ApprovedCouncil status: Decided Permit

Single storey side & rear extension

17 QUOB LANE, WEST END, SOUTHAMPTON, SO30 3GJ

Eastleigh Borough CouncilReference F/11/70064Full planning

Last published check: 21 Nov 2026, 21:10. Check the council record for more recent changes.

We couldn’t update every section. Some information is from an earlier collection.

Status and dates

Last published check: 21 Nov 2026, 21:10 (UK)

  1. DoneReceived22 Nov 2011
  2. DoneValidated12 Dec 2011
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date6 Feb 2012
  5. DecidedPermit6 Feb 2012

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (4)
  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Decision Date

    Published milestoneCouncil source
  4. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Full planning
Ward
West End North
Parish
West End CP
Documents
8 published

Proposal

Single storey side & rear extension

Reference
F/11/70064
Ward
West End North
Parish
West End CP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

The document list could not be fully refreshed. View the council record for the complete list.

  • Officer Report (861287)Officer Report6 Feb 2012View
  • Decision Notice (861292)Decision Notice6 Feb 2012View
  • Location Plan (826035)Location Plan11 Dec 2011View
  • Floor Plan (815517)Floor Plan22 Nov 2011View
  • Elevations Plan (815520)Elevations Plan22 Nov 2011View
  • Elevations Plan (815515)Elevations Plan22 Nov 2011View
  • Application Form (815510)Application Form22 Nov 2011View
  • Location Plan (815523)Location Plan22 Nov 2011View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Permit
Decision Notice (861292)
Planning conditions
  1. (1) The development hereby permitted shall be carried out in accordance with the following approved plans: Quob-0211-001 B, Quob-0211-002 C, Quob-0211-003 D, Quob-0211-04 A, Quob-0211-005. Reason: For the avoidance of doubt and in the interests of proper planning.
  2. (2) The development hereby permitted must be begun within a period of three years beginning with the date on which this permission is granted. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.

    (2) Commencement 3 years

  3. (3) The materials to be used must match as closely as possible, in type, colour and texture, those on the existing building. Reason: To ensure a satisfactory visual relationship of the new development to the existing.

    (3) Materials to match existing building

  4. Note to Applicant: It is considered that, subject to compliance with the conditions and any obligations attached to this permission, the proposed development is acceptable because it will not materially harm the character of the area, the amenity of neighbours or highway safety, and it is in accordance with the policies and proposals of the development plan, as listed below, and after due regard to all other relevant material considerations the local planning authority is of the opinion that permission should be granted. The following development plan policies are relevant to this decision and the conditions attached to it: Eastleigh Borough Local Plan Review 2001-2011, saved Policies 59.BE.

    Note to applicant: development acceptable subject to conditions

  5. Note to Applicant: Under the terms of Section 109 of the Water Resources Act 1991, and the Southern Region Land Drainage and Sea Defence Byelaws, the prior written consent of the Environment Agency is required for any proposed works or structures, in, under, over or within 8 metres of the top of the bank of a main river or any proposed works or structures within 15 metres of a sea defence. This permission is separate from planning permission and cannot be considered retrospectively. Please be aware that the Environment Agency has up to two months to determine applications for Flood Defence Consent and you are therefore advised to contact the local Environment Agency Office as soon as possible to discuss making an application. Consent will only be issued if the works do not pose a flood risk to people and property, and do not conflict with the Environment Agency's other duties.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.