(1) The development hereby permitted shall be carried out in accordance with the following approved plans: P01, P02, P03, P04, P05, P06 & P07. Reason: For the avoidance of doubt and in the interests of proper planning.
(2) The development hereby permitted must be begun within a period of three years beginning with the date on which this permission is granted. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
(2) Commencement 3 years
(3) The materials to be used must match as closely as possible, in type, colour and texture, those on the existing building. Reason: To ensure a satisfactory visual relationship of the new development to the existing.
(3) Materials to match existing building
(4) No construction or demolition work must take place except between the hours 0800 to 1800 Mondays to Fridays or 0900 to 1300 on Saturdays and not at all on Sundays or Bank Holidays. Reason: To protect the amenities of the occupiers of nearby dwellings.
(4) Construction hours
(5) No burning of materials obtained by site clearance or from any other source to take place on this site during the construction and fitting out process. Reason: To protect those trees which are subject to preservation order and in the interests of amenity.
(5) No burning from any source
(6) The roof light windows at first floor level on the north-eastern and south-western side elevations must be glazed with obscure glass and fixed shut or positioned so that their bottom cills are at least 1.7 metres above the floor level of the room which they serve and must be maintained in that condition. Reason: To preserve the amenity of the adjoining properties.
(6) Obscure gazing as stated
(7) The development hereby permitted must not be brought into use until the areas shown on approved plan 'P01' for the parking of vehicles shall have been made available and surfaced, and the areas must be retained and reserved for that purpose at all times. Reason: In the interests of highway safety/amenity.
(7) Parking areas as approved plan prior to use commencing
Note to Applicant: Please be aware that the site may be subject to potential ground contamination due to the former use of the site as a brick works. It is recommended that this is brought to the attention of your Building Control Officer. For further information please contact the Environmental Health Unit on 023 8068 8490.
Note to Applicant: It is considered that, subject to compliance with the conditions and any obligations attached to this permission, the proposed development is acceptable because it will not materially harm the character of the area, the amenity of neighbours or highway safety and it is in accordance with the policies and proposals of the development plan, as listed below, and after due regard to all other relevant material considerations the local planning authority is of the opinion that permission should be granted. The following development plan policies are relevant to this decision and the conditions attached to it: Eastleigh Borough Local Plan Review 2001-2011, saved Policy [59.BE].
Note to applicant: development acceptable subject to conditions
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.