Council planning record

Planning application under Section 42 of the Town and Country Planning Act (Scotland) 1997 to vary conditions 1, 6, 7, 9, 10 and 11 of planning permission 20/0425/PP to allow the relocation and enlargement of the on-site substation and the extension of the operational life of the wind farm from 25 to 35 years.

Overhill Wind Farm B741 From Armour Wynd To U720 Dalricket Dalmellington East Ayrshire

RegisteredReference: 24/0427/PPEast Ayrshire

Last published check: 14 Oct 2026, 04:50. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  5. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Standard Consultation Date

    Published milestoneCouncil source
  7. Last Advertised In Press Date

    Published milestoneCouncil source
  8. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Agreed Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Registered
Application type
Planning Permission
Received
3 Sept 2024
Validated
12 Sept 2024
Determination deadline
11 Jan 2025
Local authority
East Ayrshire

Application overview

Planning application under Section 42 of the Town and Country Planning Act (Scotland) 1997 to vary conditions 1, 6, 7, 9, 10 and 11 of planning permission 20/0425/PP to allow the relocation and enlargement of the on-site substation and the extension of the operational life of the wind farm from 25 to 35 years.

Proposal details

Reference
24/0427/PP
Alternative references
100683348-001
Ward
Cumnock And New Cumnock

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Overhill Wind Farm B741 From Armour Wynd To U720 Dalricket Dalmellington East Ayrshire

This record has no verified map location.

View council map

Documents 372 of 372

DocumentPublishedAction
Committee reportReports (Public) · PDF2 Oct 2026View
Objection (georgette fulton)Public Comment · PDF15 Jul 2026View
Response (mod)Consultations (Public) · PDF26 Jun 2026View
Response (ara flooding)Consultations (Public) · PDF17 Jun 2026View
Response (glasprest airport)Consultations (Public) · PDF15 Jun 2026View
Response (environmental health)Consultations (Public)11 Jun 2026View
Response (historic environment)Consultations (Public) · PDF10 Jun 2026View
Response (scottish forestry)Consultations (Public) · PDF10 Jun 2026View
Response (transport scotland)Consultations (Public) · PDF8 Jun 2026View
Response (sepa)Consultations (Public) · PDF5 Jun 2026View
Response (scottish water)Consultations (Public) · PDF5 Jun 2026View
Response (tca)Consultations (Public) · PDF4 Jun 2026View
Response (nithsm)Consultations (Public) · PDF3 Jun 2026View
Response (nats)Consultations (Public) · PDF3 Jun 2026View
Public notice (cumnock chronical)Public Notices · PDF3 Jun 2026View
Nn planDrawing · PDF29 May 2026View
Nn listApplication Correspondence (Public) · PDF29 May 2026View
Fei vol i main textReports (Public) · PDF20 May 2026View
Figure 4-1 potential grid routeDrawing · PDF20 May 2026View
Figure 5-1 cultural heritage assetsDrawing · PDF20 May 2026View
Figure 6-1 designated sitesDrawing · PDF20 May 2026View
Figure 6-2 protected species resultsDrawing · PDF20 May 2026View
Figure 6-3 phase 1 habitat survey resultsDrawing · PDF20 May 2026View
Figure 7-1 peatland classificationDrawing · PDF20 May 2026View
Figure 7-2 pws receptorsDrawing · PDF20 May 2026View
Eac request supplementary informationApplication Correspondence (Public)18 May 2026View
Response (msp carrick, cumnock & doon valley)Consultations (Public) · PDF2 Oct 2025View
Reneighbour notification listApplication Correspondence (Public) · PDF27 Jun 2025View
Reneighbour notification planDrawing · PDF27 Jun 2025View
Figure 1-3b proposed layoutDrawing · PDF26 Jun 2025View
Application formApplication Form · PDF26 Jun 2025View
Appendix 1-1 addendum to opmpReports (Public) · PDF19 May 2025View
Appendix 1-2 substation noise assessmentReports (Public) · PDF19 May 2025View
Appendix 2-1 transport technical noteReports (Public) · PDF19 May 2025View
Fei vol i main textReports (Public) · PDF19 May 2025View
Fei vol ii contentsReports (Public) · PDF19 May 2025View
Fei vol iii contentsReports (Public) · PDF19 May 2025View
Figure 1-2a typical turbine elevationDrawing · PDF19 May 2025View
Composite plan (modular control building)Drawing · PDF19 May 2025View
Plan 5 - section a-a (substation)Drawing · PDF19 May 2025View
Plan 10 - elevation (viewpoint 4)Drawing · PDF19 May 2025View
Plan 11 - elevations (wind farm control building)Drawing · PDF19 May 2025View
Plan 4 - substation layoutDrawing · PDF19 May 2025View
Plan 6 - section b-b (substation)Drawing · PDF19 May 2025View
Plan 7 - elevation (viewpoint 1)Drawing · PDF19 May 2025View
Plan 8 - elevation (viewpoint 2)Drawing · PDF19 May 2025View
Plan 9 - elevation (viewpoint 3)Drawing · PDF19 May 2025View
Skills and employment planReports (Public) · PDF19 May 2025View
Objection (1 of 3) (north kyle wind farm ltd per anderson strathern llp)Representations · PDF6 Dec 2024View
Objection (2 of 3) (north kyle wind farm ltd per anderson strathern)Representations · PDF6 Dec 2024View
Objection (3 of 3) (north kyle wind farm ltd per anderson strathern)Representations · PDF6 Dec 2024View
Objects (mulders, jerry)Representations · PDF14 Nov 2024View
Objects (mulders, anita)Representations · PDF14 Nov 2024View
Response (nature scotland)Consultations (Public) · PDF5 Nov 2024View
Response (arqiva)Consultations (Public) · PDF28 Oct 2024View
Response (sepa)Consultations (Public) · PDF21 Oct 2024View
Response (nature scot)Consultations (Public) · PDF9 Oct 2024View
Response (historic environment scotland)Consultations (Public) · PDF4 Oct 2024View
Response (mod)Consultations (Public) · PDF4 Oct 2024View
Response (nith valley salmon fisheries board)Consultations (Public) · PDF1 Oct 2024View
Response (coal authority) 1 of 2Consultations (Public) · PDF1 Oct 2024View
Cumnock chronicle (eia)Public Notices · PDF27 Sept 2024View
Cumnock chroniclePublic Notices · PDF27 Sept 2024View
Response (scottish forestry)Consultations (Public) · PDF26 Sept 2024View
Response transport scotlandConsultations (Public) · PDF25 Sept 2024View
Response (transport scotland)Consultations (Public) · PDF25 Sept 2024View
Response (hes)Consultations (Public) · PDF19 Sept 2024View
Response (hes)Consultations (Public) · PDF19 Sept 2024View
Response (env health)Consultations (Public) · PDF18 Sept 2024View
Neighbour notification listApplication Correspondence (Public) · PDF17 Sept 2024View
Neighbour notification planDrawing · PDF17 Sept 2024View
Response (roads - flooding)Consultations (Public) · PDF17 Sept 2024View
_may 2017_es_vol ii back coverReports (Public) · PDF10 Sept 2024View
_may 2017_es_vol ii contentsReports (Public) · PDF10 Sept 2024View
_may 2017_es_vol ii front coverReports (Public) · PDF10 Sept 2024View
May 2017_es_figure 6 point 1 site locationDrawing · PDF10 Sept 2024View
May 2017_es_figure 6 point 10 landscape ztvDrawing · PDF10 Sept 2024View
May 2017_es_figure 6 point 11 landscape character ztvDrawing · PDF10 Sept 2024View
May 2017_es_figure 6 point 12 recreational routes ztvDrawing · PDF10 Sept 2024View
May 2017_es_figure 6 point 13 design analysis planDrawing · PDF10 Sept 2024View
May 2017_es_figure 6 point 2 landscape designationsDrawing · PDF10 Sept 2024View
May 2017_es_figure 6 point 3 local landscape designationsDrawing · PDF10 Sept 2024View
May 2017_es_figure 6 point 4 landscaoe characterDrawing · PDF10 Sept 2024View
May 2017_es_figure 6 point 5 local landscape characterDrawing · PDF10 Sept 2024View
May 2017_es_figure 6 point 6 ztvDrawing · PDF10 Sept 2024View
May 2017_es_figure 6 point 7 ztvDrawing · PDF10 Sept 2024View
May 2017_es_figure 6 point 8 ztvDrawing · PDF10 Sept 2024View
May 2017_es_figure 6 point 9 ztv to hubDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 1 point 1 location planDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 1 point 2 proposed turbine layoutDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 3 point 1 proposed site layoutDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 3 point 10 typical substation elevationsDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 3 point 11 typical substation roof and floor planDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 3 point 2 typical turbine elevationDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 3 point 3 typical turbine foundationsDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 3 point 4 typical track cross sectionsDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 3 point 5 typical watercourse crossingDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 3 point 6 site establishment compoundDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 3 point 7 typical construction compoundDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 3 point 8 typical crane hardstandingDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 3 point 9 typical trench designDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 4 point 1 site selection criteriaDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 4 point 2 first layout iterationDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 4 point 3 second layout iterationDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 4 point 4 third layout iterationDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 4 point 5 fourth layout iterationDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 4 point 6 fifth layout iterationDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 6 point 13b-g design wirelinesDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 6 point 14 ztvDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 6 point 15 ztvDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 7 point 1Drawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 7 point 2Drawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 7 point 3 - 7 point 9 cumulative visualisationsDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 8 point 1 ds 20kDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 8 point 10 raptors_2015Drawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 8 point 11 waders br2014Drawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 8 point 12 waders br2015Drawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 8 point 13 winteractivity_nbr2013_2014Drawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 8 point 14 winteractivity_nbr2014_2015Drawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 8 point 15 cumulativesitesDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 8 point 2 sb saDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 8 point 3 vp vsDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 8 point 4 vp nbr2013_2014Drawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 8 point 5 vp br2014Drawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 8 point 6 vp nbr2014_2015Drawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 8 point 7 vp br2015Drawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 8 point 8 vp br2016Drawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 9 point 1 dsDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 9 point 4 gwdte habitatsDrawing · PDF10 Sept 2024View
_may 2017_es_vol iii back coverReports (Public) · PDF10 Sept 2024View
_may 2017_es_vol iii contentsReports (Public) · PDF10 Sept 2024View
_may 2017_es_vol iii front coverReports (Public) · PDF10 Sept 2024View
May 2017_es_vol ii figure 10 point 1 noise assessment location and predictionsDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 11 point 1 study areaDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 11 point 2 atc locationsDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 12 point 1 dlDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 12 point 2 hcDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 12 point 3 dtmDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 12 point 4 point 1 br_bgsDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 12 point 4 point 2_s_bgsDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 12 point 5 wcDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 12 point 6 pwsDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 12 point 7 gwdteDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 12 point 8 p2 peat samplesDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 12 point 9 peat p2Drawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 13 point 1 forestry study areaDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 13 point 2 baseline species planDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 13 point 3 wind farm felling planDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 13 point 4 wind farm restock planDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 15 point 1 tv shadow areaDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 9 point 11 hmpDrawing · PDF10 Sept 2024View
May 2017_es_vol ii figure 9 point 6 psDrawing · PDF10 Sept 2024View
May 2017_es_vol iii appendix 1 point 1 scoping reportReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 1 point 2 east ayrshire council scoping responseReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 1 point 3 consultee responsesReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 3 point 1 over hill carbon calculatorReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 3 point 2 report on decommissioning and restorationReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6a clvia figure 01aDrawing · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6a clvia figure 01bDrawing · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6a clvia figure 02aDrawing · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6a clvia figure 02bDrawing · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6a clvia figure 03aDrawing · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6a clvia figure 03bDrawing · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6a clvia figure 04Drawing · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6a_aReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6a_bReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6a_cReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6a_dReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6a_eReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6a_fReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6a_gReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6a_hReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6a_iReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6a_jReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6a_kReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6b cumulative vp7Reports (Public) · PDF10 Sept 2024View
March 2018_fei vol i main textReports (Public) · PDF10 Sept 2024View
March 2018_fei_figure 2 point 1 constraints and layout planDrawing · PDF10 Sept 2024View
March 2018_fei_figure 3 point 1 turbine and infrastucture layout planDrawing · PDF10 Sept 2024View
March 2018_fei_figure 4 point 1 proposed layoutDrawing · PDF10 Sept 2024View
March 2018_fei_figure 4 point 2 study areaDrawing · PDF10 Sept 2024View
March 2018_fei_figure 4 point 3 dtmDrawing · PDF10 Sept 2024View
March 2018_fei_figure 4 point 4 point 1 bedrock geologyDrawing · PDF10 Sept 2024View
March 2018_fei_figure 4 point 4 point 2 superficial depositsDrawing · PDF10 Sept 2024View
March 2018_fei_figure 4 point 5 watercourse buffersDrawing · PDF10 Sept 2024View
March 2018_fei_figure 4 point 6 pwsDrawing · PDF10 Sept 2024View
March 2018_fei_figure 4 point 7 gwdteDrawing · PDF10 Sept 2024View
March 2018_fei_figure 4 point 8 peat probing locationsDrawing · PDF10 Sept 2024View
March 2018_fei_figure 4 point 9 peat depthDrawing · PDF10 Sept 2024View
March 2018_fei_figure 5 point 1 felling planDrawing · PDF10 Sept 2024View
March 2018_fei_figure 5 point 2 restock planDrawing · PDF10 Sept 2024View
March 2018_fei_figure 5 point 3 compensatory plantingDrawing · PDF10 Sept 2024View
May 2017_es_vol iii appendix 10 point 1 noise and vibrationReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 11 point 1 abnormal loads assessmentReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 12 point 1 water crossingsReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 12 point 2 pwsReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 12 point 3 gwdteReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 12 point 4 peat depth and coring surveyReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 12 point 5 dpmpReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 12 point 6 plhraReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 12 point 7 borrow pit assessmentReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 12 point 8 cmraReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 14 point 1 contractor procurement policyReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 14 point 2 shared ownership ccReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 16 point 1 over hill conditionsReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6b cumulative vp10Reports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6b cumulative vp11Reports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6b cumulative vp17Reports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6b cumulative vp18Reports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6c rvaaReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6c_rvaa aReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6c_rvaa abReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6c_rvaa acReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6c_rvaa figures 01Drawing · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6c_rvaa figures 02Drawing · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6d methodologyReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6d vp1Reports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6d vp10Reports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6d vp11Reports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6d vp12Reports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6d vp13Reports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6d vp14Reports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6d vp15Reports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6d vp16Reports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6d vp17Reports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6d vp18Reports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6d vp19Reports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6d vp2Reports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6d vp20Reports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6d vp21Reports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6d vp22Reports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6d vp23Reports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6d vp3Reports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6d vp4Reports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6d vp5Reports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6d vp6Reports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6d vp7Reports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6d vp8Reports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6d vp9Reports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6e lct sensitivityReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6f vpt assessReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 6g clviaReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 7 point 1-7 point 2Reports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 8 point 1 annex aReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 8 point 1 annex bReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 8 point 1 annex cReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 8 point 1 annex dReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 8 point 1 annex eReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 8 point 1 ornithologyReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 9 point 1 nvc survey reportReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iii appendix 9 point 8 ohmrpReports (Public) · PDF10 Sept 2024View
May 2017_es_vol iv non technical summaryReports (Public) · PDF10 Sept 2024View
_march 2018_fei_vol ii lvia figures back coverReports (Public) · PDF10 Sept 2024View
_march 2018_fei_vol ii lvia figures contentsReports (Public) · PDF10 Sept 2024View
_march 2018_fei_vol ii lvia figures front coverReports (Public) · PDF10 Sept 2024View
March 2018_fei_figure 6 point 1 designated sitesDrawing · PDF10 Sept 2024View
March 2018_fei_figure 6 point 11 outline hmpReports (Public) · PDF10 Sept 2024View
March 2018_fei_figure 6 point 13 study areasDrawing · PDF10 Sept 2024View
March 2018_fei_figure 6 point 4a gwdte surveyDrawing · PDF10 Sept 2024View
March 2018_fei_figure 6 point 4b gwdte surveyDrawing · PDF10 Sept 2024View
March 2018_fei_figure 6 point 4c gwdte surveyDrawing · PDF10 Sept 2024View
March 2018_fei_figure 6 point 4e gwdte surveyDrawing · PDF10 Sept 2024View
March 2018_fei_figure 8 point 1 archaeological constraintsDrawing · PDF10 Sept 2024View
March 2018_fei_figure 9 point 1 mining constraintsDrawing · PDF10 Sept 2024View
March 2018_fei_vol ii lvia figure 10 point 1 location planDrawing · PDF10 Sept 2024View
March 2018_fei_vol ii lvia figure 10 point 10 comparative ztv 35kmDrawing · PDF10 Sept 2024View
March 2018_fei_vol ii lvia figure 10 point 2 landscape designationsDrawing · PDF10 Sept 2024View
March 2018_fei_vol ii lvia figure 10 point 3 local landscape designationsDrawing · PDF10 Sept 2024View
March 2018_fei_vol ii lvia figure 10 point 4 landscape characterDrawing · PDF10 Sept 2024View
March 2018_fei_vol ii lvia figure 10 point 5 local landscape characterDrawing · PDF10 Sept 2024View
March 2018_fei_vol ii lvia figure 10 point 6 ztv to tip 35kmDrawing · PDF10 Sept 2024View
March 2018_fei_vol ii lvia figure 10 point 7 ztv to hub 35kmDrawing · PDF10 Sept 2024View
March 2018_fei_vol ii lvia figure 10 point 8 ztv to tip 15kmDrawing · PDF10 Sept 2024View
March 2018_fei_vol ii lvia figure 10 point 9 ztv to hub 15kmDrawing · PDF10 Sept 2024View
_march 2018_fei_vol iii appendix 3 point 1 carbon calculatorReports (Public) · PDF10 Sept 2024View
_march 2018_fei_vol iii contentsReports (Public) · PDF10 Sept 2024View
_march 2018_fei_vol iii front coverReports (Public) · PDF10 Sept 2024View
_oct 2020_eia_vol ii contentsReports (Public) · PDF10 Sept 2024View
August 2018_fei_part 1 of 4Reports (Public) · PDF10 Sept 2024View
August 2018_fei_part 2 of 4Reports (Public) · PDF10 Sept 2024View
August 2018_fei_part 3 of 4Reports (Public) · PDF10 Sept 2024View
August 2018_fei_part 4 of 4Reports (Public) · PDF10 Sept 2024View
March 2018_fei_vol ii lvia figure 10 point 11 comparative ztv 15kmDrawing · PDF10 Sept 2024View
March 2018_fei_vol ii lvia figure 10 point 12 landscape designations ztvDrawing · PDF10 Sept 2024View
March 2018_fei_vol ii lvia figure 10 point 13 landscape character ztvDrawing · PDF10 Sept 2024View
March 2018_fei_vol ii lvia figure 10 point 14 recreational receptorsDrawing · PDF10 Sept 2024View
March 2018_fei_vol ii lvia figure 10 point 15 design analysis planDrawing · PDF10 Sept 2024View
March 2018_fei_vol ii lvia figure 10 point 16 ztv to tipDrawing · PDF10 Sept 2024View
March 2018_fei_vol ii lvia figure 10 point 17 ztv to hubDrawing · PDF10 Sept 2024View
March 2018_fei_vol ii lvia figures 360 degree cumulative visualisationsDrawing · PDF10 Sept 2024View
March 2018_fei_vol ii lvia figures 90 degree cumulative visualisationsDrawing · PDF10 Sept 2024View
March 2018_fei_vol ii lvia figures viewpoint 1Drawing · PDF10 Sept 2024View
March 2018_fei_vol ii lvia figures viewpoint 10Drawing · PDF10 Sept 2024View
March 2018_fei_vol ii lvia figures viewpoint 11Drawing · PDF10 Sept 2024View
March 2018_fei_vol ii lvia figures viewpoint 12Drawing · PDF10 Sept 2024View
March 2018_fei_vol ii lvia figures viewpoint 13Drawing · PDF10 Sept 2024View
March 2018_fei_vol ii lvia figures viewpoint 14Drawing · PDF10 Sept 2024View
March 2018_fei_vol ii lvia figures viewpoint 15Drawing · PDF10 Sept 2024View
March 2018_fei_vol ii lvia figures viewpoint 16Drawing · PDF10 Sept 2024View
March 2018_fei_vol ii lvia figures viewpoint 17Drawing · PDF10 Sept 2024View
March 2018_fei_vol ii lvia figures viewpoint 18Drawing · PDF10 Sept 2024View
March 2018_fei_vol ii lvia figures viewpoint 19Drawing · PDF10 Sept 2024View
March 2018_fei_vol ii lvia figures viewpoint 2Drawing · PDF10 Sept 2024View
March 2018_fei_vol ii lvia figures viewpoint 20Drawing · PDF10 Sept 2024View
March 2018_fei_vol ii lvia figures viewpoint 21Drawing · PDF10 Sept 2024View
March 2018_fei_vol ii lvia figures viewpoint 22Drawing · PDF10 Sept 2024View
March 2018_fei_vol ii lvia figures viewpoint 23Drawing · PDF10 Sept 2024View
March 2018_fei_vol ii lvia figures viewpoint 3Drawing · PDF10 Sept 2024View
March 2018_fei_vol ii lvia figures viewpoint 4Drawing · PDF10 Sept 2024View
March 2018_fei_vol ii lvia figures viewpoint 5Drawing · PDF10 Sept 2024View
March 2018_fei_vol ii lvia figures viewpoint 6Drawing · PDF10 Sept 2024View
March 2018_fei_vol ii lvia figures viewpoint 7Drawing · PDF10 Sept 2024View
March 2018_fei_vol ii lvia figures viewpoint 8Drawing · PDF10 Sept 2024View
March 2018_fei_vol ii lvia figures viewpoint 9Drawing · PDF10 Sept 2024View
March 2018_fei_vol iii appendix 10 point 1 scope of clviaReports (Public) · PDF10 Sept 2024View
March 2018_fei_vol iii appendix 11 part iReports (Public) · PDF10 Sept 2024View
March 2018_fei_vol iii appendix 11 part iiReports (Public) · PDF10 Sept 2024View
March 2018_fei_vol iii appendix 11 part iiiReports (Public) · PDF10 Sept 2024View
March 2018_fei_vol iii appendix 12 part iReports (Public) · PDF10 Sept 2024View
March 2018_fei_vol iii appendix 12 part iiReports (Public) · PDF10 Sept 2024View
March 2018_fei_vol iii appendix 3 point 1 carbon calculatorReports (Public) · PDF10 Sept 2024View
March 2018_fei_vol iii appendix 4 point 1 watercourse crossingsReports (Public) · PDF10 Sept 2024View
March 2018_fei_vol iii appendix 4 point 2 pwsReports (Public) · PDF10 Sept 2024View
March 2018_fei_vol iii appendix 4 point 3 gwdteReports (Public) · PDF10 Sept 2024View
March 2018_fei_vol iii appendix 4 point 4 part iReports (Public) · PDF10 Sept 2024View
March 2018_fei_vol iii appendix 4 point 4 part iiReports (Public) · PDF10 Sept 2024View
March 2018_fei_vol iii appendix 4 point 5 part iReports (Public) · PDF10 Sept 2024View
March 2018_fei_vol iii appendix 4 point 5 part iiReports (Public) · PDF10 Sept 2024View
March 2018_fei_vol iii appendix 4 point 5 part iiiReports (Public) · PDF10 Sept 2024View
March 2018_fei_vol iii appendix 6 point 1 part iReports (Public) · PDF10 Sept 2024View
March 2018_fei_vol iii appendix 6 point 1 part iiReports (Public) · PDF10 Sept 2024View
March 2018_fei_vol iii appendix 6 point 2 correspondenceReports (Public) · PDF10 Sept 2024View
Oct 2020_eia_vol i main textReports (Public) · PDF10 Sept 2024View
Oct 2020_eia_vol ii figures 1 point 1 - 3 point 11Drawing · PDF10 Sept 2024View
Apr 2021_fei_appendix 1 point 1 eac email - 11 march 2021Reports (Public) · PDF10 Sept 2024View
Apr 2021_fei_appendix 2 point 1 - nightime visualisations viewpoint 7Reports (Public) · PDF10 Sept 2024View
Apr 2021_fei_appendix 2 point 2 - nighttime visualisations viewpoint aReports (Public) · PDF10 Sept 2024View
Apr 2021_fei_appendix 2 point 3 - luxsolar-datasheetReports (Public) · PDF10 Sept 2024View
Apr 2021_fei_appendix 2 point 4 - operational turbine lightingReports (Public) · PDF10 Sept 2024View
Apr 2021_fei_appendix 2 point 5 - review of hepla rvaaReports (Public) · PDF10 Sept 2024View
Apr 2021_fei_appendix 4 point 1 - carbon calculatorReports (Public) · PDF10 Sept 2024View
Apr 2021_fei_figure 2 point 1 - lighting cztv - overhill lethans windy standardReports (Public) · PDF10 Sept 2024View
Apr 2021_fei_figure 2 point 2 - lighting cztv - overhill sanquhar 2Reports (Public) · PDF10 Sept 2024View
Apr 2021_fei_main textReports (Public) · PDF10 Sept 2024View
Oct 2020_eia_vol ii figures 10 point 10-10 point 15Drawing · PDF10 Sept 2024View
Oct 2020_eia_vol ii figures 10 point 1-10 point 4Drawing · PDF10 Sept 2024View
Oct 2020_eia_vol ii figures 10 point 16-10 point 19Drawing · PDF10 Sept 2024View
Oct 2020_eia_vol ii figures 10 point 5-10 point 9Drawing · PDF10 Sept 2024View
Oct 2020_eia_vol ii viewpoint 1Drawing · PDF10 Sept 2024View
Oct 2020_eia_vol ii viewpoint 11Drawing · PDF10 Sept 2024View
Oct 2020_eia_vol ii viewpoint 2Drawing · PDF10 Sept 2024View
Oct 2020_eia_vol ii viewpoint 3Drawing · PDF10 Sept 2024View
Oct 2020_eia_vol ii viewpoint 4Drawing · PDF10 Sept 2024View
Oct 2020_eia_vol ii viewpoint 5Drawing · PDF10 Sept 2024View
Oct 2020_eia_vol ii viewpoint 6Drawing · PDF10 Sept 2024View
Oct 2020_eia_vol ii viewpoint 7Drawing · PDF10 Sept 2024View
Oct 2020_eia_vol ii viewpoint 8Drawing · PDF10 Sept 2024View
Oct 2020_eia_vol ii viewpoint 9Drawing · PDF10 Sept 2024View
Oct 2020_eia_vol ii viewpoints 12 - 24Drawing · PDF10 Sept 2024View
Oct 2020_eia_vol iii appendicesReports (Public) · PDF10 Sept 2024View
Oct 2020_eia_vol iiviewpoint 10Drawing · PDF10 Sept 2024View
Comparative eiar vol iReports (Public) · PDF3 Sept 2024View
Comparative eiar vol ii contentsReports (Public) · PDF3 Sept 2024View
Figure 1-4 typical turbine foundationsDrawing · PDF3 Sept 2024View
Figure 1-5 typical track cross sectionsDrawing · PDF3 Sept 2024View
Figure 1-6 typical watercourse crossingDrawing · PDF3 Sept 2024View
Figure 1-7 typical construction compoundDrawing · PDF3 Sept 2024View
Figure 1-9 typical cable trench designDrawing · PDF3 Sept 2024View
Figure 3-8 typical crane hardstandingDrawing · PDF3 Sept 2024View
Composite plan (modular control building)Drawing · PDF3 Sept 2024View
Figure 1.1 location planDrawing · PDF3 Sept 2024View
Proposed electrical layout overhill wf connectionDrawing · PDF3 Sept 2024View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.