The replacement of Hardmead Radial Sector Gate consists on the following activities: 1. Removal of the existing radial sector gate. 2. Temporary works will include dewatering works, to control the groundwater levels during activity number. 3. Replace the concrete-slab bed of the channel. 4. Build two new piers. 5. Place two tilting gates replacing the existing radial sector gate. 6. Place a technical fish pass in the channel. 7. Gantry system will be removed during construction and will be reinstated once construction works in the channel have been completed.
The replacement of Hardmead Radial Sector Gate consists on the following activities: 1. Removal of the existing radial sector gate. 2. Temporary works will include dewatering works, to control the groundwater levels during activity number. 3. Replace the concrete-slab bed of the channel. 4. Build two new piers. 5. Place two tilting gates replacing the existing radial sector gate. 6. Place a technical fish pass in the channel. 7. Gantry system will be removed during construction and will be reinstated once construction works in the channel have been completed.
Reference
3/21/0863/CLPO
Alternative references
PP-09667972
Ward
Ware - Christchurch
Parish
Ware Town Council
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.