(1) This planning decision is in accordance with the following plans numbered: LOC 01, 01C, 02. Reason: To ensure that the development is completed in accordance with the approved plans.
(2) The development hereby permitted must be begun within a period of three years beginning with the date on which this permission is granted. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
(2) Commencement 3 years
(3) Details and samples of all external facing and roofing materials must be submitted to and approved in writing by the Local Planning Authority before development commences. The development must then accord with these approved details. Reason: To ensure that the external appearance of any building is satisfactory.
(3) Details & samples facing/roofing materials - pre commencement
(4) The domestic curtilage of the site of the new dwelling is to be confined to the area within the redline as shown on the approved plan number 01. Reason: In the interests of protecting the character and appearance of the surrounding countryside area.
(5) The existing building must be demolished and all resultant materials removed from the site before development pursuant to this permission is commenced. Reason: The site is not suitable to accommodate both the existing and the proposed buildings.
(5) Removal of existing before development commences
(6) Plans and particulars showing the proposals for all the following aspects of the development must be submitted to and approved in writing by the Local Planning Authority before the development is commenced. The development must then accord with these approved details. Reason: In order that these matters may be considered by the Local Planning Authority.
(6) Details-proposals-pre commencement
a: The ground floor levels above ordnance datum of all buildings.
d: Ground floor levels
b: The alignment, height and materials of all walls, fences and other means of enclosure
e: Means of enclosure
c: The layout of foul sewers and surface water drains.
g: Sewers/surface water
(7) The development hereby permitted must not be brought into use until adequate turning space shall have been constructed within the curtilage to enable vehicles to enter and leave in a forward gear and this must be maintained and be kept available for that purpose at all times. Reason: In the interests of highway safety.
(7) Turning space prior to use commencing
(8) The development hereby permitted must not be brought into use until areas for the parking, loading and unloading of vehicles in accordance with a scheme to be approved in writing by the Local Planning Authority must have been provided and the areas shall be surfaced and subsequently retained and kept available at all times for these purposes. Reason: In the interests of highway safety.
(8) Scheme for areas for parking/unloading prior to use commencing
(9) Machinery, equipment or construction materials must not be stored, moved or used within the Site of Importance for Nature Conservation either during or after construction in line with the construction exclusion zone identified on plan 10244 BT2 of the Arboricultural Impact Appraisal and Method Statement dated 16 December 2010 . Reason: To protect the SINC & to comply with Policy 23.NC of the Eastleigh Borough Local Plan Review 2001-2011.
(10) All mitigation measures for reptile protection recommended as part of the Ecological Assessment Report dated October 2010 shall be fully complied with. Reason: To protect reptile species & to comply with the guidance as set out in Planning Policy Statement 9: Biodiversity and Geological Conservation
(11) Prior to the commencement of development, details of the bat enhancement features which will be incorporated into the new buildings will be submitted to the Council. Once approved, the development should proceed in accordance with the approved features. Reason: to enhance biodiversity - Policy 26.NC of the Eastleigh Borough Local Plan Review 2001-2011.
(12) The details and recommendations contained within the Arboricultural Impact Appraisal and Method Statement in accordance with BS : 5837:2005) produced Barrell Tree Consultancy dated 16.12.10 and submitted with the application, must be followed in full throughout the construction process. Reason: To ensure trees on site are protected.
(13) Following erection of temporary tree protection measures (fencing, ground protection etc) on site but prior to the commencement of any construction works, a site meeting with the Council's Tree Services Manager [023 8068 8471], the applicant and their arboricultural consultant shall be arranged and no work is to begin until the Tree Services Manager is satisfied that the protection measures erected are satisfactory. These protection measures must then be retained throughout the development of the site. Reason: To ensure trees on site are protected.
(14) Before the development commences, a landscape scheme comprising planting, details of hard surfacing and means of enclosure must be submitted to, and approved in writing by the Local Planning Authority. Such a scheme must include a planting specification and schedule, and shall indicate the position, size, number, planting density and species of shrubs and trees to include details of replacement hedging to infill the western boundary where T14, G12-G13 have been removed, what works are proposed within the new garden area and treatment of the remaining site area. . A seed or turf specification must be provided for areas to be grassed. The planting scheme must include details of phasing, timing and provision for management and maintenance during the first ten years from the date of planting. Reason: To ensure that the appearance of the development is satisfactory.
(14) Landscape scheme/10 yr maintenance - pre commencement
(15) The landscape scheme must be completed within 12 months from the completion of the last building shell, or by such later date as the Local Planning Authority may determine. Any trees or plants which die, are removed or become seriously damaged or diseased during the first five years must be replaced during the next planting season with others of similar size and species unless the Local Planning Authority gives written consent to any variation. Reason: To ensure that the appearance of the development is satisfactory.
(15) Landscape scheme 12 months from completion of last shell
(16) Development shall not begin until a scheme of work detailing the extent and of piling proposed has been submitted to and approved in writing by the Local Planning Authority. Reason: To protect the amenity of occupiers of adjoining residential properties.
(16) Details of piling
(17) ) Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (or any Order revoking and re-enacting with or without modifications) no development permitted by Classes A & E of Part 1 of Schedule 2 of that Order, and provision of the Town and Country Planning (General Permitted Development) Order 1995, Part 2 of Schedule 2 (including hedges, trees, shrubs or drainage works) must be constructed or planted on the area since coloured green on the approved plan 01C without the prior written consent of the Local Planning Authority. Reason: To allow for possible future road improvements in line with Policy 91.T.
(17) No structures/planting on area coloured green
(18) No piling work shall be carried out except between the hours of 10:00 and 1600 Mondays to Fridays and not at all on Saturdays, Sundays or Bank/Public holiday Reason: To protect the amenity of occupiers of adjoining residential properties.
(18) Hours permitted for piling
(19) ) Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (or any Order revoking and re-enacting with or without modifications) no development permitted by Classes A & E of Part 1 of Schedule 2 of that Order, shall be carried out without the prior written consent of the Local Planning Authority. Reason: To prevent the overdevelopment of the site.
(19) No permitted development
Note to Applicant: It is considered that, subject to compliance with the conditions and any obligations attached to this permission, the proposed development is acceptable because it will not materially harm the character of the area, the amenity of neighbours or highway safety, and it is in accordance with the policies and proposals of the development plan, as listed below, and after due regard to all other relevant material considerations the local planning authority is of the opinion that permission should be granted. The following development plan policies are relevant to this decision and the conditions attached to it: Eastleigh Borough Local Plan Review 2001-2011, saved Policies. 3.CO, 8.CO, 18.CO, 177.LB, 23.NC, 26.NC, 59.BE, 91.T Under the Town and Country Planning [Fees for Applications and Deemed Applications][Amendment][England] Regulation 2008, a fee is now required for Discharge of Condition Applications. N.B. Conditions not fully discharged, invalidate the planning permission.
Note to applicant: development acceptable subject to conditions
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.