Council planning record

Application to determine if prior approval is required under Schedule 2, Part 16, Class A of The Town and Country Planning (General Permitted Development) (England) Order 2015 for the proposed installation of a telecommunications base station comprising a 30 metre high lattice tower with 24 no. antennas and 4 no. transmission dishes, 7 no. equipment cabinets, 1 no. electric meter cabinet and 2 no. GPS modules

Land At Port Of Boston, The Dock, Boston, PE21 6BN

DecidedReference: B/26/0267East Lindsey District Council

Last published check: 21 Sept 2026, 05:17. Check the council record for more recent changes.

Application location

Land At Port Of Boston, The Dock, Boston, PE21 6BN

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Prior Approval - Telecommunications
Received
3 Jul 2026
Validated
3 Jul 2026
Determination deadline
28 Aug 2026
Local authority
East Lindsey District Council

Application overview

Application to determine if prior approval is required under Schedule 2, Part 16, Class A of The Town and Country Planning (General Permitted Development) (England) Order 2015 for the proposed installation of a telecommunications base station comprising a 30 metre high lattice tower with 24 no. antennas and 4 no. transmission dishes, 7 no. equipment cabinets, 1 no. electric meter cabinet and 2 no. GPS modules

Proposal details

Reference
B/26/0267
Alternative references
PP-15059186
Ward
Skirbeck Ward
Parish
Boston
Agent
Perry Williams Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 24 of 24

DocumentPublishedAction
PLANNING OFFICER REPORTOfficer Notes · PDF27 Aug 2026View
002 Site Location Plan Rev BPlans · PDF3 Jul 2026View
Supplementary InformationGeneral · PDF3 Jul 2026View
Port of Boston - Boston Airfield Aerodrome Notice and PODGeneral · PDF3 Jul 2026View
Letter re Supporting digital infrastructure deployment in your local areaGeneral · PDF3 Jul 2026View
Application FormApplication form & Certificates · PDF3 Jul 2026View
250 Proposed Site Elevation Rev BPlans · PDF3 Jul 2026View
Online NationGeneral · PDF3 Jul 2026View
150 Proposed Site Plan Rev BPlans · PDF3 Jul 2026View
Covering Letter re declaration of complianceGeneral · PDF3 Jul 2026View
Preapp cons letters and POD.General · PDF3 Jul 2026View
The Times articleGeneral · PDF3 Jul 2026View
London Plan Guidance - Digital Connectivity InfrastructureGeneral · PDF3 Jul 2026View
Port of Boston Freshwave GPDO Application LetterGeneral · PDF3 Jul 2026View
5G, EMF Exposure and SafetyGeneral · PDF3 Jul 2026View
5G Masts and HealthGeneral · PDF3 Jul 2026View
Collaborating for digital connectivityGeneral · PDF3 Jul 2026View
Allaying health concerns regarding 5G and exposure to radio wavesGeneral · PDF3 Jul 2026View
5G mobile technologyGeneral · PDF3 Jul 2026View
Councils and ConnectivityGeneral · PDF3 Jul 2026View
Dev Notice MergeGeneral · PDF3 Jul 2026View
Mobile MattersGeneral · PDF3 Jul 2026View
200 Existing Site Elevation Rev BPlans · PDF3 Jul 2026View
100 Existing Site Plan Rev BPlans · PDF3 Jul 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Issued Date

    Published milestoneCouncil source
  6. Decision Made Date

    Published milestoneCouncil source
  7. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Not required
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.