ApprovedCouncil status: Decided Permit

Construction of multi use games area with 3m high fencing & 6no. 5m high lamp columns for games area & 4no. car park lights

KING'S COMMUNITY CHURCH, UPPER NORTHAM ROAD, HEDGE END, SOUTHAMPTON, SO30 4BZ

Eastleigh Borough CouncilReference F/13/72659Full planning

Last published check: 18 Nov 2026, 03:05. Check the council record for more recent changes.

We couldn’t update every section. Some information is from an earlier collection.

Status and dates

Last published check: 18 Nov 2026, 03:05 (UK)

  1. DoneReceived3 Jun 2013
  2. DoneValidated16 Jul 2013
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date10 Sept 2013
  5. DecidedPermit10 Sept 2013

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (4)
  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Decision Date

    Published milestoneCouncil source
  4. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Full planning
Ward
Hedge End St. Johns
Parish
Hedge End CP
Documents
28 published

Proposal

Construction of multi use games area with 3m high fencing & 6no. 5m high lamp columns for games area & 4no. car park lights

Reference
F/13/72659
Ward
Hedge End St. Johns
Parish
Hedge End CP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

The document list could not be fully refreshed. View the council record for the complete list.

  • Discharge of Conditions (1351469)Discharge Of Conditions15 May 2014View
  • Discharge of Conditions (1351474)Discharge Of Conditions15 May 2014View
  • Discharge of Conditions (1351471)Discharge Of Conditions15 May 2014View
  • Discharge of Conditions (1351467)Discharge Of Conditions15 May 2014View
  • Discharge of Conditions (Public Version of 1303589)Discharge Of Conditions24 Feb 2014View
  • Supporting Documents (1331775)Supporting Documents3 Feb 2014View
  • Supporting Documents (1289059)Supporting Documents31 Jan 2014View
  • Supporting Documents (1289062)Supporting Documents31 Jan 2014View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Permit
Decision Notice (1206494)
Planning conditions
  1. (1) The development hereby permitted shall be implemented in accordance with the following plans numbered: RTCS 131_MUGA REV B, RTCS 131_LAYOUT REV B, RTCS 131_SPECS REV B, RTCS 131_LOCATION REV B, 06195-LO1.02 REV A Reason: For the avoidance of doubt and in the interests of proper planning.

    (1) Development in accordance with approved plans

  2. (2) The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.

    (2) Start - 3 years

  3. (3) No development shall start until an Arboricultural Impact Assessment, Method Statement, Tree Survey and a protective fencing plan has been submitted to and approved in writing by the Local Planning Authority. The development must accord with the approved details and to the appropriate British Standard. Reason - To retain and protect the existing trees which form an important part of the amenity of the locality.

    Arboricultural Impact Assessment, Method Statement, Tree Survey and protective fencing plan - pre start

  4. (4) No development shall start until a site meeting attended by the Arboricultural Consultant and Site Manager has taken place where a representative from the Local Planning Authority has inspected and approved the fencing and signed the card which accompanies this decision notice. Once approved no access by vehicles, storage or use of machinery, equipment or materials shall take place within the fenced area. The fencing shall be retained in its approved form for the duration of the work. Reason - To retain and protect the existing trees which form an important part of the amenity of the locality.

    (4) Protective fencing - pre start meeting

  5. (5) Before the development commences, or by such later date as the Local Planning Authority may determine, a landscape scheme comprising planting, must be submitted to, and approved in writing by the Local Planning Authority. Such a scheme must include a planting specification and schedule, and shall indicate the position, size, number, planting density and species of shrubs and replacement trees, including vegetation which maintains a continuous high bat foraging flight line. The planting scheme must include details of phasing, timing and provision for management and maintenance during the first five years from the date of planting. Reason: To ensure that the appearance of the development is satisfactory.
  6. (6) The landscape scheme must be completed within 12 months from the completion of the MUGA, or by such later date as the Local Planning Authority may determine. Any trees or plants which die, are removed or become seriously damaged or diseased during the first five years must be replaced during the next planting season with others of similar size and species unless the Local Planning Authority gives written consent to any variation. Reason: To ensure that the appearance of the development is satisfactory.
  7. (7) All hard & soft landscaping, tree planting and boundary treatment shall be carried out in accordance with the approved details and to the appropriate British Standard. For a period of 5 years after planting, any trees or plants which are removed, die or become seriously damaged or defective, shall be replaced as soon as is reasonably practicable with others of the same species, size and number as originally approved in the landscaping scheme. Reason: In the interests of the visual amenity of the locality and to safeguard the amenities of neighbouring residents.

    (7) Landscaping to British Standard and maintained for 5 years

  8. (8) No development shall start until details for the sustainable disposal of surface water from the development hereby permitted have been submitted to and approved in writing by the Local Planning Authority. The development shall then accord with the approved details. Reason: To ensure satisfactory provision of foul and surface water drainage.

    (8) Details - Sustainable disposal of surface and foul water - pre start

  9. (9) The MUGA hereby permitted shall not be used for any purpose except between the hours of 09:00 to 22:00 Monday to Sundays. Reason: To protect the amenities of the occupiers of nearby properties.

    (9) No operation of machinery/processes outside hours stated

  10. (10) The lamp columns used in association with the MUGA hereby permitted shall not be lit except between the hours of 09:00 to 22:00 Monday to Sundays. Reason: To protect the amenities of the occupiers of nearby properties.
  11. (11) The lighting element of the lamp columns hereby approved shall be shielded and angled in a manner so that light is directed towards the MUGA courts or parking spaces to which they relate. Reason: In order to avoid light pollution and to protect residential amenities and the countryside.
  12. Note to applicant: The connection of the proposed french drain to the ditch may require formal consent from Hampshire County Council. Before any work commences you are therefore requires to contact Hampshire County Council Ordinary Watercourse Team on 01962 845581 or owc@hants.gov.uk. An explanitory leaflet of different forms of connections to the ditch is attached for your information.

    Connection to ditch

  13. Note to Applicant: It is considered that, subject to compliance with the conditions and any obligations attached to this permission, the proposed development is acceptable because it will not materially harm the character of the area, the amenity of neighbours or highway safety and it is in accordance with the policies and proposals of the development plan, comprising the Eastleigh Borough Local Plan Review [2001-2011], and after due regard to all other relevant material considerations including the National Planning Policy Framework and the emerging pre-submission Eastleigh Borough Local Plan [2011-2029] the local planning authority is of the opinion that permission should be granted. The following development plan saved policies and emerging draft local plan policies are relevant to this decision and the conditions attached to it: Eastleigh Borough Local Plan Review 2001-2011, saved Policies 1.CO, 2.C0, 18.CO, 20.CO, 25.NC, 45.ES, 59.BE, 100.T, 101.T, 104.T, 148.OS, 157.OS, 160.TA, 186.IN Pre-submission Eastleigh Borough Local Plan 2011-2029 Policies S5, S8, DM1, DM6, DM9, DM23, DM24 , DM33, DM35, DM37 In accordance with paragraphs 186 and 187 of the National Planning Policy Framework, Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner. Under the Town and Country Planning [England] Regulations 2012, a fee is now required for Discharge of Condition Applications. N.B. Conditions not fully discharged, invalidate the planning permission.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.