Notification under S211 for works to trees within a conservation area to include:T1- Oak- Reduction to achieve overall height of 30m and diameter of 15mT2- Oak- Reduction to achieve overall height of 30m and diameter of 7m one sided T3- Young Oak- Proposed removalT4- Walnut- Reduction to achieve overall height of 12m and diameter of 20m T5- Walnut- Reduction to achieve overall height of 16m and diameter of 6m T6- Ornamental Fruit- Reduction to achieve overall height of 6m and diameter of 4mT7- Ornamental Fruit- Reduction to achieve overall height of 6m and diameter of 4mT8/T9- Ornamental Fruit- Reduction to achieve overall height of 5m and diameter of 3mT10- Mature Oak- Reduction to achieve overall height of 20m and diameter of 18m
Notification under S211 for works to trees within a conservation area to include:T1- Oak- Reduction to achieve overall height of 30m and diameter of 15mT2- Oak- Reduction to achieve overall height of 30m and diameter of 7m one sided T3- Young Oak- Proposed removalT4- Walnut- Reduction to achieve overall height of 12m and diameter of 20m T5- Walnut- Reduction to achieve overall height of 16m and diameter of 6m T6- Ornamental Fruit- Reduction to achieve overall height of 6m and diameter of 4mT7- Ornamental Fruit- Reduction to achieve overall height of 6m and diameter of 4mT8/T9- Ornamental Fruit- Reduction to achieve overall height of 5m and diameter of 3mT10- Mature Oak- Reduction to achieve overall height of 20m and diameter of 18m
Reference
B/26/0327
Alternative references
PP-15163854
Parish
Bicker
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.