ApprovedCouncil status: Decided Permit

Construction of 1no. 3 bedroom single storey detached dwelling with associated parking, landscaping & detached single garage, with altered access from Telegraph Road. Erection of detached single garage & provision of new access from High Street to serve existing dwelling (re-submission)

84 HIGH STREET, WEST END, SOUTHAMPTON, SO30 3DU

Eastleigh Borough CouncilReference F/15/77712Full planning

Last published check: 12 Nov 2026, 14:45. Check the council record for more recent changes.

We couldn’t update every section. Some information is from an earlier collection.

Status and dates

Last published check: 12 Nov 2026, 14:45 (UK)

  1. DoneReceived7 Dec 2015
  2. DoneValidated7 Dec 2015
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date1 Feb 2016
  5. DecidedPermit22 Mar 2016

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (4)
  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
Application type
Full planning
Ward
West End South
Parish
West End CP
Documents
16 published

Proposal

Construction of 1no. 3 bedroom single storey detached dwelling with associated parking, landscaping & detached single garage, with altered access from Telegraph Road. Erection of detached single garage & provision of new access from High Street to serve existing dwelling (re-submission)

Reference
F/15/77712
Ward
West End South
Parish
West End CP
Agent
Robert Collins - Robert Collins Associates Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

The document list could not be fully refreshed. View the council record for the complete list.

  • PhotoPhotographs19 Nov 2018View
  • Officer Report (1707202)Officer Report22 Mar 2016View
  • Decision Notice (1707201)Decision Notice22 Mar 2016View
  • Street Scene Plan (1700622)Street Scene Plan22 Jan 2016View
  • Consultees Response (1700720)Consultees Response18 Jan 2016View
  • Consultees Response (1700718)Consultees Response21 Dec 2015View
  • Elevations and Floor Plan (1646403)Elevations And Floor Plan7 Dec 2015View
  • Tree Info (1646429)Tree Info7 Dec 2015View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Permit
Decision Notice (1707201)
Planning conditions
  1. (1) The development hereby permitted shall be implemented in accordance with the following plans numbered: LTD (128) 29 Revision A, LTD (141) 3 Revision C, LTD (141) 9 Revision A, LTD (141) 10, TPP-100001 Revision 1 (Tree Protection Plan), TAP-100001 Revision 1. Reason: For the avoidance of doubt and in the interests of proper planning.

    (1) Development in accordance with approved plans

  2. (2) The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.

    (2) Start - 3 years

  3. (3) The materials to be used in the construction of the garage for No. 84 High Street shall match as closely as possible in type, colour and texture those used on the existing property. Reason: To ensure a satisfactory visual relationship between the new development and the existing.

    (3) Materials to match existing

  4. (4) No development shall commence in respect of the new dwelling hereby permitted until the parking and turning area to serve No. 84 High Street, as shown on approved drawing LTD (141) 3 Revision C, have been provided. These shall thereafter be kept available and retained for this purpose at all times. Reason: To make adequate provision for off street parking in the interests of highway safety.

    (4) Provision of parking prior to occupation

  5. (5) No construction work shall start in respect of the new dwelling hereby permitted until a Method Statement has been submitted to, and approved in writing by, the Local Planning Authority. Construction works shall only take place in accordance with the approved method statement which shall include: a) the location of any temporary site buildings, compounds, and construction material storage areas to be used during construction; b) the arrangements for deliveries associated with all construction works including the loading and unloading of plant & materials; c) the parking of vehicles of site operatives and visitors; d) measures to control the emission of dust and dirt generated by construction works; e) provision to be made for the storage, collection, and disposal of rubbish from the development during the construction period; and, f) measures to prevent mud and dust on the highway during construction. Reason: To limit the impact that the development has on the amenity of the locality.

    (5) No construction/demolition until Method Statement approved

  6. (6) No development shall start in respect of the dwelling hereby permitted until details and samples of the materials to be used in the construction of its external surfaces have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details. Reason: To ensure a satisfactory visual appearance in the interest of the amenities of the area.

    (6) Details - materials samples

  7. (7) No development shall start in respect of the new dwelling hereby permitted until details of the access from Telegraph Road, including any footway crossing, have been submitted to and approved in writing by the Local Planning Authority. The development shall not be occupied until the approved details have been fully implemented. Reason: To ensure satisfactory vehicular access for the development.

    (7) Details access - pre start

  8. (8) The new access from Telegraph Road for the dwelling hereby permitted, shall not be brought into use until the existing site access has been stopped up and abandoned and the footway has been reinstated in accordance with details to be approved by the Local Planning Authority in conjunction with the Highway Authority. Reason: In the interest of highway safety.

    (8) Stop up and reinstate existing access

  9. (9) The dwelling hereby permitted shall not be occupied until the parking and turning area for it have been provided in accordance with approved drawing LTD (141) 3 Revision C. These shall thereafter be retained and kept available for this purpose at all times. Reason: To make adequate provision for off street parking in the interests of highway safety.

    (9) Provision of parking prior to occupation

  10. (10) Prior to commencement, details of how the approved dwellings will achieve Code level 4 equivalent requirements for energy and water [or equivalent requirements that are set out in national legislation or policy], with reference to design stage SAP data and the BRE or equivalent water calculator, as well as evidence that the relevant ESD requirements 2-8 inclusive of the Council’s adopted Environmentally Sustainable Development SPD are being met shall be submitted to, and approved in writing by, the Local Planning Authority. No dwelling shall be occupied until written confirmation that these works have been completed, and the ‘as built’ stage SAP data and a confirmation of the water calculation, has been submitted for that dwelling. Reason: To ensure the development meets the requirements of the national technical standards for energy and water consumption and the Council’s adopted Environmentally Sustainable Development SPD in residential development.

    (10) Energy and water requirements for new dwellings

  11. (11) No development shall start in respect of the dwelling hereby permitted until details for the sustainable disposal of surface water and disposal of foul sewerage from the development have been submitted to and approved in writing by the Local Planning Authority. The development shall then accord with the approved details. Reason: To ensure satisfactory provision of foul and surface water drainage.

    (11) Details - Sustainable disposal of surface and foul water - pre start

  12. (12) No development shall start in respect of the new dwelling until a landscaping scheme for the site has been submitted to and approved in writing by the Local Planning Authority. The scheme shall cover all soft & hard landscaping and shall provide details of timings for all landscaping and any future maintenance. The works shall be carried out in accordance with the approved plans and to the appropriate British Standard. Reason: In the interests of the visual amenity of the locality and to safeguard the amenities of neighbouring residents.

    (12) Landscaping scheme - pre start

  13. (13) For a period of no less than 5 years after planting, any trees or plants which are removed, die or become seriously damaged or defective, shall be replaced as soon as is reasonably practicable with others of the same species, size and number as originally approved in the landscaping scheme. Reason: In the interests of the visual amenities of the locality.

    (13) Landscaping 5 year maintenance

  14. (14) The development must accord with the Arboricultural Implications Assessment and Method Statement (015-AIA-182) produced by Shawyers dated 18th November 2014. Tree Protection must be addressed as per the Tree Protection Plan (TPP-100001) enclosed within the report. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality.

    (14) Development to accord with agreed Arboricultural Impact Assessment, Method Statement, Tree Surv

  15. (15) No development shall start in respect of the new dwelling hereby permitted until a site meeting has taken place with the site manager, the retained consulting arboriculturalist and a representative of the Local Planning Authority (LPA). Work shall not commence until the representative of the LPA has inspected and approved the protective fencing and ground protection, ensuring that it conforms to the Tree Protection Plan and the Method Statement. Once approved no access by vehicles or placement of goods, chemicals, fuels, soil or other materials shall take place within the fenced area. The fencing shall be retained in its approved form for the duration of the work. All other aspects of the Arboricultural Implications Assessment and Method Statement will be addressed at the meeting. This condition shall not be discharged until an arboricultural supervision statement, the contents of which are to be discussed and agreed at the pre-commencement meeting, is submitted to and approved in writing by the Local Planning Authority on completion of the development. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality.

    (15) Protective fencing - pre start meeting

  16. (16) No development shall start in respect of the dwelling hereby permitted until details for the treatment of site boundaries have been submitted to and approved in writing by the Local Planning Authority. The dwelling shall not be occupied until the boundary treatments have been provided in accordance with the approved details and these shall be retained thereafter. Reason: In the interests of the visual amenity of the locality and to safeguard the amenities of neighbouring residents.

    (16) Details - boundary treatment

  17. (17) The boundary treatment along the rear (western) boundary of the site of the dwelling hereby permitted shall be maintained at a height of no less than 1.8 metres. Reason: In the interests of protecting the amenities of neighbouring residents.

    (17) Boundary treatment to western boundary to be maintained at minimum height of 1.8m.

  18. (18) The dwelling hereby approved shall not be occupied until the bin & cycle storage facilities have been provided in accordance with the approved details. These shall thereafter be retained and kept available for this purpose. Reason: To ensure the adequate provision of on site facilities.

    (18) Details - refuse storage - pre start

  19. (19) No construction, demolition or deliveries to the site shall take place during the construction period except between the hours of 0800 to 1800 Mondays to Fridays or 0900 to 1300 on Saturdays and not at all on Sundays or Bank Holidays. Reason: To protect the amenities of the occupiers of nearby dwellings.

    (19) Construction hours

  20. (20) No burning of materials obtained by site clearance or any other source shall take place during the demolition, construction or fitting out process. Reason: To protect the amenities of the occupiers of nearby properties.

    (20) No burning

  21. (21) Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no development permitted by Classes A, B, C or E of Part 1 of Schedule 2 of the order shall be carried out without the prior written consent of The Local Planning Authority. Reason: To protect the amenities of the locality and to maintain a good quality environment.

    (21) Dwelling - no permitted development

  22. Note to Applicant: It is considered that, subject to compliance with the conditions and any obligations attached to this permission, the proposed development is acceptable because it will not materially harm the character of the area, the amenity of neighbours or highway safety and it is in accordance with the policies and proposals of the development plan, comprising the Eastleigh Borough Local Plan Review 2001-2011, and after due regard to all other relevant material considerations including the National Planning Policy Framework and the Submitted Eastleigh Borough Local Plan 2011 - 2029, July 2014 the Submitted Local Plan comprising: the Revised Pre-submission Eastleigh Borough Local Plan 2011 - 2029, published February 2014; and the Schedule of Proposed Minor Changes, submitted to the Secretary of State in July 2014, the local planning authority is of the opinion that permission should be granted. The following development plan saved policies and emerging draft local plan policies are relevant to this decision and the conditions attached to it: Eastleigh Borough Local Plan Review [2001-2011], saved Policies 25.NC, 28.ES, 34.ES, 59.BE, 100.T, 101.T, 104.TM, 147.OS, 191.IN. Submitted Eastleigh Borough Local Plan 2011 - 2029, July 2014, the Submitted Local Plan, Policies DM1, DM2, DM9, DM23, DM24, DM25, DM29, DM32, DM37. In accordance with paragraphs 186 and 187 of the National Planning Policy Framework, Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner. Under the Town and Country Planning England Regulations 2012, a fee is required for Discharge of Condition Applications. N.B. Conditions not fully discharged, invalidate the planning permission.
  23. Note to Applicant: the permission does not authorise the undertaking of any works involving excavations in the carriageway, footway or verge. A road opening permit must be obtained from Hampshire Highways who can be contacted on 0845 6035633.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.