(1) The development hereby permitted shall be carried out in accordance with the following approved plans: 013/245/A1a. Reason: For the avoidance of doubt and in the interests of proper planning.
(2) The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
(2) Start - 3 years
(3) The materials to be used must match as closely as possible, in type, colour and texture those listed in Section 11 of the application form and as set out in the design statement dated 12th March 2013. Reason: To ensure a satisfactory visual relationship of the new development to the existing.
(3) Materials as Section 11 of application form
(4) Within 3 months of the barn being brought into use the existing buildings [coloured red on the approved site plan] and resultant materials shall be removed from the site Reason: To protect the amenities of the countryside location.
(4) Removal of building/demolished materials - pre use starting
(5) The barn hereby permitted shall only be used for agricultural purposes in connection with Oaklands Farm. Reason: To protect the amenities of the countryside location and due to the specific requirements of the small holding. .
(5) Development to be used in conjunction with existing dwelling - domestic purposes only
Note to Applicant: It is considered that, subject to compliance with the conditions and any obligations attached to this permission, the proposed development is acceptable because it will not materially harm the character of the area, the amenity of neighbours or highway safety and it is in accordance with the policies and proposals of the development plan, as listed below, and after due regard to all other relevant material considerations including the National Planning Policy Framework and the emerging draft Eastleigh Borough Local Plan [2011 - 2029] the Local Planning Authority is of the opinion that permission should be granted. The following development plan saved policies and emerging draft local plan policies are relevant to this decision and the conditions attached to it: Eastleigh Borough Local Plan Review 2001-2011, saved Policies 1.CO, 10.CO & 59.BE. Pre-submission Eastleigh Borough Local Plan 2011-2029 Policies S8, DM1 & DM16. In accordance with paragraphs 186 and 187 of the National Planning Policy Framework, Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.