ApprovedCouncil status: Decided Permit

Erection of 2-bay extension of platform enclosure

LAKESIDE RAILWAY, LAKESIDE COUNTRY PARK, WIDE LANE, EASTLEIGH, SO50 5PE

Eastleigh Borough CouncilReference F/10/67860Full planning

Last published check: 23 Nov 2026, 12:03. Check the council record for more recent changes.

We couldn’t update every section. Some information is from an earlier collection.

Status and dates

Last published check: 23 Nov 2026, 12:03 (UK)

  1. DoneReceived10 Sept 2010
  2. DoneValidated10 Sept 2010
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date5 Nov 2010
  5. DecidedPermit27 Oct 2010

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (4)
  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Decision Date

    Published milestoneCouncil source
  4. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Full planning
Ward
Eastleigh South
Parish
Eastleigh
Documents
2 published

Proposal

Erection of 2-bay extension of platform enclosure

Reference
F/10/67860
Ward
Eastleigh South
Parish
Eastleigh

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

The document list could not be fully refreshed. View the council record for the complete list.

  • Application Form (632638)Application Form16 Sept 2010View
  • Photos (632640)Photos16 Sept 2010View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Permit
Planning conditions
  1. (1) The development hereby permitted must be begun within a period of three years beginning with the date on which this permission is granted. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.

    (1) Commencement 3 years

  2. (2) The materials to be used must match as closely as possible, in type, colour and texture, those on the existing building. Reason: To ensure a satisfactory visual relationship of the new development to the existing.

    (2) Materials to match existing building

  3. Note to Applicant: It is considered that, subject to compliance with the conditions and any obligations attached to this permission, the proposed development is acceptable because it will not materially harm the character of the area, the amenity of neighbours or highway safety, and it is in accordance with the policies and proposals of the development plan, as listed below, and after due regard to all other relevant material considerations the local planning authority is of the opinion that permission should be granted. The following development plan policies are relevant to this decision and the conditions attached to it: Eastleigh Borough Local Plan Review 2001-2011, saved Policies 59.BE, 1.CO, 2.CO 160.TA.

    Note to applicant: development acceptable subject to conditions

  4. Note to applicant: The application site lies on a former landfill site. The presence of 'made ground', gas vapours and / or contaminants in the ground cannot be ruled out and therefore we would recommend that the risks to the development be considered; including the construction design. The applicant should also be advised to contact Environmental Health to discuss the above. In addition, we would recommend that this is brought to the attention of the Building Control officer. Should any information come to light during the demolition or construction works that indicates the presence, or the possible presence of, ‘made ground’, odours / vapours or of contaminated soils, then this should be brought to the attention of the Environmental Health Service. Any excavated material is to be disposed in the appropriate manner and not to be reused on site, unless proven to be 'free' from chemical contamination.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.