ApprovedCouncil status: Decided Permit

Installation of 4no. louvre's to north west elevation

TELEPHONE EXCHANGE, PROVIDENCE HILL, BURSLEDON

Eastleigh Borough CouncilReference F/11/68394Full planning

Last published check: 23 Nov 2026, 01:29. Check the council record for more recent changes.

We couldn’t update every section. Some information is from an earlier collection.

Status and dates

Last published check: 23 Nov 2026, 01:29 (UK)

  1. DoneReceived21 Dec 2010
  2. DoneValidated21 Dec 2010
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date15 Feb 2011
  5. DecidedPermit18 Feb 2011

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (4)
  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
Application type
Full planning
Ward
Bursledon and Old Netley
Parish
Bursledon CP
Documents
3 published

Proposal

Installation of 4no. louvre's to north west elevation

Reference
F/11/68394
Ward
Bursledon and Old Netley
Parish
Bursledon CP
Agent
Mr D Curtis - Shephard Curtis Associates

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

The document list could not be fully refreshed. View the council record for the complete list.

  • Discharge of Conditions (637565)Discharge Of Conditions3 Mar 2011View
  • Officer Report (637351)Officer Report22 Feb 2011View
  • Location Plan (635742)Location Plan17 Jan 2011View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Permit
Planning conditions
  1. (1) This planning decision is in accordance with the following plans numbered: SCA/1022/01, SCA/1022/02, SCA/1022/03. Reason: To ensure that the development is completed in accordance with the approved plans.
  2. (2) The development hereby permitted must be begun within a period of three years beginning with the date on which this permission is granted. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.

    (2) Commencement 3 years

  3. (3) Before any development is commenced a noise survey, incorporating a scheme of measures to mitigate the noise impact of the proposed development on the surrounding residential properties, must be submitted to, and approved in writing by, the Local Planning Authority and thereafter fully implemented and adhered to. Reason: To ensure the proposed development does not result in an unacceptable impact on the amenities of the occupants of surrounding residential properties in terms of noise impact.

    (3) Noise scheme - pre commencement

  4. (4) The materials to be used must match as closely as possible, in type, colour and texture, those on the existing louvres. Reason: To ensure a satisfactory visual relationship of the new development to the existing.

    (4) Materials to match existing building

  5. Note to Applicant: It is considered that, subject to compliance with the conditions and any obligations attached to this permission, the proposed development is acceptable because it will not materially harm the character of the area, the amenity of neighbours or highway safety and it is in accordance with the policies and proposals of the development plan, as listed below, and after due regard to all other relevant material considerations the local planning authority is of the opinion that permission should be granted. The following development plan policies are relevant to this decision and the conditions attached to it: Eastleigh Borough Local Plan Review 2001-2011, saved Policies 59.BE. Under the Town and Country Planning [Fees for Applications and Deemed Applications][Amendment][England] Regulation 2008, a fee is now required for Discharge of Condition Applications. N.B. Conditions not fully discharged, invalidate the planning permission.

    Note to applicant: development acceptable subject to conditions

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.