Variation of Conditions 2 (approved plans), 6 (access arrangements), 30 (electric vehicle charging points), 32 (biodiversity gain plan), 37 (bin storage), 45 (plant room compound, exercise equipment and horticultural gardens), 47 (ground floor slab level full details) pursuant to planning permission ref: 3/23/0579/FUL (Demolition of school and erection of replacement school with associated landscaping and parking. Siting of temporary teaching accommodation during period of construction), for the removal of the green roof, relocation of the sprinkler tank, relocation of the S185 pumping chamber compound, relocation of external plan from plantroom compound to the NW single storey roof of the new build and change in canopy sizes and detail
Pinewood School Hoe Lane Ware Hertfordshire SG12 9PB
Variation of Conditions 2 (approved plans), 6 (access arrangements), 30 (electric vehicle charging points), 32 (biodiversity gain plan), 37 (bin storage), 45 (plant room compound, exercise equipment and horticultural gardens), 47 (ground floor slab level full details) pursuant to planning permission ref: 3/23/0579/FUL (Demolition of school and erection of replacement school with associated landscaping and parking. Siting of temporary teaching accommodation during period of construction), for the removal of the green roof, relocation of the sprinkler tank, relocation of the S185 pumping chamber compound, relocation of external plan from plantroom compound to the NW single storey roof of the new build and change in canopy sizes and detail
Reference
3/25/1743/VAR
Alternative references
PP-14266432
Ward
Ware Priory
Parish
Ware Town Council
Agent
.
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.