(1) The development hereby permitted shall be implemented in accordance with the following plans numbered: LOC 1, 1402/01, 401/02, 402/03, 400/04, 402/05, 402/06, 402/07 & 402/08. Reason: For the avoidance of doubt and in the interests of proper planning.
(1) Development in accordance with approved plans
(2) The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
(2) Start - 3 years
(3) The materials and detailing to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing dwelling. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
(3) Materials to match existing
(4) The first floor windows on the western elevation shall either be: a) obscure glazed to Pilkingtons level 3 or equivalent and have no opening part less than 1.7 metres above the floor level of the room/s which they serves: OR b) positioned at least 1.7 metres above the floor of the room/s in which they are installed. Reason: To protect the amenity and privacy of the adjoining residential properties.
(4) Windows - obscurity/positioning/opening procedure
(5) No construction, demolition or deliveries to the site shall take place during the construction period except between the hours of 0800 to 1800 Mondays to Fridays or 0900 to 1300 on Saturdays and not at all on Sundays or Bank Holidays. Reason: To protect the amenities of the occupiers of nearby dwellings.
(5) Construction hours
(6) No burning of materials obtained by site clearance or any other source shall take place during the demolition, construction and fitting out process. Reason: To protect the amenities of the occupiers of nearby properties.
(6) No burning
Note to Applicant: The application site is located adjacent to the site of a former brick works, as shown on historical ordnance survey mapping and has the potential to be affected by ground contamination / gases / vapours. It is recommended that this be taken into consideration in the construction of the approved extensions and discussed with your Building Control Surveyor.
Note to Applicant: It is considered that, subject to compliance with the conditions and any obligations attached to this permission, the proposed development is acceptable because it will not materially harm the character of the area, the amenity of neighbours or highway safety and it is in accordance with the policies and proposals of the development plan, as listed below, and after due regard to all other relevant material considerations including the National Planning Policy Framework and the emerging draft Eastleigh Borough Local Plan [2011 - 2029] the local planning authority is of the opinion that permission should be granted. The following development plan saved policies and emerging draft local plan policies are relevant to this decision and the conditions attached to it: Eastleigh Borough Local Plan Review 2001-2011, saved Policy [59.BE]. Pre-submission Eastleigh Borough Local Plan 2011-2029 Policy [DM1]. In accordance with paragraphs 186 and 187 of the National Planning Policy Framework, Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.