ApprovedCouncil status: Application Approved

Repair and maintenance works including stripping and re-roofing of nave and introduction of structural ties and supports; repairs to the copper roof to the tower; the partial taking down and re-building of the north and south porch including the introduction of additional supports; the introduction of ties across masonry cracks; re-pointing of lose and friable mortar; repairs to existing and re-plastering of damaged plasterwork internally; lifting and re-setting of loose floor tiles to the chancel floor

St Helens Church South Street Barmby On The Marsh East Riding Of Yorkshire DN14 7HR

East Riding of Yorkshire CouncilReference 20/03697/PLBListed Building Consent

Last published check: 24 Nov 2026, 08:41. Check the council record for more recent changes.

Status and dates

Last published check: 24 Nov 2026, 08:41 (UK)

  1. DoneReceived9 Nov 2020
  2. DoneValidated25 Nov 2020
  3. ClosedConsultationEnded 17 Dec 2020
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedApprove18 Jan 2021

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (7)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Issued Date

    Published milestoneCouncil source
Application type
Listed Building Consent
Ward
Howden
Parish
Barmby Marsh Parish Council
Documents
31 published

Proposal

Repair and maintenance works including stripping and re-roofing of nave and introduction of structural ties and supports; repairs to the copper roof to the tower; the partial taking down and re-building of the north and south porch including the introduction of additional supports; the introduction of ties across masonry cracks; re-pointing of lose and friable mortar; repairs to existing and re-plastering of damaged plasterwork internally; lifting and re-setting of loose floor tiles to the chancel floor

Reference
20/03697/PLB
Alternative references
PP-09209974
Ward
Howden
Parish
Barmby Marsh Parish Council
Agent
No information

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • eDecisioneDecision18 Jan 2021View
  • OFFICER REPORTOfficer Report13 Jan 2021View
  • . NATURE CONSERVATION OFFICERConsultee Comment12 Jan 2021View
  • PRESS ADVERT - GOOLE CHRONICLE - 03.12.20Press Advert3 Dec 2020View
  • MR STEPHEN WALKERConsultee Comment2 Dec 2020View
  • STRUCTURAL DETAILSSupporting Documents1 Dec 2020View
  • SKETCH DETAILSSupporting Documents1 Dec 2020View
  • . HISTORIC ENGLANDConsultee Comment30 Nov 2020View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Approve

Appeal status: No information · No information

eDecision
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.