ApprovedCouncil status: Decided Permit

Single storey front extension

43 PEGASUS CLOSE, HAMBLE-LE-RICE, SOUTHAMPTON, SO31 4QZ

Eastleigh Borough CouncilReference F/14/75299Full planning

Last published check: 15 Nov 2026, 04:36. Check the council record for more recent changes.

We couldn’t update every section. Some information is from an earlier collection.

Status and dates

Last published check: 15 Nov 2026, 04:36 (UK)

  1. DoneReceived18 Sept 2014
  2. DoneValidated23 Sept 2014
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date18 Nov 2014
  5. DecidedPermit18 Nov 2014

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (4)
  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Decision Date

    Published milestoneCouncil source
  4. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Full planning
Ward
Hamble-le-Rice and Butlocks Heath
Parish
Hamble-le-Rice CP
Documents
13 published

Proposal

Single storey front extension

Reference
F/14/75299
Ward
Hamble-le-Rice and Butlocks Heath
Parish
Hamble-le-Rice CP
Agent
Les Rosenthal - Rosenthal Design Services Limited

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

The document list could not be fully refreshed. View the council record for the complete list.

  • Consultees Response (1444233)Consultees Response19 Nov 2014View
  • Decision Notice (1441841)Decision Notice18 Nov 2014View
  • Officer Report (1441842)Officer Report18 Nov 2014View
  • Consultees Response (1439426)Consultees Response13 Nov 2014View
  • Correspondence incoming (1439435)Correspondence Incoming13 Nov 2014View
  • Application Form (1428524)Application Form21 Oct 2014View
  • Elevations Plan (1416083)Elevations Plan23 Sept 2014View
  • Location Plan (1416086)Location Plan23 Sept 2014View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Permit
Decision Notice (1441841)
Planning conditions
  1. (1) The development hereby permitted shall be implemented in accordance with the following plans numbered: 01, 02, 03, 04, 05, 06. Reason: For the avoidance of doubt and in the interests of proper planning.

    (1) Development in accordance with approved plans

  2. (2) The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.

    (2) Start - 3 years

  3. (3) The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.

    (3) Materials to match existing

  4. (4) No construction, demolition or deliveries to the site shall take place during the construction period except between the hours of 0800 to 1800 Mondays to Fridays or 0800 to 1300 on Saturdays and not at all on Sundays or Bank Holidays. Reason: To protect the amenities of the occupiers of nearby dwellings.

    (4) Construction hours

  5. Note to Applicant: The application site lies on a former training college and the presence of made ground and / or contaminants in the ground cannot be ruled out. Therefore we would recommend that the risks to the development be considered; including the design of the floor construction and the number / location of service penetrations.You should also bring this matter to the attention of the Building Control Officer. British standard BS 10175:2001 Investigation of potentially contaminated site - Code of Practice is a useful source of advice on site investigation. Further information and advice about developing contaminated land can be found on the Council’s website or by contacting the Council’s Environmental Health Team. Should any information come to light during the construction works that indicates the presence, or the possible presence of, 'made ground' or of contaminated soils, then this should be brought to the attention of the Council’s Environmental Health Team . Any excavated material is to be disposed in the appropriate manner and not to be reused on site, unless proven to be 'free' from chemical contamination.
  6. Note to Applicant: It is considered that, subject to compliance with the conditions and any obligations attached to this permission, the proposed development is acceptable because it will not materially harm the character of the area, the amenity of neighbours or highway safety and it is in accordance with the policies and proposals of the development plan, comprising the Eastleigh Borough Local Plan Review 2001-2011, and after due regard to all other relevant material considerations including the National Planning Policy Framework and the Submitted Eastleigh Borough Local Plan 2011 - 2029, July 2014 the Submitted Local Plan comprising: the Revised Pre-submission Eastleigh Borough Local Plan 2011 - 2029, published February 2014; and the Schedule of Proposed Minor Changes, submitted to the Secretary of State in July 2014’, the local planning authority is of the opinion that permission should be granted. The following development plan saved policies and emerging draft local plan policies are relevant to this decision and the conditions attached to it: Eastleigh Borough Local Plan Review [2001-2011], saved Policy 59.BE Submitted Eastleigh Borough Local Plan 2011 - 2029, July 2014, the Submitted Local Plan, Policy DM1 In accordance with paragraphs 186 and 187 of the National Planning Policy Framework, Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.