(1) The proposed extensions and alterations, by reason of their resulting mass, scale, bulk, form and design would introduce a feature of unwelcome prominence within the existing street scene and would be at odds with the prevailing character of this section of Hocombe Road and Nichol Road to the detriment of the character and visual amenity of the Special Policy Area, as well as the appearnce of the application dwelling.The proposals are therefore considered to be contrary to saved Policies 59.BE and 181.LB of the Eastleigh Borough Local Plan Review (2001-2011) and Supplementary Planning Document: Chandler's Ford and Hiltingbury Chracter Areas 2005.
(1) This planning decision is in accordance with the following plans numbered: 389/01, 398/02, 398/11 and 398/12. Reason: To ensure that the development is completed in accordance with the approved plans.
(2) The development hereby permitted must be begun within a period of three years beginning with the date on which this permission is granted. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
(2) Commencement 3 years
(3) Samples of all external facing and roofing materials must be submitted to and approved in writing by the Local Planning Authority before development commences. The development must then accord with these approved details. Reason: To ensure that the external appearance of any building is satisfactory.
(3) Samples facing & roofing materials-pre commencement
(4) The first floor window in the west elevation of the extension hereby permitted serving the bathroom shall be glazed in obscure glass and thereafter retained. Reason: To protect the amenity and privacy of the adjoining residential properties.
(4) Obscure gazing as stated
(5) No burning of materials obtained by site clearance or from any other source to take place on this site during the construction and fitting out process. Reason: In the interests of amenity.
(5) No burning from any source
(6) There shall be no driven piling on site. Reason: To protect the amenity of occupiers of adjoining residential properties.
(6) No driven piling
(7) No construction or demolition work must take place except between the hours 0800 to 1800 Mondays to Fridays or 0900 to 1300 on Saturdays and not at all on Sundays or Bank Holidays. Reason: To protect the amenities of the occupiers of nearby dwellings.
(7) Construction hours
(8) Any resultant materials following demolition shall be salvaged and utilised in the construction of the development hereby permitted. Reason: In the interests of sustainable building.
(8) Reuse of materials
(9) The boundary hedge identified on the east boundary shall be retained and maintained at a minimum height of 2.0 metres in good condition and where necessary reinforced with appropriate species to be agreed in writing with the Local Planning Authority. The new planting shall be completed before the end of the first planting season following the completion of the development hereby permitted. Reason: In the interests of visual amenity.
(9) Define boundary treatment
Note to Applicant: It is considered that, subject to compliance with the conditions and any obligations attached to this permission, the proposed development is acceptable because it will not materially harm the character of the area, the amenity of neighbours or highway safety, and it is in accordance with the policies and proposals of the development plan, as listed below, and after due regard to all other relevant material considerations the local planning authority is of the opinion that permission should be granted. The following development plan policies are relevant to this decision and the conditions attached to it: Eastleigh Borough Local Plan Review 2001-2011, saved Policies 59.BE, 181.LB. Under the Town and Country Planning [Fees for Applications and Deemed Applications][Amendment][England] Regulation 2008, a fee is now required for Discharge of Condition Applications. N.B. Conditions not fully discharged, invalidate the planning permission.
Note to applicant: development acceptable subject to conditions
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.