First floor side extension, front porch and single storey rear extension following demolition of existing porch, single storey side extension and conservatory
First floor side extension, front porch and single storey rear extension following demolition of existing porch, single storey side extension and conservatory
Reference
F/14/74357
Ward
Hiltingbury East
Parish
Chandlers Ford CP
Agent
Barclay & Phillips Architects
Sign in to view all collected council fields and recorded changes.
(1) The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
(1) Start - 3 years
(2) The development hereby permitted shall be implemented in accordance with the following plans numbered: 1822-01 Rev A, 1822-03 Rev F. Reason: For the avoidance of doubt and in the interests of proper planning.
(2) Development in accordance with approved plans
(3) The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
(3) Materials to match existing
(4) No burning of materials obtained by site clearance or any other source shall take place during the demolition, construction and fitting out process. Reason: To protect the amenities of the occupiers of nearby properties.
(4) No burning
(5) No construction, demolition or deliveries to the site shall take place during the construction period except between the hours of 0800 to 1800 Mondays to Fridays or 0900 to 1300 on Saturdays and not at all on Sundays or Bank Holidays. Reason: To protect the amenities of the occupiers of nearby dwellings.
(5) Construction hours
Note to Applicant: It is considered that, subject to compliance with the conditions and any obligations attached to this permission, the proposed development is acceptable because it will not materially harm the character of the area, the amenity of neighbours or highway safety and it is in accordance with the policies and proposals of the development plan, comprising the Eastleigh Borough Local Plan Review [2001-2011], and after due regard to all other relevant material considerations including the National Planning Policy Framework and the Revised Pre-Submission Eastleigh Borough Local Plan [2011-2029] the local planning authority is of the opinion that permission should be granted. The following development plan saved policies and emerging draft local plan policies are relevant to this decision and the conditions attached to it: Eastleigh Borough Local Plan Review 2001-2011, saved Policies [59.BE, 181.LB]. Revised Pre-Submission Eastleigh Borough Local Plan 2011-2029 Policies [DM1]. In accordance with paragraphs 186 and 187 of the National Planning Policy Framework, Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Note to Applicant: Due to the location of the property, adjacent to Hiltingbury Lakes Site of Interets for Nature Conservation, the presence of Priority Woodland birds within the locality and the plans to cut back large shrubs, it is advised that vegetation is checked for birds nests before any pruning or clearance is undertaken. If birds nests are found, vegetation pruning and/or clearance must be delayed until chicks have fledged.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.