ApprovedCouncil status: Decided Permit

Single storey front, two storey side & two storey rear extension with balconies, following demolition of existing extension & garage & felling of trees

FORMER HAMBLE CLIFF LODGE, WESTFIELD COMMON, HAMBLE-LE-RICE, SOUTHAMPTON, SO31 4HY

Eastleigh Borough CouncilReference F/10/67574Full planning

Last published check: 23 Nov 2026, 23:31. Check the council record for more recent changes.

We couldn’t update every section. Some information is from an earlier collection.

Open council website

Status and dates

Last published check: 23 Nov 2026, 23:31 (UK)

  1. DoneReceived13 Jul 2010
  2. DoneValidated15 Jul 2010
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date9 Sept 2010
  5. DecidedPermit14 Oct 2010

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (4)
  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
Application type
Full planning
Ward
Hamble-le-Rice and Butlocks Heath
Parish
Hamble-le-Rice CP
Documents
3 published

Proposal

Single storey front, two storey side & two storey rear extension with balconies, following demolition of existing extension & garage & felling of trees

Reference
F/10/67574
Ward
Hamble-le-Rice and Butlocks Heath
Parish
Hamble-le-Rice CP
Agent
Miss L Brown - Guion & Brown Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

The document list could not be fully refreshed. View the council record for the complete list.

  • Site Layout Plan (630067)Site Layout Plan29 Jul 2010View
  • Roof Plan (630066)Roof Plan29 Jul 2010View
  • Tree Info (630068)Tree Info29 Jul 2010View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Permit
Planning conditions
  1. (1) The development hereby permitted must be begun within a period of three years beginning with the date on which this permission is granted. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.

    (1) Commencement 3 years

  2. (2) The materials to be used must match as closely as possible, in type, colour and texture, including the patterned clay roof tiling and stonework detailing those on the existing building. Reason: To ensure a satisfactory visual relationship of the new development to the existing.

    (2) Materials to match existing building

  3. (3) All measures for tree protection recommended as part of the Tree Liability Impact and Method Statement Tree Protection Plan dated 14th June 2010 shall be fully complied with and must include a pre-commencement meeting between the client, EBC Tree Officer and site manager. Reason: To ensure the natural features on and adjacent to the site are protected from damage throughout the construction period.
  4. Note to Applicant: It is considered that, subject to compliance with the conditions and any obligations attached to this permission, the proposed development is acceptable because it will not materially harm the character of the area, the amenity of neighbours or highway safety, and it is in accordance with the policies and proposals of the development plan, as listed below, and after due regard to all other relevant material considerations the local planning authority is of the opinion that permission should be granted. The following development plan policies are relevant to this decision and the conditions attached to it: Eastleigh Borough Local Plan Review 2001-2011, saved Policies. 59.BE, 9.CO

    Note to applicant: development acceptable subject to conditions

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.