ApprovedCouncil status: Decided Permit

Construction of 2no. two bedroom and 2no. one bedroom flats in a single block with parking & amenity space, following demolition of existing dwelling (amended design)

FORMER, 37 TWYFORD ROAD, EASTLEIGH, SO50 4HH

Eastleigh Borough CouncilReference F/15/77475Full planning

Last published check: 12 Nov 2026, 19:52. Check the council record for more recent changes.

We couldn’t update every section. Some information is from an earlier collection.

Status and dates

Last published check: 12 Nov 2026, 19:52 (UK)

  1. DoneReceived28 Oct 2015
  2. DoneValidated11 Nov 2015
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date6 Jan 2016
  5. DecidedPermit2 Mar 2016

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (4)
  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
Application type
Full planning
Ward
Eastleigh North
Parish
Eastleigh
Documents
25 published

Proposal

Construction of 2no. two bedroom and 2no. one bedroom flats in a single block with parking & amenity space, following demolition of existing dwelling (amended design)

Reference
F/15/77475
Ward
Eastleigh North
Parish
Eastleigh
Agent
Mr D Lindsay

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

The document list could not be fully refreshed. View the council record for the complete list.

  • RE 31-37 Twyford RoadConsultee Response1 Nov 2017View
  • FW 31-37 Twyford RoadDischarge Of Conditions31 Oct 2017View
  • Consultees Response (1847422)Consultees Response13 Dec 2016View
  • Correspondence incoming (1701949)Correspondence Incoming11 Mar 2016View
  • Decision Notice (1695398)Decision Notice2 Mar 2016View
  • Officer Report (1695399)Officer Report2 Mar 2016View
  • Site Layout Plan (1675923)Site Layout Plan7 Jan 2016View
  • Floor Plan (1675933)Floor Plan7 Jan 2016View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Permit
Decision Notice (1695398)
Planning conditions
  1. (1) The development hereby permitted shall be implemented in accordance with the following plans numbered: Reason: WS-1125-01 Rev A, WS-1125-02 Rev B, WS-1125-03 Rev.B, WS-1125-04 Rev.A, WS-1125-05 Rev.A, WS-1125-06 Rev.A, WS-1125-07 Rev.B, WS-1125-08 Rev B. For the avoidance of doubt and in the interests of proper planning.

    (1) Development in accordance with approved plans

  2. (2) The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.

    (2) Start - 3 years

  3. (3) No development shall start until details of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details. Reason: To ensure a satisfactory visual appearance in the interest of the amenities of the area.

    (3) Details - materials samples

  4. (4) No development shall start until details for the sustainable disposal of surface water and disposal of foul sewerage from the development hereby permitted have been submitted to and approved in writing by the Local Planning Authority. The development shall then accord with the approved details. Reason: To ensure satisfactory provision of foul and surface water drainage.

    (4) Details - Sustainable disposal of surface and foul water - pre start

  5. (5) No development shall commence until details of measures to protect future occupiers of the development from air pollution have been submitted to and approved in writing by the Local Planning Authority. These agreed measures must then be implemented in full prior to occupatio of the development hereby approved and retained throughout the lifetime of the development. Reason: In the interests of amenity and health.
  6. (6) Prior to commencement, details of how the approved dwellings will achieve Code level 4 equivalent requirements for energy and water [or equivalent requirements that are set out in national legislation or policy], with reference to design stage SAP data and the BRE water calculator, as well as evidence that the relevant ESD requirements 2-8 inclusive of the Council’s adopted Environmentally Sustainable Development SPD are being met shall be submitted to, and approved in writing by, the Local Planning Authority. No dwelling shall be occupied until written confirmation that these works have been completed, and the ‘as built’ stage SAP data and a confirmation of the water calculation, has been submitted for that dwelling. Reason: To ensure the development meets the requirements of the national technical standards for energy and water consumption and the Council’s adopted Environmentally Sustainable Development SPD in residential development.

    (6) Energy and water requirements for new dwellings

  7. (7) No development shall start until details for the on site provision of secure bin & cycle storage facilities have been submitted to and approved in writing by the Local Planning Authority. The development shall not be occupied until the bin & cycle storage has been constructed in accordance with the approved details and thereafter retained and kept available. Reason: To ensure the adequate provision of on site facilities.

    (7) Details - refuse storage - pre start

  8. (8) No construction or demolition work shall start until a Method Statement has been submitted to, and approved in writing by, the Local Planning Authority. Demolition and construction work shall only take place in accordance with the approved method statement which shall include: a) measures to control the emission of dust and dirt generated by demolition and construction works, including measures to prevent mud on the highway; b) a scheme for controlling noise and vibration from demolition and construction activities [including details of any piling]; c) the arrangements for deliveries associated with all construction works, loading/ unloading of plant & materials and restoration of any damage to the highway [including vehicle crossovers and grass verges]. Reason: To limit the impact the development has on the amenity of the locality

    (8) No construction/demolition until Method Statement approved

  9. (9) The development must accord with the Arboricultural Implications Assessment and Method Statement (Ref. JFA0012) produced by James Fuller Arboriculture for Elite Murphy Developments dated October 2015. Tree Protection must be addressed as per the Tree Protection Plan (JFA0012.02A) enclosed within the report. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality.
  10. (10) No development shall commence until a site meeting has taken place with the site manager, the retained consulting arboriculturalist and the Tree Services Manager from the Local Planning Authority. Work cannot commence until the Tree Services Manager has inspected and approved the tree protection, ensuring it conforms to the Tree Protection Plan and the Method Statement. Once approved no access by vehicles or placement of goods, chemicals, fuels, soil or other materials shall take place within the fenced area. The fencing shall be retained in its approved form for the duration of the work. All other aspects of the Arboricultural Impact Assessment and Method Statement will be addressed at this meeting including any required changes with final layout of the scheme and the installation of services that may have an impact on trees. This tree condition may only be fully discharged on completion of the development subject to satisfactory written evidence of compliance monitoring by the pre-appointed consulting arboriculturalist. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality.
  11. (11) No development shall start until a landscaping scheme has been submitted to and approved in writing by the Local Planning Authority. The scheme shall cover all hard & soft landscaping including trees and boundary treatment and shall provide details of timings for all landscaping and any future maintenance. The works shall be carried out in accordance with the approved plans and to the appropriate British Standard. Reason: In the interests of the visual amenity of the locality and to safeguard the amenities of neighbouring residents.

    (11) Landscaping scheme - pre start

  12. (12) All hard & soft landscaping, tree planting and boundary treatment shall be carried out in accordance with the approved details and to the appropriate British Standard. For a period of 5 years after planting, any trees or plants which are removed, die or become seriously damaged or defective, shall be replaced as soon as is reasonably practicable with others of the same species, size and number as originally approved in the landscaping scheme. Reason: In the interests of the visual amenity of the locality and to safeguard the amenities of neighbouring residents.

    (12) Landscaping to British Standard and maintained for 5 years

  13. (13) No construction, demolition or deliveries to the site shall take place during the construction period except between the hours of 0800 to 1800 Mondays to Fridays or 0900 to 1300 on Saturdays and not at all on Sundays or Bank Holidays. Reason: To protect the amenities of the occupiers of nearby dwellings.

    (13) Construction hours

  14. (14) No burning of materials obtained by site clearance or any other source shall take place during the demolition, construction and fitting out process. Reason: To protect the amenities of the occupiers of nearby properties.

    (14) No burning

  15. (15) The development hereby permitted shall not be brought into use until the car park has been constructed, surfaced and marked out in accordance with the approved plan. The approved parking area shall not thereafter be used for any purpose other than the turning, parking, loading and unloading of vehicles. Reason: To make provision for off street parking for the purpose of highway safety.

    (15) Car park provided prior to use starting and retained for parking, turning, loading and unloading

  16. (16) Any first floor windows on the northern side elevation of the development hereby approved shall either be: a) obscure glazed to Pilkingtons level 3 or equivalent with no opening parts less than 1.7metres above the floor level of the room which it serves: OR b) positioned at least 1.7 metres above the floor of the room in which it is installed. Once installed the windows shall be permanently maintained in that condition. Reason: To protect the amenity and privacy of the adjoining residential properties.

    (16) Windows - obscurity/positioning/opening procedure

  17. Note to Applicant: This development is located within a resident’s parking scheme and it is Council policy that residents of all new developments will not be eligible for parking permits. The term development means the construction of new or replacement buildings or alterations to existing buildings that result in an increased demand for parking not catered for within the development.
  18. Note to Applicant: It is considered that, subject to compliance with the conditions and any obligations attached to this permission, the proposed development is acceptable because it will not materially harm the character of the area, the amenity of neighbours or highway safety and it is in accordance with the policies and proposals of the development plan, comprising the Eastleigh Borough Local Plan Review 2001-2011, and after due regard to all other relevant material considerations including the National Planning Policy Framework and the Submitted Eastleigh Borough Local Plan 2011 - 2029, July 2014 the Submitted Local Plan comprising: the Revised Pre-submission Eastleigh Borough Local Plan 2011 - 2029, published February 2014; and the Schedule of Proposed Minor Changes, submitted to the Secretary of State in July 2014’, the local planning authority is of the opinion that permission should be granted. The following development plan saved policies and emerging draft local plan policies are relevant to this decision and the conditions attached to it: Eastleigh Borough Local Plan Review [2001-2011], saved Policies 28.ES, 31.ES, 34.ES, 53.BE, 59.BE, 74.H, 101.T, 147.OS & 191.IN Submitted Eastleigh Borough Local Plan 2011 - 2029, July 2014, the Submitted Local Plan, Policies DM1, DM2, DM23, DM24, DM25, DM28, DM29, DM32, DM35, DM37 & E8 In accordance with paragraphs 186 and 187 of the National Planning Policy Framework, Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner. Under the Town and Country Planning England Regulations 2012, a fee is required for Discharge of Condition Applications. N.B. Conditions not fully discharged, invalidate the planning permission.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.