(1) The development hereby permitted shall be carried out in accordance with the following approved plans: 21870-EX-01A, 28170-EX-2A extg. floor plans, 21870-EX-02A extg. elevs, 21870-PR-03A prop. plans, 21870-PR-03A prop. elevs. Reason: For the avoidance of doubt and in the interests of proper planning.
(2) The development hereby permitted must be begun within a period of three years beginning with the date on which this permission is granted. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
(2) Commencement 3 years
(3) The materials to be used must match as closely as possible, in type, colour and texture, those on the existing building. Reason: To ensure a satisfactory visual relationship of the new development to the existing.
(3) Materials to match existing building
(4) Any hard standing to be laid between the principal elevation of the property and the highway must be made of porous materials or provision must be made to direct surface run-off water to a permeable or porous area within the curtilage of the property. Reason: To ensure satisfactory provision of surface water drainage.
(5) The development hereby permitted must not be brought into use until areas for the parking, loading and unloading of vehicles in accordance with a scheme to be approved in writing by the Local Planning Authority must have been provided and the areas shall be surfaced and subsequently retained and kept available at all times for these purposes. Reason: In the interests of highway safety.
(5) Scheme for areas for parking/unloading prior to use commencing
Note to Applicant: It is considered that, subject to compliance with the conditions and any obligations attached to this permission, the proposed development is acceptable because it will not materially harm the character of the area, the amenity of neighbours or highway safety, and it is in accordance with the policies and proposals of the development plan, as listed below, and after due regard to all other relevant material considerations the local planning authority is of the opinion that permission should be granted. The following development plan policies are relevant to this decision and the conditions attached to it: Eastleigh Borough Local Plan Review 2001-2011, saved Policies 59.BE. Under the Town and Country Planning [Fees for Applications and Deemed Applications][Amendment][England] Regulation 2008, a fee is now required for Discharge of Condition Applications. N.B. Conditions not fully discharged, invalidate the planning permission.
Note to applicant: development acceptable subject to conditions
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.