ApprovedCouncil status: Decided Permit

Single and two storey rear extension and conversion of garage to habitable accommodation

27 ROKER WAY, FAIR OAK, EASTLEIGH, SO50 7LD

Eastleigh Borough CouncilReference F/16/78466Full planning

Last published check: 12 Nov 2026, 03:33. Check the council record for more recent changes.

We couldn’t update every section. Some information is from an earlier collection.

Status and dates

Last published check: 12 Nov 2026, 03:33 (UK)

  1. DoneReceived26 Apr 2016
  2. DoneValidated26 Apr 2016
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date21 Jun 2016
  5. DecidedPermit21 Jun 2016

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (4)
  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Decision Date

    Published milestoneCouncil source
  4. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Full planning
Ward
Fair Oak and Horton Heath
Parish
Fair Oak and Horton Heath CP
Documents
7 published

Proposal

Single and two storey rear extension and conversion of garage to habitable accommodation

Reference
F/16/78466
Ward
Fair Oak and Horton Heath
Parish
Fair Oak and Horton Heath CP
Agent
Peter Oughtibridge - DPO Design

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

The document list could not be fully refreshed. View the council record for the complete list.

  • Officer Report (1758658)Officer Report21 Jun 2016View
  • Decision Notice (1758656)Decision Notice21 Jun 2016View
  • Parish Response (1750442)Parish Response7 Jun 2016View
  • Plans (1729308)Plans26 Apr 2016View
  • Plans (1729309)Plans26 Apr 2016View
  • Application Form (1729305)Application Form26 Apr 2016View
  • Location Plan (1729311)Location Plan26 Apr 2016View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Permit
Decision Notice (1758656)
Planning conditions
  1. (1) The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.

    (1) Start - 3 years

  2. (2) The development hereby permitted shall be implemented in accordance with the following plans numbered: 27RW-P-01, 27RW-P-02, 27RW-P-03 Reason: For the avoidance of doubt and in the interests of proper planning.

    (2) Development in accordance with approved plans

  3. (3) The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.

    (3) Materials to match existing

  4. (4) No construction, demolition or deliveries to the site shall take place during the construction period except between the hours of 0800 to 1800 Mondays to Fridays or 0900 to 1300 on Saturdays and not at all on Sundays or Bank Holidays. Reason: To protect the amenities of the occupiers of nearby dwellings.

    (4) Construction hours

  5. (5) No window shall be constructed in the north and south elevations of the development hereby approved. Reason: To protect the amenity and privacy of the adjoining residential properties.

    (5) No addition/altered windows

  6. Note to Applicant: In accordance with paragraphs 186 and 187 of the National Planning Policy Framework, Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.