ApprovedCouncil status: Decided Permit

Installation of storage building

PRYSMIAN CABLES LTD, CHICKENHALL LANE, EASTLEIGH, SO50 6YU

Eastleigh Borough CouncilReference F/14/75654Full planning

Last published check: 15 Nov 2026, 00:01. Check the council record for more recent changes.

We couldn’t update every section. Some information is from an earlier collection.

Status and dates

Last published check: 15 Nov 2026, 00:01 (UK)

  1. DoneReceived2 Dec 2014
  2. DoneValidated6 Jan 2015
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date7 Apr 2015
  5. DecidedPermit13 Feb 2015

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (4)
  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Decision Date

    Published milestoneCouncil source
  4. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Full planning
Ward
Eastleigh Central
Parish
Eastleigh
Documents
10 published

Proposal

Installation of storage building

Reference
F/14/75654
Ward
Eastleigh Central
Parish
Eastleigh

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

The document list could not be fully refreshed. View the council record for the complete list.

  • Officer Report (1482500)Officer Report13 Feb 2015View
  • Decision Notice (1482499)Decision Notice13 Feb 2015View
  • Consultees Response (1480188)Consultees Response15 Jan 2015View
  • Location Plan (1462901)Location Plan6 Jan 2015View
  • Plans (1448069)Plans2 Dec 2014View
  • Supporting Documents (1448059)Supporting Documents2 Dec 2014View
  • Location Plan (1448072)Location Plan2 Dec 2014View
  • Plans (1448076)Plans2 Dec 2014View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Permit
Decision Notice (1482499)
Planning conditions
  1. (1) The development hereby permitted shall be implemented in accordance with the following plans numbered: 01, 02, 03. Reason: For the avoidance of doubt and in the interests of proper planning.

    (1) Development in accordance with approved plans

  2. (2) The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.

    (2) Start - 3 years

  3. (3) The materials to be used must match as closely as possible, in type, colour and texture those listed in Section 9 of the application form. Reason: To ensure a satisfactory visual relationship of the new development to the existing.

    (3) Materials as Section 11 of application form

  4. Note to Applicant: It is considered that, subject to compliance with the conditions and any obligations attached to this permission, the proposed development is acceptable because it will not materially harm the character of the area, the amenity of neighbours or highway safety and it is in accordance with the policies and proposals of the development plan, comprising the Eastleigh Borough Local Plan Review 2001-2011, and after due regard to all other relevant material considerations including the National Planning Policy Framework and the Submitted Eastleigh Borough Local Plan 2011 - 2029, July 2014 the Submitted Local Plan comprising: the Revised Pre-submission Eastleigh Borough Local Plan 2011 - 2029, published February 2014; and the Schedule of Proposed Minor Changes, submitted to the Secretary of State in July 2014, the local planning authority is of the opinion that permission should be granted. The following development plan saved policies and emerging draft local plan policies are relevant to this decision and the conditions attached to it: Eastleigh Borough Local Plan Review [2001-2011], saved Policies 59.BE, 117.E. Submitted Eastleigh Borough Local Plan 2011 - 2029, July 2014, the Submitted Local Plan, Policies DM1, DM12. In accordance with paragraphs 186 and 187 of the National Planning Policy Framework, Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
  5. Note to Applicant: Southampton Airport have advised that if cranes are to be used in the construction of the development, the operator has a responsibility under the 'British standard code of practice for crane operators' to notify any airport within 6km at least 14 days prior to arrival on site. For further details on this, please contact Mike Glen, Airside Operations Policy and Planning Officer at Southampton International Airport Ltd, Wide Lane, Southampton, SO18 2NL or on 023 8068 7383.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.