T1: Oak - crown lift to achieve a clearance of 4m from ground level via removal of the lowest second and third order branches. Making target pruning cuts of up to 70mm diameter.T2: Oak - crown lift to achieve a clearance of approx 5.5m above ground level via removal of 5x lowest secondary branches. Making target pruning cuts of up to 80mm diameter.T3: Norway Maple (Crimson King) - dismantle to ground level. This tree is suppressed by the adjacent Beech and Oak (larger established canopy trees) limiting its future growth potential.T4: Beech - crown lift to achieve a clearance of 5.5m from ground level via removal of 5x lowest branches, making target pruning cuts of up to 80mm diameter.T5: Aspen - remove the 3 lowest branches on the northern aspect, making target pruning cuts of up to 75mm diameter.
T1: Oak - crown lift to achieve a clearance of 4m from ground level via removal of the lowest second and third order branches. Making target pruning cuts of up to 70mm diameter.T2: Oak - crown lift to achieve a clearance of approx 5.5m above ground level via removal of 5x lowest secondary branches. Making target pruning cuts of up to 80mm diameter.T3: Norway Maple (Crimson King) - dismantle to ground level. This tree is suppressed by the adjacent Beech and Oak (larger established canopy trees) limiting its future growth potential.T4: Beech - crown lift to achieve a clearance of 5.5m from ground level via removal of 5x lowest branches, making target pruning cuts of up to 80mm diameter.T5: Aspen - remove the 3 lowest branches on the northern aspect, making target pruning cuts of up to 75mm diameter.
Reference
26/1139/TCA
Alternative references
PP-14991751
Ward
Ottery St Mary
Parish
Ottery St Mary
Agent
ProTreeworks
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.