RefusedCouncil status: Decided Refuse Planning Permission For
Alterations & extensions to roof at ground floor & 2nd floor to form 2no. additional bedrooms at 2nd floor level. Formation of parking bay with access from Satchell Lane
Alterations & extensions to roof at ground floor & 2nd floor to form 2no. additional bedrooms at 2nd floor level. Formation of parking bay with access from Satchell Lane
Reference
F/13/72464
Ward
Hamble-le-Rice and Butlocks Heath
Parish
Hamble-le-Rice CP
Agent
Mr J Tyrrell - MTA Architects Ltd
Sign in to view all collected council fields and recorded changes.
(1) The proposed development would result in a bulk and design of building that would distort the shape of the roof and sit in contrast to the original design and form of the terrace. The development would result in an incongruous feature that would harm the character and appearance of the area contrary to requirements of policy 59.BE of the Eastleigh Borough Local Plan (2001-2011), policy DM1 of the Pre Submission Eastleigh Borough Council Local Plan (2011 - 2029) and guidance contained with 'Quality Places' Supplementary Planning Document 2011
Note to Applicant: The application was refused following the assessment of the following plans: 3272/SO1A, 3272/03A. In accordance with paragraphs 186 and 187 of the National Planning Policy Framework, Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.