ApprovedCouncil status: Decided Permit

Construction of front porch

33 OSBORNE CLOSE, ROYAL VICTORIA COUNTRY PARK, NETLEY ABBEY, SOUTHAMPTON, SO31 5GX

Eastleigh Borough CouncilReference F/12/70906Full planning

Last published check: 19 Nov 2026, 15:22. Check the council record for more recent changes.

We couldn’t update every section. Some information is from an earlier collection.

Status and dates

Last published check: 19 Nov 2026, 15:22 (UK)

  1. DoneReceived21 May 2012
  2. DoneValidated21 May 2012
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedPermit16 Jul 2012

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (3)
  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Decision Date

    Published milestoneCouncil source
Application type
Full planning
Ward
Netley Abbey
Parish
Hound CP
Documents
8 published

Proposal

Construction of front porch

Reference
F/12/70906
Ward
Netley Abbey
Parish
Hound CP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

The document list could not be fully refreshed. View the council record for the complete list.

  • Decision Notice (956245)Decision Notice16 Jul 2012View
  • Officer Report (956248)Officer Report16 Jul 2012View
  • Location Plan (924233)Location Plan21 May 2012View
  • Roof Plan (924241)Roof Plan21 May 2012View
  • Application Form (Public Version of 924219)Application Form21 May 2012View
  • Elevations and Floor Plan (924239)Elevations And Floor Plan21 May 2012View
  • Block Plan (924234)Block Plan21 May 2012View
  • Elevations and Floor Plan (924237)Elevations And Floor Plan21 May 2012View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Permit
Decision Notice (956245)
Planning conditions
  1. (1) The development hereby permitted shall be carried out in accordance with the following approved plans: Loc 01, Blo 02, 03, 04, 05. Reason: For the avoidance of doubt and in the interests of proper planning.
  2. (2) The development hereby permitted must be begun within a period of three years beginning with the date on which this permission is granted. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.

    (2) Commencement 3 years

  3. (3) The materials to be used must match as closely as possible, in type, colour and texture, those on the existing building. Reason: To ensure a satisfactory visual relationship of the new development to the existing.

    (3) Materials to match existing building

  4. Note to Applicant: It is considered that, subject to compliance with the conditions and any obligations attached to this permission, the proposed development is acceptable because it will not materially harm the character of the area, the amenity of neighbours or highway safety, and it is in accordance with the policies and proposals of the development plan, as listed below, and after due regard to all other relevant material considerations the local planning authority is of the opinion that permission should be granted. The following development plan policies are relevant to this decision and the conditions attached to it: Eastleigh Borough Local Plan Review 2001-2011, saved Policies 2.C0, 9.C0, 59.BE.

    Note to applicant: development acceptable subject to conditions

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.