(1) The mobile home and other associated structures on the application site fail to respect the character and appearance of the site or the surrounding countryside, being overly prominent and visually diminishing the Horton Heath and Hedge End Local Gap to the detriment of the visual amenity and general character of the surrounding area. The application is therefore considered to be contrary to saved Policies 3.CO, 18.CO, 59.BE i. and 87.H iii. of the Eastleigh Borough Local Plan Review (2001-2011).
1) The use hereby permitted shall be for a limited period being the period of 3 years from the date of this decision. At the end of this period the use hereby permitted shall cease, all caravans, structures, materials and equipment brought on to the land in connection with the use shall be removed, and the land restored to its former condition in accordance with the site development scheme referred to in condition 5 below.
2) The site shall not be occupied by any persons other than gypsies and travellers as defined in paragraph 15 of ODPM Circular 01/2006.
3) No more than two caravans, as defined in the Caravan Sites and Control of Development Act 1960 and the Caravan Sites Act 1968 (of which no more than one shall be a static caravan) shall be stationed on the site at any time.
4) No non-equestrian commercial activities shall take place on the land, including the external storage of materials, and no vehicle over 3.5 tonnes shall be stationed, parked or stored on the land.
5) The use hereby permitted shall cease and all caravans, structures, equipment and materials brought onto the land for the purposes of such use shall be removed within 28 days of the date of failure to meet any one of the requirements set out in (i) to (iv) below:
i) within 3 months of the date of this decision a site development scheme shall have been submitted for the written approval of the local planning authority. The scheme shall include: the internal layout of the site, including the position of the caravans, the extent of hardstanding, parking and amenity areas; proposed and existing external lighting on the boundary of and within the site; the means of foul and surface water drainage of the site; the positions, design, materials and type of boundary treatment; tree, hedge and shrub planting including details of species, plant sizes and proposed numbers and densities; a specification for the restoration of the land following the cessation of the use; a timetable for implementation of the scheme.
ii) if within 11 months of the date of this decision the site development scheme has not been approved by the local planning authority or, if the local planning authority refuse to approve the scheme, or fail to give a decision within the prescribed period, an appeal shall have been made to, and accepted as validly made by, the Secretary of State.
iii) if an appeal is made in pursuance of (ii) above, that appeal shall have been finally determined and the submitted site development scheme shall have been approved by the Secretary of State.
iv) the approved scheme shall have been carried out and completed in accordance with the approved timetable.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.