network and provision of landscape screening.

FLEMING PARK LEISURE CENTRE, PASSFIELD AVENUE, EASTLEIGH, SO50 9NL

Eastleigh Borough CouncilReference F/16/78608Full planning

Last published check: 12 Nov 2026, 17:43. Check the council record for more recent changes.

We couldn’t update every section. Some information is from an earlier collection.

Status and dates

Last published check: 12 Nov 2026, 17:43 (UK)

  1. DoneReceived24 May 2016
  2. DoneValidated27 Jul 2016
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date26 Oct 2016
  5. DecidedPermit3 Oct 2016

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (4)
  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Decision Date

    Published milestoneCouncil source
  4. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Full planning
Ward
Eastleigh South
Parish
Eastleigh
Documents
41 published

Proposal

Construction of stand alone Energy Centre including Combined Heat and Power engine, boilers, pumps, ancillary equipment and 15 metre high flue together with installation of district heating network and provision of landscape screening.

Reference
F/16/78608
Ward
Eastleigh South
Parish
Eastleigh

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

The document list could not be fully refreshed. View the council record for the complete list.

  • L04-NH Energy Centre EmissionsNoise Report21 Nov 2017View
  • Officer Report (1811806)Officer Report4 Oct 2016View
  • Officer Report (1811803)Officer Report4 Oct 2016View
  • Decision Notice (1811788)Decision Notice4 Oct 2016View
  • Consultees Response (1803343)Consultees Response9 Sept 2016View
  • Consultees Response (1798971)Consultees Response9 Sept 2016View
  • Consultees Response (1790473)Consultees Response22 Aug 2016View
  • Noise Report (1786569)Noise Report12 Aug 2016View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Permit
Decision Notice (1811788)
Planning conditions
  1. (1) The development hereby permitted shall be implemented in accordance with the following plans numbered: 001, 60350817-003 Rev 1, 60350817-004, 60350817-005, 60350817-006, NFLC_L_9021, R01-NH , SK20160726-7, SK20160726-8, SK20160726-9 & SK20160726-10. Reason: For the avoidance of doubt and in the interests of proper planning.

    (1) Development in accordance with approved plans

  2. (2) The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.

    (2) Start - 3 years

  3. (3) Not withstanding the approved plans / details, no development shall start until details of the materials to be used in the construction of the external surfaces of the development hereby permitted, including the main building and chimney have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details. Reason: To ensure a satisfactory visual appearance in the interest of the amenities of the area.

    (3) Details - materials samples

  4. (4) Development shall not begin until the developer has provided an air quality assessment that demonstrates that the impacts of pollutants from plant associated with the Energy Centre have been considered. This assessment must give due consideration to the technical specifications of the plant units and the proposed minimum and maximum operational emission outputs. If necessary, the report shall include a scheme of mitigation measures for minimising the impacts of these pollutants, this scheme must be submitted for approval by the Local Planning Authority. All works, which form part of the scheme approved by the Local Planning Authority, must be completed before any of the permitted development is operational, unless agreed by the Local Planning Authority. The scheme shall be fully implemented, unless varied with the written permission of the Local Planning Authority in advance of implementation. Reason: In the interests of air quality.
  5. (5) No additional CHP plant, boilers or other equipment shall be installed without the prior written approval of the Local Planning Authority. Reason: Additional plant may impact on pollutant emissions.
  6. (6) The siting and installation of plant and equipment, including process vents and exhausts, which gives rise, or is likely to give rise, to noise shall be approved in writing by the Local Planning Authority. Reason: To protect the area from noise.
  7. (7) The combined level of break-out of noise from the Combined Heat and Power engine, boilers, pumps, and ancillary equipment (including any associated plant, machinery and/or equipment) shall not exceed agreed sound levels. These levels shall be agreed prior to the commencement of operation and determined at free field locations to be agreed with the Local Planning Authority. Reason: To protect the area from noise.
  8. (8) The development hereby approved shall not be brought into operation until a noise assessment scheme that demonstrates that the installed plant and equipment complies with the agreed combine level of break-out noise has been submitted to and agreed in writing by the Local Planning Authority. Reason: To protect the area from noise.
  9. (9) No development shall start until a landscaping scheme has been submitted to and approved in writing by the Local Planning Authority. The scheme shall cover all hard & soft landscaping including trees and boundary treatment and shall provide details of timings for all landscaping and any future maintenance. The works shall be carried out in accordance with the approved plans and to the appropriate British Standard. Reason: In the interests of the visual amenity of the locality and to safeguard the amenities of neighbouring residents.

    (9) Landscaping scheme - pre start

  10. (10) For a period of no less than 5 years after planting, any trees or plants which are removed, die or become seriously damaged or defective, shall be replaced as soon as is reasonably practicable with others of the same species, size and number as originally approved in the landscaping scheme. Reason: In the interests of the visual amenities of the locality.

    (10) Landscaping 5 year maintenance

  11. (11) No construction or demolition work shall start until a Method Statement has been submitted to, and approved in writing by, the Local Planning Authority. Demolition and construction work shall only take place in accordance with the approved method statement which shall include: a) measures to control the emission of dust and dirt generated by demolition and construction works, including measures to prevent mud on the highway; b) a scheme for controlling noise and vibration from demolition and construction activities [including details of any piling]; c) the arrangements for deliveries associated with all construction works, loading/ unloading of plant & materials and restoration of any damage to the highway including vehicle crossovers and grass verges. Reason: To limit the impact the development has on the amenity of the locality

    (11) No construction/demolition until Method Statement approved

  12. (12) The use hereby permitted shall only operate between the hours of 07:00 and 23:00 on any day. Reason: To protect the amenity of the area and neighbouring uses.
  13. Note to Applicant: In accordance with paragraphs 186 and 187 of the National Planning Policy Framework, Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.