Council planning record

Discharge of Conditions 3 (Arboricultural), 4 (Construction Method Statement) 5 (Site Investigation Report) 7 (Surface Water Drainage) of planning permission F/22/94434 for the construction of a two-storey building to accommodate the College's Art and Design school.

BARTON PEVERIL COLLEGE, CHESTNUT AVENUE, EASTLEIGH, SO50 5ZA

Decided DischargedReference: DC/23/95489Eastleigh Borough Council

Last published check: 4 Oct 2026, 01:43. Check the council record for more recent changes.

Application location

BARTON PEVERIL COLLEGE, CHESTNUT AVENUE, EASTLEIGH, SO50 5ZA

This record has no verified map location.

Application summary

Status
Decided Discharged
Application type
Approval of conditions
Received
23 Jun 2023
Validated
23 Jun 2023
Determination deadline
18 Aug 2023
Local authority
Eastleigh Borough Council

Application overview

Discharge of Conditions 3 (Arboricultural), 4 (Construction Method Statement) 5 (Site Investigation Report) 7 (Surface Water Drainage) of planning permission F/22/94434 for the construction of a two-storey building to accommodate the College's Art and Design school.

Proposal details

Reference
DC/23/95489
Alternative references
12190534
Ward
Eastleigh South Ward
Parish
Eastleigh Town CP
Agent
Stride Treglown Ltd (Peter Badger)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 15 of 15

DocumentPublishedAction
GWPR5268 Phase 2 Site Investigation Report - Main Document_RedactedSupporting Documents · PDF29 Jun 2023View
155652-STT-XX-XX-CO-T-1020-0002_Cover Letter for DOC 3 4 5 7 (2)_RedactedSubsistence Fee - Public · PDF29 Jun 2023View
GWPR5268 Phase 1 Desk Study - Main Document (1)_RedactedSupporting Documents · PDF29 Jun 2023View
GWPR5268 Phase 2 Site Investigation Report - Appendices E-I_RedactedSupporting Documents · PDF29 Jun 2023View
304011-SWH-ZZ-XX-DR-C-0502 T03 Drainage Strategy LayoutPlan · PDF29 Jun 2023View
304011 Drainage Statement 20230531.pdfSupporting Documents · PDF23 Jun 2023View
GWPR5268 Phase 1 Desk Study - Appendix B.pdfSupporting Documents · PDF23 Jun 2023View
GWPR5268 Phase 2 Site Investigation Report - Appendices A-D.pdfSupporting Documents · PDF23 Jun 2023View
Tree Protection Scheme (Arb Method Statement).pdfSupporting Documents · PDF23 Jun 2023View
Application Form RedactedAttachment Summary · PDF23 Jun 2023View
Tree Protection PlanPlan · PDF23 Jun 2023View
GWPR5268 Phase 1 Desk Study - Appendix A.pdfSupporting Documents · PDF23 Jun 2023View
GWPR5268 Phase 1 Desk Study - Appendix E Part 2.pdfSupporting Documents · PDF23 Jun 2023View
GWPR5268 Phase 1 Desk Study - Appendix E Part 1.pdfSupporting Documents · PDF23 Jun 2023View
GWPR5268 Phase 1 Desk Study - Appendix D.pdfSupporting Documents · PDF23 Jun 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Date

    Published milestoneCouncil source

Decision & conditions

Discharged
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.