ApprovedCouncil status: Decided Permit

Erection of side porch

2 BROWNHILL, SALTERNS LANE, BURSLEDON, SOUTHAMPTON, SO31 8DH

Eastleigh Borough CouncilReference C/12/71687Conservation area

Last published check: 18 Nov 2026, 11:57. Check the council record for more recent changes.

We couldn’t update every section. Some information is from an earlier collection.

Status and dates

Last published check: 18 Nov 2026, 11:57 (UK)

  1. DoneReceived1 Nov 2012
  2. DoneValidated5 Nov 2012
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date31 Dec 2012
  5. DecidedPermit21 Dec 2012

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (4)
  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Decision Date

    Published milestoneCouncil source
  4. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Conservation area
Ward
Bursledon and Old Netley
Parish
Bursledon CP
Documents
7 published

Proposal

Erection of side porch

Reference
C/12/71687
Ward
Bursledon and Old Netley
Parish
Bursledon CP
Agent
Mr Malcolm Stevens - Metroscape Design Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

The document list could not be fully refreshed. View the council record for the complete list.

  • Officer Report (1050748)Officer Report21 Dec 2012View
  • Decision Notice (1050749)Decision Notice21 Dec 2012View
  • Application Form (1020775)Application Form1 Nov 2012View
  • Design and Access Statement (1020646)Design And Access Statement1 Nov 2012View
  • Elevations and Floor Plan (1020648)Elevations And Floor Plan1 Nov 2012View
  • Elevations and Floor Plan (1020649)Elevations And Floor Plan1 Nov 2012View
  • Plans (1020783)Plans1 Nov 2012View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Permit
Decision Notice (1050749)
Planning conditions
  1. (1) The development hereby permitted shall be carried out in accordance with the following approved plans: PO1, PO2, PO3. Reason: For the avoidance of doubt and in the interests of proper planning.
  2. (2) The development hereby permitted must be begun within a period of three years beginning with the date on which this permission is granted. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.

    (2) Commencement 3 years

  3. (3) The materials to be used must match as closely as possible, in type, colour and texture, those on the existing building. Reason: To ensure a satisfactory visual relationship of the new development to the existing.

    (3) Materials to match existing building

  4. Note to Applicant: It is considered that, subject to compliance with the conditions and any obligations attached to this permission, the proposed development is acceptable because it will not materially harm the character of the area, the amenity of neighbours or highway safety and it is in accordance with the policies and proposals of the development plan, as listed below, and after due regard to all other relevant material considerations the local planning authority is of the opinion that permission should be granted. The following development plan policies are relevant to this decision and the conditions attached to it: Eastleigh Borough Local Plan Review 2001-2011 - Saved Policies 1.CO, 9.CO, 59.BE, 169.LB, 179.LB. Pre-Submission Eastleigh Borough Local Plan 2011-2029 - DM1, BU6, DM10, DM26. In accordance with paragraphs 186 and 187 of the National Planning Policy Framework, Eastleigh Borough Council take a positive and proactive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.

    Note to applicant: development acceptable subject to conditions

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.