Council planning record

Variation of Condition 4 (Approved Plans), Condition 5 (Phasing), Condition 6 (Sports Centre Occupation), Condition 7 (Campus Occupation), Condition 8 (Building Heights), Condition 9 (Business Park Floorspace), Condition 16 (On-Site Ecological Mitigation), Condition 20 (CEMP: Biodiversity), Condition 22 (Staithes Road Site Access), Condition 24 (Pedestrian and Cycle Access), Condition 25 (Pedestrian and Cycle Access Management Plan), Condition 30 (Sports Facilities Access points), Condition 33 (Traffic Generation Monitor), Condition 35 (Transport Statement), Condition 38 (Flood Storage Scheme), Condition 41 (Flood Risk Assessment), Condition 43 (Surface Water Drainage), Condition 44 (Watercourses), Condition 51 (Heritage Interpretation), Condition 63 (Air Quality), Condition 67 (Noise scheme), Condition 68 (Noise Mitigation Scheme), Condition 70 (Floodlighting), Condition 76 (Energy Centre), Condition 77 (Energy Statement), Condition 78 (Loss of Playing Field), Condition 79 (Sports Centre & Pitches Land Use Zone), Condition 80 (Ancillary Facilities), Condition 81 (Residential Accommodation), Condition 82 (Campus Land Use Zone) of planning permission 22/01591/STVARE to allow changes and updates to the approved plans including the phasing plans, geographical scope of Phase 1 and Phase 2 and permitting energy infrastructure across all Phases; increase of maximum height of buildings up to 48m (in one location) to allow for a potential specific end user; increase the development from 18,000sqm to 31,540sqm prior to relocation of sports pitches; and delivery of the 807sqm of Class E(g)(i), (ii), (e), (f) in the Education and Research Campus Zone before the same scale of floorspace is brought into use, increase the permitted scale of the Research and Development provision from 2077sqm to 3840sqm (whilst maintaining a total cap of 83,074sqm of gross built floorspace) and increase permitted scale of development to be accessed from Staithes Road from 18,000sqm to 31,540sqm

Land North West Of Kingstown Hotel Hull Road Hedon East Riding Of Yorkshire HU12 8DJ

Application ApprovedReference: 24/03360/STVAREEast Riding of Yorkshire Council

Last published check: 30 Sept 2026, 23:19. Check the council record for more recent changes.

Application location

Land North West Of Kingstown Hotel Hull Road Hedon East Riding Of Yorkshire HU12 8DJ

This record has no verified map location.

View council map

Application summary

Status
Application Approved
Application type
Strategic - Variation of Cond with EIA
Received
12 Nov 2024
Validated
13 Nov 2024
Determination deadline
Not published
Local authority
East Riding of Yorkshire Council

Application overview

Variation of Condition 4 (Approved Plans), Condition 5 (Phasing), Condition 6 (Sports Centre Occupation), Condition 7 (Campus Occupation), Condition 8 (Building Heights), Condition 9 (Business Park Floorspace), Condition 16 (On-Site Ecological Mitigation), Condition 20 (CEMP: Biodiversity), Condition 22 (Staithes Road Site Access), Condition 24 (Pedestrian and Cycle Access), Condition 25 (Pedestrian and Cycle Access Management Plan), Condition 30 (Sports Facilities Access points), Condition 33 (Traffic Generation Monitor), Condition 35 (Transport Statement), Condition 38 (Flood Storage Scheme), Condition 41 (Flood Risk Assessment), Condition 43 (Surface Water Drainage), Condition 44 (Watercourses), Condition 51 (Heritage Interpretation), Condition 63 (Air Quality), Condition 67 (Noise scheme), Condition 68 (Noise Mitigation Scheme), Condition 70 (Floodlighting), Condition 76 (Energy Centre), Condition 77 (Energy Statement), Condition 78 (Loss of Playing Field), Condition 79 (Sports Centre & Pitches Land Use Zone), Condition 80 (Ancillary Facilities), Condition 81 (Residential Accommodation), Condition 82 (Campus Land Use Zone) of planning permission 22/01591/STVARE to allow changes and updates to the approved plans including the phasing plans, geographical scope of Phase 1 and Phase 2 and permitting energy infrastructure across all Phases; increase of maximum height of buildings up to 48m (in one location) to allow for a potential specific end user; increase the development from 18,000sqm to 31,540sqm prior to relocation of sports pitches; and delivery of the 807sqm of Class E(g)(i), (ii), (e), (f) in the Education and Research Campus Zone before the same scale of floorspace is brought into use, increase the permitted scale of the Research and Development provision from 2077sqm to 3840sqm (whilst maintaining a total cap of 83,074sqm of gross built floorspace) and increase permitted scale of development to be accessed from Staithes Road from 18,000sqm to 31,540sqm

Proposal details

Reference
24/03360/STVARE
Alternative references
PP-13502515
Ward
South West Holderness
Parish
Preston Parish Council
Agent
No information

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 126 of 126

DocumentPublishedAction
NORTHERN GAS NETWORKSConsultee Comment · PDF15 Jul 2025View
eDecisioneDecision9 Jul 2025View
NATIONAL HIGHWAYSConsultee Comment · PDF9 Jul 2025View
NATIONAL HIGHWAYSConsultee Comment · PDF3 Jul 2025View
NATIONAL HIGHWAYSConsultee Comment · PDF27 Jun 2025View
NATIONAL HIGHWAYSConsultee Comment · PDF30 May 2025View
COMMITTEE REPORTCommittee Report · PDF14 Apr 2025View
NATIONAL HIGHWAYSConsultee Comment · PDF11 Apr 2025View
BIODIVERSITY OFFICERConsultee Comment9 Apr 2025View
ECOLOGICAL MITIGATION, MANAGEMENT AND MONITORING FRAMEWORK ADDENDUMSupporting Documents · PDF3 Apr 2025View
APPLICANTS COMMENTS ON LANDSCAPE CONSULTANT COMMENTSSupporting Documents · PDF2 Apr 2025View
UPDATED COMMUNITY INVOLVEMENT APPROACHSupporting Documents · PDF2 Apr 2025View
ENERGY CONSULTANTConsultee Comment · PDF26 Mar 2025View
2ND SUPPLEMENTARY TRANSPORT NOTESupporting Documents · PDF26 Mar 2025View
YORKSHIRE WATERConsultee Comment · PDF19 Mar 2025View
. HIGHWAY DEVELOPMENT MANAGEMENTConsultee Comment · PDF18 Mar 2025View
LANDSCAPE CONSULTANTConsultee Comment · PDF12 Mar 2025View
ECOLOGICAL MITIGATION ON-SITE (PHASE 0 AND PHASE 1)Plans · PDF12 Mar 2025View
PHASING PLANPlans · PDF12 Mar 2025View
NATIONAL HIGHWAYSConsultee Comment · PDF28 Feb 2025View
NATURAL ENGLANDConsultee Comment · PDF18 Feb 2025View
NORTHERN GASConsultee Comment · PDF14 Feb 2025View
DRAINAGE STRATEGY AND MAINTENANCE REPORTSupporting Documents · PDF12 Feb 2025View
DRAINAGE STRATEGY AND MAINTENANCE REPORT APPENDIX ASupporting Documents · PDF12 Feb 2025View
DRAINAGE STRATEGY AND MAINTENANCE REPORT APPENDIX B1Supporting Documents · PDF12 Feb 2025View
DRAINAGE STRATEGY AND MAINTENANCE REPORT APPENDIX B2Supporting Documents · PDF12 Feb 2025View
DRAINAGE STRATEGY AND MAINTENANCE REPORT APPENDIX B3Supporting Documents · PDF12 Feb 2025View
DRAINAGE STRATEGY AND MAINTENANCE REPORT APPENDIX B4Supporting Documents · PDF12 Feb 2025View
DRAINAGE STRATEGY AND MAINTENANCE REPORT APPENDIX B5Supporting Documents · PDF12 Feb 2025View
DRAINAGE STRATEGY AND MAINTENANCE REPORT APPENDIX B6Supporting Documents · PDF12 Feb 2025View
DRAINAGE SRTATEGY AND MAINTENANCE REPORT APPENDIX CSupporting Documents · PDF12 Feb 2025View
PHASE 1 - ILLUSTRATIVE LAYOUT A (COLD STORE)Plans · PDF12 Feb 2025View
PHASE 1 - ILLUSTRATIVE LAYOUT B (DATA CENTRE)Plans · PDF12 Feb 2025View
PHASE 1 - ILLUSTRATIVE LAYOUT C (ADVANCED MANUFACTURING)Plans · PDF12 Feb 2025View
PHASE 1 LAYOUT A (COLD STORE) - WHOLE SITE ILLUSTRATIVE MASTERPLANPlans · PDF12 Feb 2025View
PHASE 1 LAYOUT B (DATA CENTRE) - WHOLE SITE ILLUSTRATIVE MASTERPLANPlans · PDF12 Feb 2025View
PHASE 1 LAYOUT C (ADVANCED MANUFACTURING) - WHOLE SITE ILLUSTRATIVE MASTERPLANPlans · PDF12 Feb 2025View
SUPPLEMENTARY TRANSPORT NOTESupporting Documents · PDF4 Feb 2025View
INWARD INVESTMENTConsultee Comment · PDF30 Jan 2025View
RESPONSE TO NATURAL ENGLANDS COMMENTSSupporting Documents · PDF28 Jan 2025View
REPORT TO INFORM AN APPROPRIATE ASSESSMENT ADDENDUM -HIGHLIGHTING CHANGESSupporting Documents · PDF28 Jan 2025View
REPORT TO INFORM AN APPROPRIATE ASSESSMENT ADDENDUMSupporting Documents · PDF28 Jan 2025View
NOTE ON CHANGES TO NPPF AND TEST VALLEY CASESupporting Documents · PDF22 Jan 2025View
. NATURE CONSERVATION OFFICERConsultee Comment · PDF17 Jan 2025View
LLFA AND LAND DRAINAGE TEAMConsultee Comment14 Jan 2025View
NATURAL ENGLANDConsultee Comment · PDF9 Jan 2025View
MRS TRACY ROKAHRConsultee Comment · PDF30 Dec 2024View
. COUNTRYSIDE ACCESSConsultee Comment · PDF23 Dec 2024View
NATURAL ENGLANDConsultee Comment · PDF23 Dec 2024View
YORKSHIRE WATERConsultee Comment · PDF19 Dec 2024View
ENVIRONMENTAL CONTROL - BEVERLEY IDHConsultee Comment · PDF18 Dec 2024View
PRESTON PARISH COUNCILConsultee Comment · PDF18 Dec 2024View
SOUTH HOLDERNESS INTERNAL DRAINAGE BOARDConsultee Comment · PDF18 Dec 2024View
ENVIRONMENT AGENCYConsultee Comment · PDF18 Dec 2024View
ENVIRONMENT AGENCYConsultee Comment · PDF18 Dec 2024View
. BUILDING CONSERVATIONConsultee Comment · PDF17 Dec 2024View
HISTORIC ENGLANDConsultee Comment · PDF17 Dec 2024View
. PUBLIC PROTECTION - EC SPECIALIST TEAMConsultee Comment · PDF17 Dec 2024View
NATIONAL HIGHWAYSConsultee Comment · PDF16 Dec 2024View
MR IAN NAYLOR HUMBER GATEWAY OFTO LIMITED(FULL)Public Comment · PDF15 Dec 2024View
. HUMBER HISTORIC ENVIRONMENT RECORDConsultee Comment · PDF13 Dec 2024View
HULL LIVE 13.12.24Press Advert · PDF13 Dec 2024View
SPORT ENGLANDConsultee Comment · PDF12 Dec 2024View
HISTORIC ENGLANDConsultee Comment · PDF10 Dec 2024View
HUMBERSIDE FIRE AND RESCUEConsultee Comment · PDF10 Dec 2024View
. HEDON TOWN COUNCILConsultee Comment · PDF6 Dec 2024View
MR ANDREW NICHOLSON(FULL)Public Comment · PDF5 Dec 2024View
NORTHERN GASConsultee Comment · PDF5 Dec 2024View
NATIONAL GAS TRANSMISSIONConsultee Comment · PDF2 Dec 2024View
MR MARC BROWNE TC WESTERMOST ROUGH OFTO LIMITED(FULL)Public Comment · PDF2 Dec 2024View
PLANNING STATEMENT INCLUDING STATEMENT OF COMMUNITY INVOLVEMENTSupporting Documents · PDF2 Dec 2024View
PLANNING STATEMENT INCLUDING STATEMENT OF COMMUNITY INVOLVEMENT - APPENDIX 2 - PSupporting Documents · PDF2 Dec 2024View
NATIONAL GASConsultee Comment · PDF29 Nov 2024View
SABIC - HIGH PRESSURE ETHYLENE PIPELINEConsultee Comment · PDF29 Nov 2024View
ENVIRONMENTAL STATEMENT - NON-TECHNICAL SUMMARYSupporting Documents · PDF13 Nov 2024View
APPLICATION FORMApplication Form · PDF12 Nov 2024View
SUPERSEDED PLANNING STATEMENT INCLUDING STATEMENT OF COMMUNITY INVOLVEMENTSupporting Documents · PDF12 Nov 2024View
COVERING LETTERSupporting Documents · PDF12 Nov 2024View
ENERGY STATEMENTSupporting Documents · PDF12 Nov 2024View
FLOOD RISK ASSESSMENTSupporting Documents · PDF12 Nov 2024View
TRANSPORT ASSESSMENTSupporting Documents · PDF12 Nov 2024View
SUPERSEDED REPORT TO INFORM AN APPROPRIATE ASSESSMENT ADDENDUMSupporting Documents · PDF12 Nov 2024View
ENVIRONMENTAL STATEMENT - ADDENDUMSupporting Documents · PDF12 Nov 2024View
AVR CONTROL (SURVEY)Supporting Documents · PDF12 Nov 2024View
ES - ADDENDUM - APPENDIX 11.1 - ECOLOGICAL BASELINE REPORTSupporting Documents · PDF12 Nov 2024View
ES - ADDENDUM - APPENDIX 05.1 - EIA INFORMAL SCOPING NOTESupporting Documents · PDF12 Nov 2024View
ES - ADDENDUM - APPENDIX 06.1 - ANNUAL AVERAGE DAILY TRAFFIC (AADT) CONVERSIONSupporting Documents · PDF12 Nov 2024View
ES - ADDENDUM - APPENDIX 06.2 - TRIP GENERATIONSupporting Documents · PDF12 Nov 2024View
ES - ADDENDUM - APPENDIX 06.3 - UPDATED TRAFFIC PROJECTIONSSupporting Documents · PDF12 Nov 2024View
ES - ADDENDUM - APPENDIX 06.4 - TRANSPORT ASSESSMENTSupporting Documents · PDF12 Nov 2024View
ES - ADDENDUM - APPENDIX 07.1 - ANNUAL AVERAGE WEEKDAY TRAFFIC (AAWT) FLOWSSupporting Documents · PDF12 Nov 2024View
SUPERSEDED DRAINAGE STRATEGY AND MAINTENANCE REPORT - PART 1Supporting Documents · PDF12 Nov 2024View
SUPERSEDED DRAINAGE STRATEGY AND MAINTENANCE REPORT - PART 2Supporting Documents · PDF12 Nov 2024View
SUPERSEDED DRAINAGE STRATEGY AND MAINTENANCE REPORT - PART 3Supporting Documents · PDF12 Nov 2024View
SUPERSEDED DRAINAGE STRATEGY AND MAINTENANCE REPORT - PART 4Supporting Documents · PDF12 Nov 2024View
SUPERSEDED DRAINAGE STRATEGY AND MAINTENANCE REPORT - PART 5Supporting Documents · PDF12 Nov 2024View
SUPERSEDED DRAINAGE STRATEGY AND MAINTENANCE REPORT - PART 6Supporting Documents · PDF12 Nov 2024View
SUPERSEDED DRAINAGE STRATEGY AND MAINTENANCE REPORT - PART 7Supporting Documents · PDF12 Nov 2024View
ES - ADDENDUM - APPENDIX 09.1 - FIGURES - PART 1Supporting Documents · PDF12 Nov 2024View
ES - ADDENDUM - APPENDIX 09.1 - FIGURES - PART 2Supporting Documents · PDF12 Nov 2024View
ES - ADDENDUM - APPENDIX 09.2 - ACCURATE VISUAL REPRESENTATIONS - PART 01Supporting Documents · PDF12 Nov 2024View
ES - ADDENDUM - APPENDIX 09.2 - ACCURATE VISUAL REPRESENTATIONS - PART 02Supporting Documents · PDF12 Nov 2024View
ES - ADDENDUM - APPENDIX 09.2 - ACCURATE VISUAL REPRESENTATIONS - PART 03Supporting Documents · PDF12 Nov 2024View
ES - ADDENDUM - APPENDIX 09.2 - ACCURATE VISUAL REPRESENTATIONS - PART 04Supporting Documents · PDF12 Nov 2024View
ES - ADDENDUM - APPENDIX 09.2 - ACCURATE VISUAL REPRESENTATIONS - PART 05Supporting Documents · PDF12 Nov 2024View
ES - ADDENDUM - APPENDIX 09.2 - ACCURATE VISUAL REPRESENTATIONS - PART 06Supporting Documents · PDF12 Nov 2024View
ES - ADDENDUM - APPENDIX 09.2 - ACCURATE VISUAL REPRESENTATIONS - PART 07Supporting Documents · PDF12 Nov 2024View
ES - ADDENDUM - APPENDIX 09.2 - ACCURATE VISUAL REPRESENTATIONS - PART 08Supporting Documents · PDF12 Nov 2024View
ES - ADDENDUM - APPENDIX 09.2 - ACCURATE VISUAL REPRESENTATIONS - PART 09Supporting Documents · PDF12 Nov 2024View
ES - ADDENDUM - APPENDIX 09.2 - ACCURATE VISUAL REPRESENTATIONS - PART 10Supporting Documents · PDF12 Nov 2024View
ES - ADDENDUM - APPENDIX 09.2 - ACCURATE VISUAL REPRESENTATIONS - PART 11Supporting Documents · PDF12 Nov 2024View
ES - ADDENDUM - APPENDIX 09.3 - PHOTOVIEWPOINT SHEETS - PART 1Supporting Documents · PDF12 Nov 2024View
ES - ADDENDUM - APPENDIX 09.3 - PHOTOVIEWPOINT SHEETS - PART 2Supporting Documents · PDF12 Nov 2024View
ES - ADDENDUM - APPENDIX 09.3 - PHOTOVIEWPOINT SHEETS - PART 3Supporting Documents · PDF12 Nov 2024View
ES - ADDENDUM - APPENDIX 12.1 - FLOOD RISK ASSESSMENT - PART 1Supporting Documents · PDF12 Nov 2024View
ES - ADDENDUM - APPENDIX 12.1 - FLOOD RISK ASSESSMENT - PART 2Supporting Documents · PDF12 Nov 2024View
LAND USE PARAMETER PLANPlans · PDF12 Nov 2024View
BUILDING HEIGHTS PARAMETER PLANPlans · PDF12 Nov 2024View
SUPERSEDED ILLUSTRATIVE PHASING DIAGRAMPlans · PDF12 Nov 2024View
PHASE 1 AND OPA BOUNDARIESPlans · PDF12 Nov 2024View
SUPERSEDED PHASE 1 LAYOUT C (ADVANCED MANUFACTURING) - WHOLE SITE ILLUSTRATIVE MPlans · PDF12 Nov 2024View
SUPERSEDED PHASE 1 - LAYOUT B (DATA CENTRE) - WHOLE SITE ILLUSTRATIVE MASTERPLANPlans · PDF12 Nov 2024View
SUPERSEDED PHASE 1 - ILLUSTRATIVE LAYOUT A (COLD STORE)Plans · PDF12 Nov 2024View
SUPERSEDED PHASE 1 - ILLUSTRATIVE LAYOUT C (ADVANCED MANUFACTURING)Plans · PDF12 Nov 2024View
SUPERSEDED PHASE 1 - ILLUSTRATIVE LAYOUT B (DATA CENTRE)Plans · PDF12 Nov 2024View
SUPERSEDED PHASE 1 - LAYOUT A (COLD STORE) - WHOLE SITE ILLUSTARTIVE MASTERPLANPlans · PDF12 Nov 2024View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Environmental Impact Assessment Received

    Published milestoneCouncil source
  3. Application Validated Date

    Published milestoneCouncil source
  4. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision Issued Date

    Published milestoneCouncil source
  7. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  8. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approve

Appeal status: No information · No information

eDecision

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.