ApprovedCouncil status: Decided Permit

Construction of a three bed detached dwelling to plot 3 with access, garage, amenity space and landscaping

HALYARDS, 2 BEACH LANE, NETLEY ABBEY, SOUTHAMPTON, SO31 5DF

Eastleigh Borough CouncilReference C/16/78271Conservation area

Last published check: 12 Nov 2026, 02:57. Check the council record for more recent changes.

We couldn’t update every section. Some information is from an earlier collection.

Status and dates

Last published check: 12 Nov 2026, 02:57 (UK)

  1. DoneReceived24 Mar 2016
  2. DoneValidated3 May 2016
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date28 Jun 2016
  5. DecidedPermit28 Jun 2016

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (4)
  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Decision Date

    Published milestoneCouncil source
  4. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Conservation area
Ward
Netley Abbey
Parish
Hound CP
Documents
25 published

Proposal

Construction of a three bed detached dwelling to plot 3 with access, garage, amenity space and landscaping

Reference
C/16/78271
Ward
Netley Abbey
Parish
Hound CP
Agent
Mr T Holt

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

The document list could not be fully refreshed. View the council record for the complete list.

  • Officer Report (1762037)Officer Report28 Jun 2016View
  • Decision Notice (1762034)Decision Notice28 Jun 2016View
  • Consultees Response (1760929)Consultees Response27 Jun 2016View
  • Floor Plan (1760390)Floor Plan23 Jun 2016View
  • Site Layout Plan (1760392)Site Layout Plan23 Jun 2016View
  • Parish Response (1756233)Parish Response15 Jun 2016View
  • Consultees Response (1749555)Consultees Response6 Jun 2016View
  • Consultees Response (1744441)Consultees Response26 May 2016View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Permit
Decision Notice (1762034)
Planning conditions
  1. (1) The development hereby permitted shall be implemented in accordance with the following plans numbered: 001, 002A, 003A, 004, 005, 006 & 007. Reason: For the avoidance of doubt and in the interests of proper planning.

    (1) Development in accordance with approved plans

  2. (2) The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.

    (2) Start - 3 years

  3. (3) No development shall start until the following details have been submitted to and approved in writing by the Local Planning Authority: a) details and samples of the materials to be used in the construction of the external surfaces of the building; b) details of windows and rainwater goods; and c) plans including cross sections to show proposed ground levels and their relationship to existing levels both within the site and on immediately adjoining land. The development shall be carried out in accordance with the approved details. Reason: To limit the impact the development has on the locality and adjoing properties.

    (3) Details - pre start

  4. (4) Prior to commencement, details of how the approved dwellings will achieve Code level 4 equivalent requirements for energy and water [or equivalent requirements that are set out in national legislation or policy], with reference to design stage SAP data and the BRE water calculator, as well as evidence that the relevant ESD requirements 2-8 inclusive of the Council’s adopted Environmentally Sustainable Development SPD are being met shall be submitted to, and approved in writing by, the Local Planning Authority. No dwelling shall be occupied until written confirmation thatthese works have been completed, and the ‘as built’ stage SAP data and a confirmation of the water calculation, has been submitted for that dwelling. Reason: To ensure the development meets the requirements of the national technical standards for energy and water consumption and the Council’s adopted Environmentally Sustainable Development SPD in residential development.

    (4) Energy and water requirements for new dwellings

  5. (5) No development shall start until details for the sustainable disposal of surface water and disposal of foul sewerage from the development hereby permitted have been submitted to and approved in writing by the Local Planning Authority in conjunction with Southern Water. The development shall then accord with the approved details. Reason: To ensure satisfactory provision of foul and surface water drainage.

    (5) Details - Sustainable disposal of surface and foul water - pre start

  6. (6) No development shall start until details for the treatment of site boundaries have been submitted to and approved in writing by the Planning Authority. The development shall not be brought into use until the boundary treatment has been provided in accordance with the approved details and retained thereafter. Reason: In the interests of visual and residential amenity.

    (6) Details - boundary treatment

  7. (7) No development shall start until details of all external lighting have been submitted to, and approved in writing by, the Local Planning Authority. All external lighting must accord with these approved details. Reason: In the interest of neighbour's amenity.
  8. (8) No development shall start until a landscaping scheme has been submitted to and approved in writing by the Local Planning Authority. The scheme shall cover all hard & soft landscaping, including trees, as well as details for the area of retained habitat. It shall provide details of timings for all landscaping and any future maintenance. A native seeding/planting mix should be used in any landscaping of the site to minimise the risk of invasive non-native plants entering the catchment of this location. The works shall be carried out in accordance with the approved plans and to the appropriate British Standard. Reason: In the interests of visual and residential amenity and biodiversity

    (8) Landscaping scheme - pre start

  9. (9) No construction or demolition work shall start until a Method Statement has been submitted to, and approved in writing by, the Local Planning Authority. Demolition and construction work shall only take place in accordance with the approved method statement which shall include: a) a programme and phasing of construction work b) location of temporary site buildings, compounds, construction material and plant storage areas used during demolition and construction; c) the arrangements for the routing/ turning of lorries and details for construction traffic access to the site; d) the parking of vehicles of site operatives and visitors; e) measures to control the emission of dust and dirt generated by demolition and construction; f) a scheme for controlling noise and vibration from demolition and construction activities (to include piling if relevant); g) provision for storage, collection, and disposal of rubbish from the development during construction period; and h) measures to prevent mud and dust on the highway during construction Reason: In the interests of amenity & biodiversity

    (9) No construction/demolition until Method Statement approved

  10. (10) No development shall start until a scheme of work detailing the extent and type of piling proposed, or written confirmation that no piling is required, has been submitted to and approved in writing by the Local Planning Authority. The development shall accord with the approved details. Reason: To protect the amenities of the occupiers of nearby properties.

    (10) Piling scheme of works - pre start

  11. (11) The development must accord with the Arboricultural Survey incorporating Tree Survey, Tree Protection Methods and Method Statement prepared by TP Marsh, Arboricultural Consultant. Tree Protection must be addressed as per the Tree Protection Plan enclosed within the report. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality.
  12. (12) No development shall commence until a site meeting has taken place with the site manager, the retained consulting arboriculturalist and a representative from the Local Planning Authority. Work cannot commence until the LPA officer has inspected and approved the proposed tree protection. Once approved no access by vehicles or placement of goods, chemicals, fuels, soil or other materials shall take place within the fenced area. The fencing shall be retained in its approved form for the duration of the work. All other aspects of the Arboricultural Implications Assessment and Method Statement will be addressed at this meeting. This tree condition may only be fully discharged on completion of the development subject to satisfactory written evidence of monitoring and compliance by the pre-appointed tree specialist during construction. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality.
  13. (13) No vegetation clearance shall occur on site during the bird nesting season, between 1st March & 31st August, unless supervised by an appropriately qualified ecologist. Reason: To prevent harm to breeding birds.

    (13) No clearance of vegetation during period stated

  14. (14) No percussive piling or works with heavy machinery (ie: plant resulting in a noise level in excess of 69dbAmax - measured at the sensitive receptor) to be undertaken during the bird overwintering period, October to March inclusive, unless the existing noise level measured from the sensitive receptor already exceeds 69dbAmax; in which case, no such works shall be undertaken during the specified period if the resulting noise level would exceed the existing noise level measured from the sensitive receptor. (Note: the sensitive receptor is the nearest point of the SPA or any SPA supporting habitat, eg: high tide roosting point). Reason: To protect the ecological interests of the designated sites
  15. (15) No construction, demolition or deliveries to the site shall take place during the construction period except between the hours of 0800 to 1800 Mondays to Fridays or 0900 to 1300 on Saturdays and not at all on Sundays or Bank Holidays. Reason: To protect the amenities of the occupiers of nearby dwellings.

    (15) Construction hours

  16. (16) No burning of materials obtained by site clearance or any other source shall take place during the demolition, construction and fitting out process. Reason: To protect the amenities of the occupiers of nearby properties.

    (16) No burning

  17. (17) In the event that contamination is found at any time when carrying out the approved development, that was not previously identified, it must be reported in writing immediately to the Local Planning Authority. The following steps are then required to be undertaken in accordance with current best practice and shall be submitted to and approved in writing by the Local Planning Authority; i. An appropriate investigation and risk assessment, and where necessary; ii. A remediation scheme, and iii. A verification report validating the measures in (ii) on the completion of the works. Reason: To protect future occupiers of the development.
  18. (18) The development hereby permitted shall not be occupied until the parking area [including the garage] has been provided in accordance with the approved plans and thereafter permanently retained and used only for the purpose of accommodating private motor vehicles incidental to the enjoyment of the dwelling house as a residence. Reason: To make provision for off street parking for the purpose of highway safety.

    (18) Provision of parking prior to occupation

  19. (19) No new building or tree planting shall be located over or within 3m of any public sewer or the water course wihtin the site. Reason: To protect the existing drainage system and to allow future maintainance.

    No trees/buildings within 3m of public sewer

  20. (20) Notwithstanding the provisions of the Town and Country Planning [General Permitted Development] [England] Order 2015 [or any order revoking and re-enacting that Order with or without modification], no development permitted by Classes A, E, F, G & H of Part 1 and Classes A & B of Part 14 of Schedule 2 of the order shall be carried out without the prior written consent of The Local Planning Authority. Reason: To protect the amenities of the locality and to maintain a good quality environment.

    (20) Dwelling - no permitted development

  21. Note to Applicant: In accordance with paragraphs 186 and 187 of the National Planning Policy Framework, Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
  22. Note To Applicant: The maintainance of a water course or ditch remains the responsibility of the landowner. A riparian land owner has duties to land owners both up and down stream and cannot undertake action that is likely to cause flooding. There, it is the responsibility of each ripiarian landowner to ensure that the drainage ditch/culvert remains clear from debris in order to facilitate the clear passage of water for which the channel was designed.
  23. Note to Applicant: The presence of made ground and / or contaminants in the ground cannot be ruled out and therefore we would recommend that the risks to the development be considered; including the design of the floor construction and the number / location of service penetrations. British standard BS 10175:2001 Investigation of potentially contaminated site - Code of Practice is a useful source of advice on site investigation. Further information and advice about developing contaminated land can be found on the Council’s website or by contacting the Council’s Environmental Health Team. You should also bring this matter to the attention of the Building Control Officer.
  24. Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council’s website www.eastleigh.gov.uk by following the links to Planning, Guidance on the process, scroll down to Guidance on Aspects of the Planning & Construction Process and select considerate builders advice note.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.