ApprovedCouncil status: Decided Permit

Two storey rear extension following removal of existing single storey element

2 WHITE HART ROAD, FAIR OAK, EASTLEIGH, SO50 7JR

Eastleigh Borough CouncilReference F/14/74222Full planning

Last published check: 17 Nov 2026, 17:37. Check the council record for more recent changes.

We couldn’t update every section. Some information is from an earlier collection.

Status and dates

Last published check: 17 Nov 2026, 17:37 (UK)

  1. DoneReceived6 Mar 2014
  2. DoneValidated24 Mar 2014
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date19 May 2014
  5. DecidedPermit18 Jun 2014

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (4)
  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
Application type
Full planning
Ward
Fair Oak and Horton Heath
Parish
Fair Oak and Horton Heath CP
Documents
7 published

Proposal

Two storey rear extension following removal of existing single storey element

Reference
F/14/74222
Ward
Fair Oak and Horton Heath
Parish
Fair Oak and Horton Heath CP
Agent
Derek Moore - Foundation Building South Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

The document list could not be fully refreshed. View the council record for the complete list.

  • Decision Notice (1367714)Decision Notice18 Jun 2014View
  • Officer Report (1367716)Officer Report18 Jun 2014View
  • Block Plan (1309517)Block Plan5 Mar 2014View
  • Plans (1309518)Plans5 Mar 2014View
  • Application Form (1309515)Application Form5 Mar 2014View
  • Plans (1309520)Plans5 Mar 2014View
  • Location Plan (1309521)Location Plan5 Mar 2014View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Permit
Decision Notice (1367714)
Planning conditions
  1. (1) The development hereby permitted shall be implemented in accordance with the following plans numbered: LOC1, BLO2, FBS-326/41, FBS-326/40. Reason: For the avoidance of doubt and in the interests of proper planning.

    (1) Development in accordance with approved plans

  2. (2) The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.

    (2) Start - 3 years

  3. (3) The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.

    (3) Materials to match existing

  4. Note to Applicant: It is considered that, subject to compliance with the conditions and any obligations attached to this permission, the proposed development is acceptable because it will not materially harm the character of the area, the amenity of neighbours or highway safety and it is in accordance with the policies and proposals of the development plan, comprising the Eastleigh Borough Local Plan Review [2001-2011], and after due regard to all other relevant material considerations including the National Planning Policy Framework and the Revised Pre-Submission Eastleigh Borough Local Plan [2011-2029] the local planning authority is of the opinion that permission should be granted. The following development plan saved policies and emerging draft local plan policies are relevant to this decision and the conditions attached to it: Eastleigh Borough Local Plan Review 2001-2011, saved Policy 59.BE Revised Pre-Submission Eastleigh Borough Local Plan 2011-2029 Policy DM1 In accordance with paragraphs 186 and 187 of the National Planning Policy Framework, Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.