Council planning record

Planning application under Section 42 of the Town and Country Planning (Scotland) Act 1997 to vary conditions 6, 7, 9 and 10 of planning permission 20/0425/PP to allow the extension of the operational life of the wind farm from 25 to 35 years.

Overhill Wind Farm B741 From Armour Wynd To U720 Dalricket Dalmellington East Ayrshire

DecidedReference: 24/0397/PPEast Ayrshire

Last published check: 14 Oct 2026, 07:56. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Actual Committee Date

    Published milestoneCouncil source
  5. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Standard Consultation Date

    Published milestoneCouncil source
  7. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  8. Last Advertised In Press Date

    Published milestoneCouncil source
  9. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Decision Issued Date

    Published milestoneCouncil source
  13. Decision Made Date

    Published milestoneCouncil source

Application summary

Status
Decided
Application type
Planning Permission
Received
13 Aug 2024
Validated
2 Sept 2024
Determination deadline
1 Jan 2025
Local authority
East Ayrshire

Application overview

Planning application under Section 42 of the Town and Country Planning (Scotland) Act 1997 to vary conditions 6, 7, 9 and 10 of planning permission 20/0425/PP to allow the extension of the operational life of the wind farm from 25 to 35 years.

Proposal details

Reference
24/0397/PP
Alternative references
100680901-001
Ward
Cumnock And New Cumnock

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Overhill Wind Farm B741 From Armour Wynd To U720 Dalricket Dalmellington East Ayrshire

This record has no verified map location.

View council map

Documents 349 of 349

DocumentPublishedAction
Approved with conditions - decision noticeDecision Notices · PDF15 Sept 2026View
Public notice (chronical)Public Notices · PDF24 Jun 2026View
Re-neighbour notification plan (dm and eia regs)Drawing · PDF17 Jun 2026View
Fei vol i main textReports (Public) · PDF28 May 2026View
Figure 4-1 potential grid routeDrawing · PDF28 May 2026View
Figure 4-2 theoretical grid routeDrawing · PDF28 May 2026View
Figure 4-3 scoped in connection routeDrawing · PDF28 May 2026View
Figure 5-1 cultural heritageDrawing · PDF28 May 2026View
Figure 6-1 designated sitesDrawing · PDF28 May 2026View
Figure 6-2 protected species resultsDrawing · PDF28 May 2026View
Figure 6-3 phase 1 habitat survey resultsDrawing · PDF28 May 2026View
Figure 7-1 peatland classificationDrawing · PDF28 May 2026View
Figure 7-2 pws receptorsDrawing · PDF28 May 2026View
Application pdfApplication Form · PDF28 May 2026View
Approved - eiar vol ii figure 1.2a typical turbine elevationDrawing · PDF5 Jun 2025View
Application pdfApplication Form · PDF5 Jun 2025View
Cumnock chroniclePublic Notices · PDF20 Sept 2024View
Neighbour notification plan (eia regs)Drawing · PDF10 Sept 2024View
Comparative eiar vol ii figure 1-2 turbine elevationReports (Public) · PDF3 Sept 2024View
_oct 2020_eia_vol ii contentsDrawing · PDF2 Sept 2024View
Apr 2021_fei_appendix 2 point 1 - nightime visualisations viewpoint 7Reports (Public) · PDF2 Sept 2024View
Apr 2021_fei_appendix 2 point 2 - nighttime visualisations viewpoint aReports (Public) · PDF2 Sept 2024View
Apr 2021_fei_appendix 2 point 3 - luxsolar-datasheetReports (Public) · PDF2 Sept 2024View
Apr 2021_fei_appendix 2 point 4 - operational turbine lightingReports (Public) · PDF2 Sept 2024View
Apr 2021_fei_appendix 2-5 - review of hepla rvaaReports (Public) · PDF2 Sept 2024View
Apr 2021_fei_appendix 4 point 1 - carbon calculatorReports (Public) · PDF2 Sept 2024View
Apr 2021_fei_appendix 4 point 2 - pre construction bat monitoring reportReports (Public) · PDF2 Sept 2024View
Apr 2021_fei_figure 2 point 1 - lighting cztv - overhill lethans windy standardDrawing · PDF2 Sept 2024View
Apr 2021_fei_figure 2 point 2 - lighting cztv - overhill sanquhar 2Drawing · PDF2 Sept 2024View
Apr 2021_fei_main textReports (Public) · PDF2 Sept 2024View
Approved - oct 2020_eia_vol ii figures 3.1 - 3.11Drawing · PDF2 Sept 2024View
Oct 2020_eia_vol ii figures 10 point 10-10 point 15Drawing · PDF2 Sept 2024View
Oct 2020_eia_vol ii figures 10 point 1-10 point 4Reports (Public) · PDF2 Sept 2024View
Oct 2020_eia_vol ii figures 10 point 16-10 point 19Drawing · PDF2 Sept 2024View
Oct 2020_eia_vol ii figures 10 point 5-10 point 9Drawing · PDF2 Sept 2024View
Oct 2020_eia_vol ii viewpoint 1Drawing · PDF2 Sept 2024View
Oct 2020_eia_vol ii viewpoint 11Drawing · PDF2 Sept 2024View
Oct 2020_eia_vol ii viewpoint 2Drawing · PDF2 Sept 2024View
Oct 2020_eia_vol ii viewpoint 3Drawing · PDF2 Sept 2024View
Oct 2020_eia_vol ii viewpoint 4Drawing · PDF2 Sept 2024View
Oct 2020_eia_vol ii viewpoint 5Drawing · PDF2 Sept 2024View
Oct 2020_eia_vol ii viewpoint 6Drawing · PDF2 Sept 2024View
Oct 2020_eia_vol ii viewpoint 7Drawing · PDF2 Sept 2024View
Oct 2020_eia_vol ii viewpoint 8Drawing · PDF2 Sept 2024View
Oct 2020_eia_vol ii viewpoint 9Drawing · PDF2 Sept 2024View
Oct 2020_eia_vol ii viewpoints 12 - 24Drawing · PDF2 Sept 2024View
Oct 2020_eia_vol iii appendicesReports (Public) · PDF2 Sept 2024View
Oct 2020_eia_vol iiviewpoint 10Drawing · PDF2 Sept 2024View
_may 2017_es_vol ii back coverReports (Public) · PDF30 Aug 2024View
_may 2017_es_vol ii contentsReports (Public) · PDF30 Aug 2024View
_may 2017_es_vol ii front coverReports (Public) · PDF30 Aug 2024View
May 2017_es vol i main textReports (Public) · PDF30 Aug 2024View
May 2017_es_figure 6 point 1 site locationDrawing · PDF30 Aug 2024View
May 2017_es_figure 6 point 10 landscape ztvDrawing · PDF30 Aug 2024View
May 2017_es_figure 6 point 11 landscape character ztvDrawing · PDF30 Aug 2024View
May 2017_es_figure 6 point 12 recreational routes ztvDrawing · PDF30 Aug 2024View
May 2017_es_figure 6 point 13 design analysis planDrawing · PDF30 Aug 2024View
May 2017_es_figure 6 point 2 landscape designationsDrawing · PDF30 Aug 2024View
May 2017_es_figure 6 point 3 local landscape designationsDrawing · PDF30 Aug 2024View
May 2017_es_figure 6 point 4 landscaoe characterDrawing · PDF30 Aug 2024View
May 2017_es_figure 6 point 5 local landscape characterDrawing · PDF30 Aug 2024View
May 2017_es_figure 6 point 6 ztvDrawing · PDF30 Aug 2024View
May 2017_es_figure 6 point 7 ztvDrawing · PDF30 Aug 2024View
May 2017_es_figure 6 point 8 ztvDrawing · PDF30 Aug 2024View
May 2017_es_figure 6 point 9 ztv to hubDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 1 point 1 location planDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 1 point 2 proposed turbine layoutDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 3 point 1 proposed site layoutDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 3 point 10 typical substation elevationsDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 3 point 11 typical substation roof and floor planDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 3 point 2 typical turbine elevationDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 3 point 3 typical turbine foundationsDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 3 point 4 typical track cross sectionsDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 3 point 5 typical watercourse crossingDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 3 point 6 site establishment compoundDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 3 point 7 typical construction compoundDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 3 point 8 typical crane hardstandingDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 3 point 9 typical trench designDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 4 point 1 site selection criteriaDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 4 point 2 first layout iterationDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 4 point 3 second layout iterationDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 4 point 4 third layout iterationDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 4 point 5 fourth layout iterationDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 4 point 6 fifth layout iterationDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 6 point 13b-g design wirelinesDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 6 point 14 ztvDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 6 point 15 ztvDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 7 point 1Drawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 7 point 2Drawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 7 point 3 - 7 point 9 cumulative visualisationsDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 8 point 1 ds 20kDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 8 point 10 raptors_2015Drawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 8 point 11 waders br2014Drawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 8 point 12 waders br2015Drawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 8 point 13 winteractivity_nbr2013_2014Drawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 8 point 14 winteractivity_nbr2014_2015Drawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 8 point 15 cumulativesitesDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 8 point 2 sb saDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 8 point 3 vp vsDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 8 point 4 vp nbr2013_2014Drawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 8 point 5 vp br2014Drawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 8 point 6 vp nbr2014_2015Drawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 8 point 7 vp br2015Drawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 8 point 8 vp br2016Drawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 9 point 1 dsDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 9 point 2 p1 habitatsDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 9 point 3 nvc habitatsDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 9 point 4 gwdte habitatsDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 9 point 5 annex1 habitatsDrawing · PDF30 Aug 2024View
_may 2017_es_vol iii back coverReports (Public) · PDF30 Aug 2024View
_may 2017_es_vol iii contentsReports (Public) · PDF30 Aug 2024View
_may 2017_es_vol iii front coverReports (Public) · PDF30 Aug 2024View
May 2017_es_vol ii figure 10 point 1 noise assessment location and predictionsDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 11 point 1 study areaDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 11 point 2 atc locationsDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 12 point 1 dlDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 12 point 2 hcDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 12 point 3 dtmDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 12 point 4 point 1 br_bgsDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 12 point 4 point 2_s_bgsDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 12 point 5 wcDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 12 point 6 pwsDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 12 point 7 gwdteDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 12 point 8 p2 peat samplesDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 12 point 9 peat p2Drawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 13 point 1 forestry study areaDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 13 point 2 baseline species planDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 13 point 3 wind farm felling planDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 13 point 4 wind farm restock planDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 15 point 1 tv shadow areaDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 9 point 10 bat temporal activity pie 2016Drawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 9 point 11 hmpDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 9 point 6 psDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 9 point 7 bat survey locationsDrawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 9 point 8 bat spatialactivity_2014Drawing · PDF30 Aug 2024View
May 2017_es_vol ii figure 9 point 9 bat temporal activity_pie_2014Drawing · PDF30 Aug 2024View
May 2017_es_vol iii appendix 1 point 1 scoping reportReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 1 point 2 east ayrshire council scoping responseReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 1 point 3 consultee responsesReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 3 point 1 over hill carbon calculatorReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 3 point 2 report on decommissioning and restorationReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6a clvia figure 01aDrawing · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6a clvia figure 01bDrawing · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6a clvia figure 02aDrawing · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6a clvia figure 02bDrawing · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6a clvia figure 03aDrawing · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6a clvia figure 03bDrawing · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6a clvia figure 04Drawing · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6a_aReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6a_bReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6a_cReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6a_dReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6a_eReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6a_fReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6a_gReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6a_hReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6a_iReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6a_jReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6a_kReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6b cumulative vp7Reports (Public) · PDF30 Aug 2024View
March 2018_fei vol i main textReports (Public) · PDF30 Aug 2024View
March 2018_fei_figure 2 point 1 constraints and layout planDrawing · PDF30 Aug 2024View
March 2018_fei_figure 3 point 1 turbine and infrastucture layout planDrawing · PDF30 Aug 2024View
March 2018_fei_figure 4 point 1 proposed layoutDrawing · PDF30 Aug 2024View
March 2018_fei_figure 4 point 2 study areaDrawing · PDF30 Aug 2024View
March 2018_fei_figure 4 point 3 dtmDrawing · PDF30 Aug 2024View
March 2018_fei_figure 4 point 4 point 1 bedrock geologyDrawing · PDF30 Aug 2024View
March 2018_fei_figure 4 point 4 point 2 superficial depositsDrawing · PDF30 Aug 2024View
March 2018_fei_figure 4 point 5 watercourse buffersDrawing · PDF30 Aug 2024View
March 2018_fei_figure 4 point 6 pwsDrawing · PDF30 Aug 2024View
March 2018_fei_figure 4 point 7 gwdteDrawing · PDF30 Aug 2024View
March 2018_fei_figure 4 point 8 peat probing locationsDrawing · PDF30 Aug 2024View
March 2018_fei_figure 4 point 9 peat depthDrawing · PDF30 Aug 2024View
March 2018_fei_figure 5 point 1 felling planDrawing · PDF30 Aug 2024View
March 2018_fei_figure 5 point 2 restock planDrawing · PDF30 Aug 2024View
May 2017_es_vol iii appendix 10 point 1 noise and vibrationReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 11 point 1 abnormal loads assessmentReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 12 point 1 water crossingsReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 12 point 2 pwsReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 12 point 3 gwdteReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 12 point 4 peat depth and coring surveyReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 12 point 5 dpmpReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 12 point 6 plhraReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 12 point 7 borrow pit assessmentReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 12 point 8 cmraReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 14 point 1 contractor procurement policyReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 14 point 2 shared ownership ccReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 16 point 1 over hill conditionsReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6b cumulative vp10Reports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6b cumulative vp11Reports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6b cumulative vp17Reports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6b cumulative vp18Reports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6c rvaaReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6c_rvaa aReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6c_rvaa abReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6c_rvaa acReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6c_rvaa figures 01Drawing · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6c_rvaa figures 02Drawing · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6d methodologyReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6d vp1Reports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6d vp10Reports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6d vp11Reports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6d vp12Reports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6d vp13Reports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6d vp14Reports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6d vp15Reports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6d vp16Reports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6d vp17Reports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6d vp18Reports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6d vp19Reports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6d vp2Reports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6d vp20Reports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6d vp21Reports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6d vp22Reports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6d vp23Reports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6d vp3Reports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6d vp4Reports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6d vp5Reports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6d vp6Reports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6d vp7Reports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6d vp8Reports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6d vp9Reports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6e lct sensitivityReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6f vpt assessReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 6g clviaReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 7 point 1-7 point 2Reports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 8 point 1 annex aReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 8 point 1 annex bReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 8 point 1 annex cReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 8 point 1 annex dReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 8 point 1 ornithologyReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 9 point 1 nvc survey reportReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 9 point 2 protected speciesReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 9 point 3 bat tech appendixReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 9 point 4 bat survey at heightReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 9 point 5 bat 2016 survey reportReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 9 point 6 ecological appraisalReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 9 point 7 species protection planReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iii appendix 9 point 8 ohmrpReports (Public) · PDF30 Aug 2024View
May 2017_es_vol iv non technical summaryReports (Public) · PDF30 Aug 2024View
_march 2018_fei_vol ii lvia figures back coverReports (Public) · PDF30 Aug 2024View
_march 2018_fei_vol ii lvia figures contentsReports (Public) · PDF30 Aug 2024View
_march 2018_fei_vol ii lvia figures front coverReports (Public) · PDF30 Aug 2024View
March 2018_fei_figure 5 point 3 compensatory plantingDrawing · PDF30 Aug 2024View
March 2018_fei_figure 6 point 1 designated sitesDrawing · PDF30 Aug 2024View
March 2018_fei_figure 6 point 10 bat temporal activityDrawing · PDF30 Aug 2024View
March 2018_fei_figure 6 point 11 outline hmpDrawing · PDF30 Aug 2024View
March 2018_fei_figure 6 point 12 ornithological designated sitesDrawing · PDF30 Aug 2024View
March 2018_fei_figure 6 point 13 study areasDrawing · PDF30 Aug 2024View
March 2018_fei_figure 6 point 2 habitat survey resultsDrawing · PDF30 Aug 2024View
March 2018_fei_figure 6 point 3a nvc habitatsDrawing · PDF30 Aug 2024View
March 2018_fei_figure 6 point 3b nvc habitatsDrawing · PDF30 Aug 2024View
March 2018_fei_figure 6 point 3c nvc habitatsDrawing · PDF30 Aug 2024View
March 2018_fei_figure 6 point 3d nvc habitatsDrawing · PDF30 Aug 2024View
March 2018_fei_figure 6 point 3e nvc habitatsDrawing · PDF30 Aug 2024View
March 2018_fei_figure 6 point 4a gwdte surveyDrawing · PDF30 Aug 2024View
March 2018_fei_figure 6 point 4b gwdte surveyDrawing · PDF30 Aug 2024View
March 2018_fei_figure 6 point 4c gwdte surveyDrawing · PDF30 Aug 2024View
March 2018_fei_figure 6 point 4d gwdte surveyDrawing · PDF30 Aug 2024View
March 2018_fei_figure 6 point 4e gwdte surveyDrawing · PDF30 Aug 2024View
March 2018_fei_figure 6 point 5a annex 1 habitatsDrawing · PDF30 Aug 2024View
March 2018_fei_figure 6 point 5b annex 1 habitatsDrawing · PDF30 Aug 2024View
March 2018_fei_figure 6 point 5c annex 1 habitatsDrawing · PDF30 Aug 2024View
March 2018_fei_figure 6 point 5d annex 1 habitatsDrawing · PDF30 Aug 2024View
March 2018_fei_figure 6 point 5e annex 1 habitatsDrawing · PDF30 Aug 2024View
March 2018_fei_figure 6 point 7 bat survey locationsDrawing · PDF30 Aug 2024View
March 2018_fei_figure 6 point 8 bat spatial activityDrawing · PDF30 Aug 2024View
March 2018_fei_figure 8 point 1 archaeological constraintsDrawing · PDF30 Aug 2024View
March 2018_fei_figure 9 point 1 mining constraintsDrawing · PDF30 Aug 2024View
March 2018_fei_vol ii lvia figure 10 point 1 location planDrawing · PDF30 Aug 2024View
March 2018_fei_vol ii lvia figure 10 point 2 landscape designationsDrawing · PDF30 Aug 2024View
March 2018_fei_vol ii lvia figure 10 point 3 local landscape designationsDrawing · PDF30 Aug 2024View
March 2018_fei_vol ii lvia figure 10 point 4 landscape characterDrawing · PDF30 Aug 2024View
March 2018_fei_vol ii lvia figure 10 point 5 local landscape characterDrawing · PDF30 Aug 2024View
March 2018_fei_vol ii lvia figure 10 point 6 ztv to tip 35kmDrawing · PDF30 Aug 2024View
March 2018_fei_vol ii lvia figure 10 point 7 ztv to hub 35kmDrawing · PDF30 Aug 2024View
March 2018_fei_vol ii lvia figure 10 point 8 ztv to tip 15kmDrawing · PDF30 Aug 2024View
March 2018_fei_vol ii lvia figure 10 point 9 ztv to hub 15kmDrawing · PDF30 Aug 2024View
_march 2018_fei_vol iii appendix 3 point 1 carbon calculatorReports (Public) · PDF30 Aug 2024View
_march 2018_fei_vol iii contentsReports (Public) · PDF30 Aug 2024View
_march 2018_fei_vol iii front coverReports (Public) · PDF30 Aug 2024View
August 2018_fei_part 1 of 4Reports (Public) · PDF30 Aug 2024View
August 2018_fei_part 2 of 4Reports (Public) · PDF30 Aug 2024View
August 2018_fei_part 3 of 4Reports (Public) · PDF30 Aug 2024View
August 2018_fei_part 4 of 4Reports (Public) · PDF30 Aug 2024View
March 2018_fei_vol ii lvia figure 10 point 10 comparative ztv 35kmDrawing · PDF30 Aug 2024View
March 2018_fei_vol ii lvia figure 10 point 11 comparative ztv 15kmDrawing · PDF30 Aug 2024View
March 2018_fei_vol ii lvia figure 10 point 12 landscape designations ztvDrawing · PDF30 Aug 2024View
March 2018_fei_vol ii lvia figure 10 point 13 landscape character ztvDrawing · PDF30 Aug 2024View
March 2018_fei_vol ii lvia figure 10 point 14 recreational receptorsDrawing · PDF30 Aug 2024View
March 2018_fei_vol ii lvia figure 10 point 15 design analysis planDrawing · PDF30 Aug 2024View
March 2018_fei_vol ii lvia figure 10 point 16 ztv to tipDrawing · PDF30 Aug 2024View
March 2018_fei_vol ii lvia figure 10 point 17 ztv to hubDrawing · PDF30 Aug 2024View
March 2018_fei_vol ii lvia figures 360 degree cumulative visualisationsDrawing · PDF30 Aug 2024View
March 2018_fei_vol ii lvia figures 90 degree cumulative visualisationsDrawing · PDF30 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 1Drawing · PDF30 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 10Drawing · PDF30 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 11Drawing · PDF30 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 12Drawing · PDF30 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 13Drawing · PDF30 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 14Drawing · PDF30 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 15Drawing · PDF30 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 16Drawing · PDF30 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 17Drawing · PDF30 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 18Drawing · PDF30 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 19Drawing · PDF30 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 2Drawing · PDF30 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 20Drawing · PDF30 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 21Drawing · PDF30 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 22Drawing · PDF30 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 23Drawing · PDF30 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 3Drawing · PDF30 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 4Drawing · PDF30 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 5Drawing · PDF30 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 6Drawing · PDF30 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 7Drawing · PDF30 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 8Drawing · PDF30 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 9Drawing · PDF30 Aug 2024View
March 2018_fei_vol iii appendix 10 point 1 scope of clviaReports (Public) · PDF30 Aug 2024View
March 2018_fei_vol iii appendix 11 part iReports (Public) · PDF30 Aug 2024View
March 2018_fei_vol iii appendix 11 part iiReports (Public) · PDF30 Aug 2024View
March 2018_fei_vol iii appendix 11 part iiiReports (Public) · PDF30 Aug 2024View
March 2018_fei_vol iii appendix 12 part iReports (Public) · PDF30 Aug 2024View
March 2018_fei_vol iii appendix 12 part iiReports (Public) · PDF30 Aug 2024View
March 2018_fei_vol iii appendix 3 point 1 carbon calculatorReports (Public) · PDF30 Aug 2024View
March 2018_fei_vol iii appendix 4 point 1 watercourse crossingsReports (Public) · PDF30 Aug 2024View
March 2018_fei_vol iii appendix 4 point 2 pwsReports (Public) · PDF30 Aug 2024View
March 2018_fei_vol iii appendix 4 point 3 gwdteReports (Public) · PDF30 Aug 2024View
March 2018_fei_vol iii appendix 4 point 4 part iReports (Public) · PDF30 Aug 2024View
March 2018_fei_vol iii appendix 4 point 4 part iiReports (Public) · PDF30 Aug 2024View
March 2018_fei_vol iii appendix 4 point 5 part iReports (Public) · PDF30 Aug 2024View
March 2018_fei_vol iii appendix 4 point 5 part iiReports (Public) · PDF30 Aug 2024View
March 2018_fei_vol iii appendix 4 point 5 part iiiReports (Public) · PDF30 Aug 2024View
March 2018_fei_vol iii appendix 6 point 1 part iReports (Public) · PDF30 Aug 2024View
March 2018_fei_vol iii appendix 6 point 1 part iiReports (Public) · PDF30 Aug 2024View
March 2018_fei_vol iii appendix 6 point 2 correspondenceReports (Public) · PDF30 Aug 2024View
Oct 2020_eia_vol i main textReports (Public) · PDF30 Aug 2024View
Comparative eiar vol ii contentsReports (Public) · PDF21 Aug 2024View
Eiar vol ii figure 3-2 typical turbine elevationDrawing · PDF21 Aug 2024View
Comparative eiar vol iReports (Public) · PDF13 Aug 2024View
Approved - eiar vol ii figure 1-1 site location planDrawing · PDF13 Aug 2024View
Eiar vol ii figure 1-4 typical turbine foundationDrawing · PDF13 Aug 2024View
Eiar vol ii figure 1-5 typical track cross sectionDrawing · PDF13 Aug 2024View
Eiar vol ii figure 1-6 typical watercourse crossingDrawing · PDF13 Aug 2024View
Eiar vol ii figure 1-7 typical construction compoundDrawing · PDF13 Aug 2024View
Eiar vol ii figure 1-8 typical crane hardstandingDrawing · PDF13 Aug 2024View
Eiar vol ii figure 1-9 typical cable trench designDrawing · PDF13 Aug 2024View
Eiar vol ii figure 3-1 turbine and infrastructure layoutDrawing · PDF13 Aug 2024View
Application pdfApplication Form · PDF13 Aug 2024View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Approved with Conditions
Approved with conditions - decision notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.