Council planning record

Non-Material Amendment of Reserved Matters application P/2024/01198 (being details of appearance, layout, scale and landscaping) pursuant to outline planning permission ref: P/2021/00868 in relation to Phase One to include the erection of 299 no. residential dwellings (Use Class C3), 81 no. bedroom care home building for the elderly (Use Class C2) and associated public open space and associated infrastructure works being; handing of plot 84, minor external alterations to apartment block and house types and amendment to proposed materials of bin and cycle store

LAND AT TUTBURY ROAD BURTON UPON TRENT

LiveReference: P/2026/01015East Staffordshire Borough Council

Application location

LAND AT TUTBURY ROAD BURTON UPON TRENT

Location point supplied by the council.

Application summary

Status
Live
Application type
Non-Material Amendment
Received
7 Sept 2026
Validated
7 Sept 2026
Determination deadline
Not published
Local authority
East Staffordshire Borough Council

Application overview

Non-Material Amendment of Reserved Matters application P/2024/01198 (being details of appearance, layout, scale and landscaping) pursuant to outline planning permission ref: P/2021/00868 in relation to Phase One to include the erection of 299 no. residential dwellings (Use Class C3), 81 no. bedroom care home building for the elderly (Use Class C2) and associated public open space and associated infrastructure works being; handing of plot 84, minor external alterations to apartment block and house types and amendment to proposed materials of bin and cycle store

Proposal details

Reference
P/2026/01015
Alternative references
PP/2026/00946
Ward
Stretton
Parish
Outwoods CP
Agent
Michael Burrow

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 76 of 76

DocumentPublishedAction
bar-trb_hta-l_dr_905_general arrangement 02 south_j REC 07.09.2026.pdfbar-trb_hta-l_dr_905_general arrangement 02 south_j REC 07.09.20262 Oct 2026View
bar-trb_hta-l_dr_910_pos calculation_f REC 07.09.2026.pdfbar-trb_hta-l_dr_910_pos calculation_f REC 07.09.20262 Oct 2026View
bar-trb_hta-l_dr_920_tree planting plan 01 north_i REC 07.09.2026.pdfbar-trb_hta-l_dr_920_tree planting plan 01 north_i REC 07.09.20262 Oct 2026View
bar-trb_hta-l_dr_921_tree planting plan 02 south_j REC 07.09.2026.pdfbar-trb_hta-l_dr_921_tree planting plan 02 south_j REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-0192_proposed street views cross sections-3-rev-05 REC 07.09.2026.pdfbar-trb_hta-a_dr-0192_proposed street views cross sections-3-rev-05 REC 07.09.20262 Oct 2026View
bar-trb_hta-l_dr_901-a_tree removal plan north_8 REC 07.09.2026.pdfbar-trb_hta-l_dr_901-a_tree removal plan north_8 REC 07.09.2026.2 Oct 2026View
bar-trb_hta-l_dr_902-b_tree removal plan south_9 REC 07.09.2026.pdfbar-trb_hta-l_dr_902-b_tree removal plan south_9 REC 07.09.2026.2 Oct 2026View
bar-trb_hta-l_dr_904_general arrangement 01 north_i REC 07.09.2026.pdfbar-trb_hta-l_dr_904_general arrangement 01 north_i REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-0161_entrance feature-06 REC 07.09.2026.pdfbar-trb_hta-a_dr-0161_entrance feature-06 REC 07.09.2026.2 Oct 2026View
bar-trb_hta-a_dr-0170_roof and walls material plan-12 REC 07.09.2026.pdfbar-trb_hta-a_dr-0170_roof and walls material plan-12 REC 07.09.2022 Oct 2026View
bar-trb_hta-a_dr-0180_pos adoption_manco plan-10 REC 07.09.2026.pdfbar-trb_hta-a_dr-0180_pos adoption_manco plan-10 REC 07.09.2026.2 Oct 2026View
bar-trb_hta-a_dr-0190_proposed street views cross sections-1-rev-05 REC 07.09.2026.pdfbar-trb_hta-a_dr-0190_proposed street views cross sections-1-rev-05 REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-0191_proposed street views cross sections-2-rev-05 REC 07.09.2026.pdfbar-trb_hta-a_dr-0191_proposed street views cross sections-2-rev-05 REC 07.09.2026.2 Oct 2026View
bar-trb_hta-a_dr-0141_refuse strategy plan-east-09 REC 07.09.2026.pdfbar-trb_hta-a_dr-0141_refuse strategy plan-east-09 REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-0134_garden sizes plan-07 REC 07.09.2026.pdfbar-trb_hta-a_dr-0134_garden sizes plan-07 REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-0140_refuse strategy plan-west-09 REC 07.09.2026.pdfbar-trb_hta-a_dr-0140_refuse strategy plan-west-09 REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-0121_unit sizes plan-06 REC 07.09.2026.pdfbar-trb_hta-a_dr-0121_unit sizes plan-06 REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-0131_car & cycle parking plan-west-09 REC 07.09.2026.pdfbar-trb_hta-a_dr-0131_car & cycle parking plan-west-09 REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-0132_car & cycle parking plan-east-09 REC 07.09.2026.pdfbar-trb_hta-a_dr-0132_car & cycle parking plan-east-09 REC 07.09.2026.2 Oct 2026View
bar-trb_hta-a_dr-0133_separation distances plan-07 REC 07.09.2026.pdfbar-trb_hta-a_dr-0133_separation distances plan-07 REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-0106_site layout-east-09 REC 07.09.2026.pdfbar-trb_hta-a_dr-0106_site layout-east-09 REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-0110_proposed illustrative site plan-08 REC 07.09.2026.pdfbar-trb_hta-a_dr-0110_proposed illustrative site plan-08 REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-0120_tenure plan-09 REC 07.09.2026.pdfbar-trb_hta-a_dr-0120_tenure plan-09 REC 07.09.2026.2 Oct 2026View
bar-trb_hta-a_dr_garages_mercia edit-_0169_1-100_a3_refuse store_rev-02 REC 07.09.2026.pdfbar-trb_hta-a_dr_garages_mercia edit-_0169_1-100_a3_refuse store_rev-02 REC 07.09.2026.2 Oct 2026View
bar-trb_hta-a_dr-0100_site layout-14 REC 07.09.2026.pdfbar-trb_hta-a_dr-0100_site layout-14 REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-0105_site layout-west-09 REC 07.09.2026.pdfbar-trb_hta-a_dr-0105_site layout-west-09 REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-_0445_1-100_a2_raven semi_rev-02 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0445_1-100_a2_raven semi_rev-02 REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-_0450_1-100_a3_redshank detached_rev-02 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0450_1-100_a3_redshank detached_rev-02 REC 07.09.2026.2 Oct 2026View
bar-trb_hta-a_dr-_0451_1-100_a3_redshank detached handed_rev-02 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0451_1-100_a3_redshank detached handed_rev-02 REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr_garages_mercia edit-_0168_1-100_a3_cycle store_rev-02 REC 07.09.2026.pdfbar-trb_hta-a_dr_garages_mercia edit-_0168_1-100_a3_cycle store_rev-02 REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-_0419_1-100_a2_sh52_sh50_sh55_terrace_rev-05 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0419_1-100_a2_sh52_sh50_sh55_terrace_rev-05 REC 07.09.2026.2 Oct 2026View
bar-trb_hta-a_dr-_0421_1-100_a2_type 50_terrace of 3 eaves fronted_dwh_rev-01 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0421_1-100_a2_type 50_terrace of 3 eaves fronted_dwh_rev-01 REC 07.09.2026.2 Oct 2026View
bar-trb_hta-a_dr-_0425_1-100_a3_type 52_semi eaves fronted_rev-02 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0425_1-100_a3_type 52_semi eaves fronted_rev-02 REC 07.09.2026.2 Oct 2026View
bar-trb_hta-a_dr-_0426_1-100_a3_sh52_semi eaves fronted_dwh_rev-03 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0426_1-100_a3_sh52_semi eaves fronted_dwh_rev-03 REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-_0429_1-100_a2_sh52_3 terrace_dwh_rev-03 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0429_1-100_a2_sh52_3 terrace_dwh_rev-03 REC 07.09.2026.2 Oct 2026View
bar-trb_hta-a_dr-_0405_1-100_a3_henley_detached_rev-04 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0405_1-100_a3_henley_detached_rev-04 REC 07.09.2026.2 Oct 2026View
bar-trb_hta-a_dr-_0406_1-100_a3_henley_detached_park_rev-03 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0406_1-100_a3_henley_detached_park_rev-03 REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-_0407_1-100_a3_henley_detached-handed_rev-02 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0407_1-100_a3_henley_detached-handed_rev-02 REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-_0415_1-100_a3_type 50_semi eaves fronted_rev-02 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0415_1-100_a3_type 50_semi eaves fronted_rev-02 REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-_0416_1-100_a3_sh50_semi eaves fronted_dwh_rev-03 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0416_1-100_a3_sh50_semi eaves fronted_dwh_rev-03 REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-_0417_1-100_a2_type 50_terrace of 3 eaves fronted_rev-04 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0417_1-100_a2_type 50_terrace of 3 eaves fronted_rev-04 REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-_0390_1-100_a3_avondale_detached_render_rev-04 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0390_1-100_a3_avondale_detached_render_rev-04 REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-_0391_1-100_a3_avondale_detached_park_rev-04 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0391_1-100_a3_avondale_detached_park_rev-04 REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-_0392_1-100_a3_avondale_detached_render-handed_rev-02 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0392_1-100_a3_avondale_detached_render-handed_rev-02 REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-_0393_1-100_a3_avondale_detached_park-handed_rev-02 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0393_1-100_a3_avondale_detached_park-handed_rev-02 REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-_0395_1-100_a3_holden_detached_rev-05 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0395_1-100_a3_holden_detached_rev-05 REC 07.09.2026.2 Oct 2026View
bar-trb_hta-a_dr-_0396_1-100_a3_holden_detached_park_rev-05 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0396_1-100_a3_holden_detached_park_rev-05 REC 07.09.2026.2 Oct 2026View
bar-trb_hta-a_dr-_0397_1-100_a3_holden_detached-handed_rev-02 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0397_1-100_a3_holden_detached-handed_rev-02 REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-_0398_1-100_a3_holden_detached_park-handed_rev-04 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0398_1-100_a3_holden_detached_park-handed_rev-04 REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-_0370_1-100_a2_greenwood_semi_rev-03 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0370_1-100_a2_greenwood_semi_rev-03 REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-_0371_1-100_a2_greenwood_semi_gateway_rev-06 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0371_1-100_a2_greenwood_semi_gateway_rev-06 REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-_0375_1-100_a2_kennett_semi_rev-03 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0375_1-100_a2_kennett_semi_rev-03 REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-_0376_1-100_a2_kennett_semi_gateway_rev-03 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0376_1-100_a2_kennett_semi_gateway_rev-03 REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-_0380_1-100_a3_hertford_detached_rev-05 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0380_1-100_a3_hertford_detached_rev-05 REC 07.09.2026.2 Oct 2026View
bar-trb_hta-a_dr-_0381_1-100_a3_hertford_detached_gateway_rev-04 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0381_1-100_a3_hertford_detached_gateway_rev-04 REC 07.09.2026.2 Oct 2026View
bar-trb_hta-a_dr-_0382_1-100_a3_hertford_detached-handed_rev-02 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0382_1-100_a3_hertford_detached-handed_rev-02 REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-_0383_1-100_a3_hertford_detached_gateway-handed_rev-02 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0383_1-100_a3_hertford_detached_gateway-handed_rev-02 REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-_0385_1-100_a3_cornell_detached_park_rev-05 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0385_1-100_a3_cornell_detached_park_rev-05 REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-_0386_1-100_a3_cornell_detached_park-handed_rev-02 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0386_1-100_a3_cornell_detached_park-handed_rev-02 REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-_0367_1-100_a2_cannington-parkin_terrace_rev-02 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0367_1-100_a2_cannington-parkin_terrace_rev-02 REC 07.09.2026.2 Oct 2026View
ApplicationFormRedacted.pdfApplicationFormRedacted2 Oct 2026View
bar-trb_hta-a_dr-_0200_1-100_a1_apartment block 1 bed-plans-03 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0200_1-100_a1_apartment block 1 bed-plans-03 REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-_0201_1-100_a1_apartment block 1 bed-elevations-04 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0201_1-100_a1_apartment block 1 bed-elevations-04 REC 07.09.2026.2 Oct 2026View
bar-trb_hta-a_dr-_0305_1-100_a3_ellerton semi eaves fronted_rev-03 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0305_1-100_a3_ellerton semi eaves fronted_rev-03 REC 07.09.2026.2 Oct 2026View
bar-trb_hta-a_dr-_0306_1-100_a3_ellerton_moresby semi park frontage_rev-05 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0306_1-100_a3_ellerton_moresby semi park frontage_rev-05 REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-_0307_1-100_a2_ellerton terrace_rev-03 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0307_1-100_a2_ellerton terrace_rev-03 REC 07.09.2026.2 Oct 2026View
bar-trb_hta-a_dr-_0320_1-100_a3_kingsley detached_rev-06 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0320_1-100_a3_kingsley detached_rev-06 REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-_0322_1-100_a3_kingsley detached-handed_rev-04 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0322_1-100_a3_kingsley detached-handed_rev-04 REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-_0335_1-100_a2_woodcote semi_rev-03 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0335_1-100_a2_woodcote semi_rev-03 REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-_0336_1-100_a2_woodcote semi park frontage_rev-04 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0336_1-100_a2_woodcote semi park frontage_rev-04 REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-_0357_1-100_a2_archford_terrace split level_rev-03 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0357_1-100_a2_archford_terrace split level_rev-03 REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-_0365_1-100_a2_cannington_semi_rev-02 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0365_1-100_a2_cannington_semi_rev-02 REC 07.09.20262 Oct 2026View
bar-trb_hta-a_dr-_0366_1-100_a2_cannington-parkin_semi_rev-04 REC 07.09.2026.pdfbar-trb_hta-a_dr-_0366_1-100_a2_cannington-parkin_semi_rev-04 REC 07.09.2026.2 Oct 2026View
bar-trb_hta-a_dr-0150_boundary treatment plan-13 REC 07.09.2026.pdfbar-trb_hta-a_dr-0150_boundary treatment plan-13 REC 07.09.2026.2 Oct 2026View
Note - Non-Material Amendment.pdfNote - Non-Material Amendment2 Oct 2026View
burton nma 1 covering letter f REC 07.09.2026_Redacted.pdfburton nma 1 covering letter f REC 07.09.2026_Redacted2 Oct 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received

    Published milestoneCouncil source
  2. Validated

    Published milestoneCouncil source
  3. Registered

    Published milestoneCouncil source

Decision & conditions

PENDING
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.