Notification under S211 for works to trees within a conservation area to include:T 8 - horse chestnut - Reduce over traffic lights by 1.5m and clear street light by 1m, remove ivy around baseT 9 - lime - Remove epicormic to height of approx 4m, remove large deadwood, clear light to maintain 1m clearanceT 10 - group of 7 trees - 6 silver birch and 1 cherry - Remove birch tree, clear ivy on remaining trees, remove deadwood on birch near pedestrian gateT 20 - lime - Pollard to historic pointsT 22 - lime - Clear utility cable by 1mT 23 - lime - Remove epicormic growth to height of 4mT 24 - mixed group of 8 trees - Remove ivy, crown lift to 2.5m, clear utility cable by 1m and remove deadwood over 5cm in diameter
Boston High School For Girls, Spilsby Road, Boston PE21 9PF
Notification under S211 for works to trees within a conservation area to include:T 8 - horse chestnut - Reduce over traffic lights by 1.5m and clear street light by 1m, remove ivy around baseT 9 - lime - Remove epicormic to height of approx 4m, remove large deadwood, clear light to maintain 1m clearanceT 10 - group of 7 trees - 6 silver birch and 1 cherry - Remove birch tree, clear ivy on remaining trees, remove deadwood on birch near pedestrian gateT 20 - lime - Pollard to historic pointsT 22 - lime - Clear utility cable by 1mT 23 - lime - Remove epicormic growth to height of 4mT 24 - mixed group of 8 trees - Remove ivy, crown lift to 2.5m, clear utility cable by 1m and remove deadwood over 5cm in diameter
Reference
B/25/0147
Alternative references
PP-13926367
Ward
Trinity Ward Boston
Parish
Boston
Agent
Greenscape Tree Safe Ltd
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.