(1) The development hereby permitted shall be implemented in accordance with the following plans numbered: 001 Rev A, 002 Rev A, 003 Rev A, 005 Rev B, 006 Rev B. Reason: For the avoidance of doubt and in the interests of proper planning.
(1) Development in accordance with approved plans
(2) The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
(2) Start - 3 years
(3) No development shall start until details and samples of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details. Reason: To ensure a satisfactory visual appearance in the interest of the amenities of the area.
(3) Details - materials samples
(4) No construction or demolition work shall start until a Method Statement has been submitted to, and approved in writing by, the Local Planning Authority. Demolition and construction work shall only take place in accordance with the approved method statement which shall include: a) a programme and phasing of the demolition and construction work, including roads, landscaping and open space; b) location of temporary site buildings, compounds, construction material and plant storage areas used during demolition and construction; c) the arrangements for the routing/ turning of lorries and details for construction traffic access to the site; d) the arrangements for deliveries associated with all construction works, loading/ unloading of plant & materials and restoration of any damage to the highway [including vehicle crossovers and grass verges]. e) the parking of vehicles of site operatives and visitors; f) measures to control the emission of dust and dirt generated by demolition and construction; g) a scheme for controlling noise and vibration from demolition and construction activities (to include piling); h) provision for storage, collection, and disposal of rubbish from the development during construction period; i) measures to prevent mud and dust on the highway during demolition and construction; j) the erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate; k) temporary lighting; l) protection of pedestrian routes during construction; Reason: To limit the impact the development has on the amenity of the locality.
(4) No construction/demolition until Method Statement approved
(5) No development shall start until details for the sustainable disposal of surface water [and disposal of foul sewerage] from the development hereby permitted have been submitted to and approved in writing by the Local Planning Authority. The development shall then accord with the approved details. Reason: To ensure satisfactory provision of foul and surface water drainage.
(5) Details - Sustainable disposal of surface and foul water - pre start
(6) No development shall start until a Code for Sustainable Homes level 4 interim stage certificate and sustainability report demonstrating how all of the essential requirements of the Eastleigh Borough Council adopted Supplementary Planning Document ‘Environmentally Sustainable Development’ are to be met] have been submitted to and approved in writing by the Local Planning Authority. Reason: To ensure the development meets the requirements of the adopted Supplementary Planning Document ‘Environmentally Sustainable Development’.
(6) Code for sustainable homes interim certificate/report - pre start
(7) The development shall not be occupied unless agreed in writing by the Local Planning Authority until a Code for Sustainable Homes level 4 final stage certificate and sustainability report [highlighting how all of the essential requirements of the Eastleigh Borough Council adopted Supplementary Planning Document ‘Environmentally Sustainable Development’ have been met] have been submitted to and approved in writing by the Local Planning Authority. Reason: To ensure the development meets the requirements of the adopted Supplementary Planning Document ‘Environmentally Sustainable Development’.
(7) Code for sustainable homes final certificate/report - pre occupation
(8) Before any equipment, materials or machinery are brought onto the site for the purposes of development, a pre-commencement site meeting between the Tree Officer, Arboricultural Consultant and Site Manager shall take place to confirm the protection of trees on and adjacent to the site in accordance with the Arboricultural Report prepared by Alderwood Consulting Limited dated 6th May 2014 (ref. D1429AIAL1). The tree protection shall be positioned as shown on the Tree Protection Plan, before any equipment, materials or machinery are brought onto the site for the purposes of the development. The tree protection shall be retained until the development is completed and nothing shall be placed within the fencing, nor shall any ground levels be altered or excavations made without the written consent of the Local Planning Authority. This condition shall not be discharged until an arboricultural supervision statement, the contents of which are to be discussed and agreed at the pre-commencement meeting, is submitted to and approved in writing by the Local Planning Authority on completion of development. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality.
(9) No development shall start until a site meeting [attended by the Arboricultural Consultant and Site Manager] has taken place where a representative from the Local Planning Authority has inspected and approved the fencing and signed the card which accompanies this decision notice. Once approved no access by vehicles, storage or use of machinery, equipment or materials shall take place within the fenced area. The fencing shall be retained in its approved form for the duration of the work. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality.
(9) Protective fencing - pre start meeting
(10) No burning of materials obtained by site clearance or any other source shall take place during the demolition, construction and fitting out process. Reason: To protect the amenities of the occupiers of nearby properties.
(10) No burning
(11) No construction, demolition or deliveries to the site shall take place during the construction period except between the hours of 0800 to 1800 Mondays to Fridays or 0900 to 1300 on Saturdays and not at all on Sundays or Bank Holidays. Reason: To protect the amenities of the occupiers of nearby dwellings.
(11) Construction hours
(12) All first floor window side windows shall either be: a) obscure glazed to Pilkingtons level 3 or equivalent with no more than a top-hung opening toplight: OR b) positioned at least 1.7 metres above the floor of the room in which they are installed. Once installed the window[s] shall be permanently maintained in that condition. Reason: To protect the amenity and privacy of the adjoining residential properties.
(12) Windows - obscurity/positioning/opening procedure
(13) The development hereby permitted shall not be occupied until the parking areas including the garage have been provided in accordance with the approved plans and thereafter permanently retained and used only for the purpose of accommodating private motor vehicles incidental to the enjoyment of the dwelling house as a residence. Reason: To make provision for off street parking for the purpose of highway safety.
(13) Provision of parking prior to occupation
Note to Applicant: It is considered that, subject to compliance with the conditions and any obligations attached to this permission, the proposed development is acceptable because it will not materially harm the character of the area, the amenity of neighbours or highway safety and it is in accordance with the policies and proposals of the development plan, comprising the Eastleigh Borough Local Plan Review [2001-2011], and after due regard to all other relevant material considerations including the National Planning Policy Framework and the Revised Pre-Submission Eastleigh Borough Local Plan [2011-2029] the local planning authority is of the opinion that permission should be granted. The following development plan saved policies and emerging draft local plan policies are relevant to this decision and the conditions attached to it: Eastleigh Borough Local Plan Review 2001-2011, saved Policy 28.ES, 34.ES, 43.ES. 59.BE Revised Pre-Submission Eastleigh Borough Local Plan 2011-2029 Policy DM1, DM2, DM4, DM24, DM25 In accordance with paragraphs 186 and 187 of the National Planning Policy Framework, Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner. Under the Town and Country Planning [England] Regulations 2012, a fee is now required for Discharge of Condition Applications. N.B. Conditions not fully discharged, invalidate the planning permission.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.