Council planning record

Planning application under Section 42 of the Town and Country Planning (Scotland) Act 1997 to vary conditions 1, 6, 7, 9, 10 and 11 of planning permission 20/0425/PP to allow an enlarged crane pad configuration; the relocation and enlargement of the on-site substation; and the extension of the operational life of the wind farm from 25 to 35 years.

Overhill Wind Farm B741 From Armour Wynd To U720 Dalricket Dalmellington East Ayrshire

RegisteredReference: 23/0624/PPEast Ayrshire

Last published check: 14 Oct 2026, 00:54. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  5. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Standard Consultation Date

    Published milestoneCouncil source
  7. Last Advertised In Press Date

    Published milestoneCouncil source
  8. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Agreed Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Registered
Application type
Planning Permission
Received
20 Nov 2023
Validated
6 Dec 2023
Determination deadline
5 Apr 2024
Local authority
East Ayrshire

Application overview

Planning application under Section 42 of the Town and Country Planning (Scotland) Act 1997 to vary conditions 1, 6, 7, 9, 10 and 11 of planning permission 20/0425/PP to allow an enlarged crane pad configuration; the relocation and enlargement of the on-site substation; and the extension of the operational life of the wind farm from 25 to 35 years.

Proposal details

Reference
23/0624/PP
Alternative references
100650565-001
Ward
Cumnock And New Cumnock

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Overhill Wind Farm B741 From Armour Wynd To U720 Dalricket Dalmellington East Ayrshire

This record has no verified map location.

View council map

Documents 454 of 454

DocumentPublishedAction
Committee reportReports (Public) · PDF2 Oct 2026View
Objection (georgette fulton)Public Comment · PDF15 Jul 2026View
Response (mod)Consultations (Public) · PDF26 Jun 2026View
Response (ara flooding)Consultations (Public) · PDF18 Jun 2026View
Response (glasprest airport)Consultations (Public) · PDF15 Jun 2026View
Response (env health)Consultations (Public) · PDF8 Jun 2026View
Response (transport scotland)Consultations (Public) · PDF8 Jun 2026View
Response (sepa)Consultations (Public) · PDF5 Jun 2026View
Response (scottish water)Consultations (Public) · PDF5 Jun 2026View
Response (tca)Consultations (Public) · PDF4 Jun 2026View
Public notice (cumnock chronical)Public Notices · PDF3 Jun 2026View
Nn listApplication Correspondence (Public) · PDF29 May 2026View
Nn planDrawing · PDF29 May 2026View
Fei vol iReports (Public) · PDF20 May 2026View
Figure 4-1 potential grid routeDrawing · PDF20 May 2026View
Figure 5-1 cultural heritage assetsDrawing · PDF20 May 2026View
Figure 6-1 designated sitesDrawing · PDF20 May 2026View
Figure 6-2 protected species resultsDrawing · PDF20 May 2026View
Figure 6-3 phase 1 habitat survey resultsDrawing · PDF20 May 2026View
Figure 7-1 peatland classificationDrawing · PDF20 May 2026View
Figure 7-2 pws receptorsDrawing · PDF20 May 2026View
Eac request supplementary informationApplication Correspondence (Public)18 May 2026View
Response (sepa)Consultations (Public)20 Mar 2026View
Response (hes)Consultations (Public)18 Feb 2026View
Response (naturescot)Reports (Public) · PDF17 Feb 2026View
Response (scottish water)Consultations (Public) · PDF29 Jan 2026View
Re nnplan230624ppApplication Correspondence (Public) · PDF22 Jan 2026View
Re nnlist230624ppApplication Correspondence (Public) · PDF22 Jan 2026View
Applicant peat details response to sepa objectionReports (Public) · PDF19 Dec 2025View
Response (sepa)Consultations (Public)4 Dec 2025View
Response (nature scot)Consultations (Public) · PDF22 Sept 2025View
Response (accon)Consultations (Public) · PDF21 Aug 2025View
Response (glasgow prestwick airport)Consultations (Public) · PDF20 Aug 2025View
Response (mod)Consultations (Public) · PDF8 Aug 2025View
Response (scottish water)Consultations (Public) · PDF7 Aug 2025View
Response (nats)Consultations (Public) · PDF6 Aug 2025View
Response (ara flooding)Consultations (Public) · PDF6 Aug 2025View
Response (coal authority)Consultations (Public) · PDF6 Aug 2025View
Response (transport scotland)Consultations (Public) · PDF5 Aug 2025View
Response (hes)Consultations (Public) · PDF4 Aug 2025View
Response (wosas)Consultations (Public) · PDF1 Aug 2025View
Application pdfApplication Form · PDF30 Jul 2025View
Revised application formApplication Form · PDF30 Jul 2025View
Response (environmental health)Consultations (Public) · PDF30 Jul 2025View
Response (scottish forestry)Consultations (Public) · PDF30 Jul 2025View
Reneighbour notification planDrawing · PDF29 Jul 2025View
Appendix 1-1 substation noise assessmentReports (Public) · PDF9 Jul 2025View
Appendix 3-1 transport technical noteReports (Public) · PDF9 Jul 2025View
Appendix 4-1 peat technical noteReports (Public) · PDF9 Jul 2025View
Fei vol i main textReports (Public) · PDF9 Jul 2025View
Fei vol ii contentsReports (Public) · PDF9 Jul 2025View
Fei vol iii contentsReports (Public) · PDF9 Jul 2025View
Figure 1-2a typical turbine elevationDrawing · PDF9 Jul 2025View
Figure 1-3a proposed layoutDrawing · PDF9 Jul 2025View
Figure 5-1 consented felling planDrawing · PDF9 Jul 2025View
Modular control building elevationsDrawing · PDF9 Jul 2025View
Plan 10 - elevation 4Drawing · PDF9 Jul 2025View
Plan 4 - substation layoutDrawing · PDF9 Jul 2025View
Plan 5 - substation section a-aDrawing · PDF9 Jul 2025View
Plan 6 - section b-bDrawing · PDF9 Jul 2025View
Plan 6 - wind farm control building elevationsDrawing · PDF9 Jul 2025View
Plan 7 - elevation 1Drawing · PDF9 Jul 2025View
Plan 8 - elevation 2Drawing · PDF9 Jul 2025View
Plan 9 -elevation 3Drawing · PDF9 Jul 2025View
Skills and employment planReports (Public) · PDF9 Jul 2025View
Objection (1 of 3) (north kyle wind farm ltd per anderson strathern llp)Representations · PDF6 Dec 2024View
Objection (2 of 3) (north kyle wind farm ltd per anderson strathern)Representations · PDF6 Dec 2024View
Objection (3 of 3) (north kyle wind farm ltd per anderson strathern)Representations · PDF6 Dec 2024View
Response (nature scotland)Consultations (Public) · PDF31 Oct 2024View
Response (arqiva)Consultations (Public) · PDF28 Oct 2024View
Response (sepa)Consultations (Public) · PDF21 Oct 2024View
Response (accon)Consultations (Public) · PDF11 Oct 2024View
Response (glasgow prestwick airport)Consultations (Public) · PDF8 Oct 2024View
Response (historic environment scotland)Consultations (Public) · PDF4 Oct 2024View
Response (mod)Consultations (Public) · PDF4 Oct 2024View
Cumnock chroniclePublic Notices · PDF20 Sept 2024View
Response (1 of 2) (transport scotland)Consultations (Public) · PDF19 Sept 2024View
Response (2 of 2) (transport scotland)Consultations (Public) · PDF19 Sept 2024View
Response (coal authority)Consultations (Public) · PDF17 Sept 2024View
Response (roads flooding)Consultations (Public) · PDF16 Sept 2024View
Response (scottish water)Consultations (Public) · PDF13 Sept 2024View
Response (env health)Consultations (Public) · PDF12 Sept 2024View
Reneighbour notification listApplication Correspondence (Public) · PDF11 Sept 2024View
Reneighbour notification planDrawing · PDF11 Sept 2024View
Apr 2021_fei_appendix 1 point 1 - eac email 11 march 2021Reports (Public) · PDF19 Aug 2024View
Apr 2021_fei_appendix 2 point 1 - nightime visualisations viewpoint 7Reports (Public) · PDF19 Aug 2024View
Apr 2021_fei_appendix 2 point 2 - nighttime visualisations viewpoint aReports (Public) · PDF19 Aug 2024View
Apr 2021_fei_appendix 2 point 3 - luxsolar-datasheetReports (Public) · PDF19 Aug 2024View
Apr 2021_fei_appendix 2 point 4 - operational turbine lightingReports (Public) · PDF19 Aug 2024View
Apr 2021_fei_appendix 2-5 - review of hepla rvaaReports (Public) · PDF19 Aug 2024View
Apr 2021_fei_appendix 4 point 1 - carbon calculatorReports (Public) · PDF19 Aug 2024View
Apr 2021_fei_appendix 4 point 2 - pre construction bat monitoring reportReports (Public) · PDF19 Aug 2024View
Apr 2021_fei_figure 2 point 1 - lighting cztv - overhill lethans windy standardDrawing · PDF19 Aug 2024View
Apr 2021_fei_figure 2 point 2 - lighting cztv - overhill sanquhar 2Drawing · PDF19 Aug 2024View
Apr 2021_fei_main textReports (Public) · PDF19 Aug 2024View
Oct 2020_eia_vol ii figures 10 point 10-10 point 15Drawing · PDF19 Aug 2024View
Oct 2020_eia_vol ii figures 10 point 16-10 point 19Drawing · PDF19 Aug 2024View
Oct 2020_eia_vol ii viewpoint 1Reports (Public) · PDF19 Aug 2024View
Oct 2020_eia_vol ii viewpoint 10Reports (Public) · PDF19 Aug 2024View
Oct 2020_eia_vol ii viewpoint 11Reports (Public) · PDF19 Aug 2024View
Oct 2020_eia_vol ii viewpoint 2Reports (Public) · PDF19 Aug 2024View
Oct 2020_eia_vol ii viewpoint 3Reports (Public) · PDF19 Aug 2024View
Oct 2020_eia_vol ii viewpoint 4Reports (Public) · PDF19 Aug 2024View
Oct 2020_eia_vol ii viewpoint 5Reports (Public) · PDF19 Aug 2024View
Oct 2020_eia_vol ii viewpoint 6Reports (Public) · PDF19 Aug 2024View
Oct 2020_eia_vol ii viewpoint 7Reports (Public) · PDF19 Aug 2024View
Oct 2020_eia_vol ii viewpoint 8Reports (Public) · PDF19 Aug 2024View
Oct 2020_eia_vol ii viewpoint 9Reports (Public) · PDF19 Aug 2024View
Oct 2020_eia_vol ii viewpoints 12 - 24Reports (Public) · PDF19 Aug 2024View
Oct 2020_eia_vol iii appendicesReports (Public) · PDF19 Aug 2024View
May 2017_es_figure 6 point 10 landscape ztvDrawing · PDF16 Aug 2024View
May 2017_es_figure 6 point 11 landscape character ztvDrawing · PDF16 Aug 2024View
May 2017_es_figure 6 point 12 recreational routes ztvDrawing · PDF16 Aug 2024View
May 2017_es_figure 6 point 13 design analysis planDrawing · PDF16 Aug 2024View
May 2017_es_figure 6 point 8 ztvDrawing · PDF16 Aug 2024View
May 2017_es_figure 6 point 9 ztv to hubDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 1 point 1 location planDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 1 point 2 proposed turbine layoutDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 3 point 1 proposed site layoutDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 3 point 10 typical substation elevationsDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 3 point 11 typical substation roof and floor planDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 3 point 2 typical turbine elevationDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 3 point 3 typical turbine foundationsDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 3 point 4 typical track cross sectionsDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 3 point 5 typical watercourse crossingDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 3 point 6 site establishment compoundDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 3 point 7 typical construction compoundDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 3 point 8 typical crane hardstandingDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 3 point 9 typical trench designDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 4 point 1 site selection criteriaDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 4 point 2 first layout iterationDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 4 point 3 second layout iterationDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 4 point 4 third layout iterationDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 4 point 5 fourth layout iterationDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 4 point 6 fifth layout iterationDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 6 point 13b-g design wirelinesDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 6 point 14 ztvDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 6 point 15 ztvDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 7 point 1Drawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 7 point 2Drawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 7 point 3 - 7 point 9 cumulative visualisationsDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 8 point 1 ds 20kDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 8 point 10 raptors_2015Drawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 8 point 11 waders br2014Drawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 8 point 12 waders br2015Drawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 8 point 13 winteractivity_nbr2013_2014Drawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 8 point 14 winteractivity_nbr2014_2015Drawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 8 point 15 cumulativesitesDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 8 point 2 sb saDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 8 point 3 vp vsDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 8 point 4 vp nbr2013_2014Drawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 8 point 5 vp br2014Drawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 8 point 6 vp nbr2014_2015Drawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 8 point 7 vp br2015Drawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 8 point 8 vp br2016Drawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 9 point 1 dsDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 9 point 2 p1 habitatsDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 9 point 4 gwdte habitatsDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 9 point 5 annex1 habitatsDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 9 point 6 psDrawing · PDF16 Aug 2024View
May 2017-es vol i main textReports (Public) · PDF16 Aug 2024View
May 2017-es-figure 6 point 1 site locationDrawing · PDF16 Aug 2024View
May 2017-es-figure 6 point 2 landscape designationsDrawing · PDF16 Aug 2024View
May 2017-es-figure 6 point 3 local landscape designationsDrawing · PDF16 Aug 2024View
May 2017-es-figure 6 point 4 local landscape characterDrawing · PDF16 Aug 2024View
May 2017-es-figure 6 point 5 local landscape characterDrawing · PDF16 Aug 2024View
May 2017-es-figure 6 point 6 ztvDrawing · PDF16 Aug 2024View
May 2017-es-figure 6 point 7 ztvDrawing · PDF16 Aug 2024View
-may 2017-es-vol ii back coverReports (Public) · PDF16 Aug 2024View
-may 2017-es-vol ii contentsReports (Public) · PDF16 Aug 2024View
-may 2017-es-vol ii front coverReports (Public) · PDF16 Aug 2024View
Application pdfApplication Form · PDF16 Aug 2024View
_may 2017_es_vol iii back coverReports (Public) · PDF16 Aug 2024View
_may 2017_es_vol iii contentsReports (Public) · PDF16 Aug 2024View
_may 2017_es_vol iii front coverReports (Public) · PDF16 Aug 2024View
May 2017_es_vol ii figure 10 point 1 noise assessment location and predictionsDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 11 point 1 study areaDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 11 point 2 atc locationsDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 12 point 1 dlDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 12 point 2 hcDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 12 point 3 dtmDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 12 point 4 point 1 br_bgsDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 12 point 4 point 2_s_bgsDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 12 point 5 wcDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 12 point 6 pwsDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 12 point 7 gwdteDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 12 point 8 p2 peat samplesDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 12 point 9 peat p2Drawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 13 point 1 forestry study areaDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 13 point 2 baseline species planDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 13 point 3 wind farm felling planDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 13 point 4 wind farm restock planDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 15 point 1 tv shadow areaDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 9 point 10 bat temporal activity pie 2016Drawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 9 point 11 hmpDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 9 point 7 bat survey locationsDrawing · PDF16 Aug 2024View
May 2017_es_vol ii figure 9 point 8 bat spatialactivity_2014Drawing · PDF16 Aug 2024View
May 2017_es_vol iii appendix 1 point 1 scoping reportReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 1 point 2 east ayrshire council scoping responseReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 1 point 3 consultee responsesReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 3 point 1 over hill carbon calculatorReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 3 point 2 report on decommissioning and restorationReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6a clvia figure 01aReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6a clvia figure 01bReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6a clvia figure 02aReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6a clvia figure 02bReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6a clvia figure 03aReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6a clvia figure 03bReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6a clvia figure 04Reports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6a_aReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6a_bReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6a_cReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6a_dReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6a_eReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6a_fReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6a_gReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6a_hReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6a_iReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6a_jReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6a_kReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6b cumulative vp10Reports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6b cumulative vp11Reports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6b cumulative vp17Reports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6b cumulative vp18Reports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6b cumulative vp7Reports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6c rvaaReports (Public) · PDF16 Aug 2024View
March 2018_fei vol i main textReports (Public) · PDF16 Aug 2024View
March 2018_fei_figure 2 point 1 constraints and layout planDrawing · PDF16 Aug 2024View
March 2018_fei_figure 3 point 1 turbine and infrastucture layout planDrawing · PDF16 Aug 2024View
March 2018_fei_figure 4 point 1 proposed layoutDrawing · PDF16 Aug 2024View
March 2018_fei_figure 4 point 2 study areaDrawing · PDF16 Aug 2024View
March 2018_fei_figure 4 point 3 dtmDrawing · PDF16 Aug 2024View
March 2018_fei_figure 4 point 4 point 1 bedrock geologyDrawing · PDF16 Aug 2024View
March 2018_fei_figure 4 point 4 point 2 superficial depositsDrawing · PDF16 Aug 2024View
March 2018_fei_figure 4 point 5 watercourse buffersDrawing · PDF16 Aug 2024View
March 2018_fei_figure 4 point 6 pwsDrawing · PDF16 Aug 2024View
March 2018_fei_figure 4 point 7 gwdteDrawing · PDF16 Aug 2024View
March 2018_fei_figure 4 point 8 peat probing locationsDrawing · PDF16 Aug 2024View
March 2018_fei_figure 4 point 9 peat depthDrawing · PDF16 Aug 2024View
March 2018_fei_figure 5 point 2 restock planDrawing · PDF16 Aug 2024View
March 2018_fei_figure 5 point 3 compensatory plantingDrawing · PDF16 Aug 2024View
March 2018_fei_figure 5 point1 felling planDrawing · PDF16 Aug 2024View
March 2018_fei_figure 6 point 1 designated sitesDrawing · PDF16 Aug 2024View
March 2018_fei_figure 6 point 2 habitat survey resultsDrawing · PDF16 Aug 2024View
May 2017_es_vol iii appendix 10 point 1 noise and vibrationReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 11 point 1 abnormal loads assessmentReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 12 point 1 water crossingsReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 12 point 2 pwsReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 12 point 3 gwdteReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 12 point 4 peat depth and coring surveyReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 12 point 5 dpmpReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 12 point 6 plhraReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 12 point 7 borrow pit assessmentReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 12 point 8 cmraReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 14 point 1 contractor procurement policyReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 14 point 2 shared ownership ccReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 16 point 1 over hill conditionsReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6c_rvaa aReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6c_rvaa abReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6c_rvaa acReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6c_rvaa figures 01Reports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6c_rvaa figures 02Reports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6d methodologyReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6d vp1Reports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6d vp10Reports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6d vp11Reports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6d vp12Reports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6d vp13Reports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6d vp14Reports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6d vp15Reports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6d vp16Reports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6d vp17Reports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6d vp18Reports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6d vp19Reports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6d vp2Reports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6d vp20Reports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6d vp21Reports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6d vp22Reports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6d vp23Reports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6d vp3Reports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6d vp4Reports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6d vp5Reports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6d vp6Reports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6d vp7Reports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6d vp8Reports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6d vp9Reports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6e lct sensitivityReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6f vpt assessReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 6g clviaReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 7 point 1-7 point 2Reports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 8 point 1 annex aReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 8 point 1 annex bReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 8 point 1 annex cReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 8 point 1 annex dReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 8 point 1 annex eReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 8 point 1 ornithologyReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 9 point 1 nvc survey reportReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 9 point 2 protected speciesReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 9 point 3 bat tech appendixReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 9 point 4 bat survey at heightReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 9 point 5 bat 2016 survey reportReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 9 point 6 ecological appraisalReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 9 point 7 species protection planReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iii appendix 9 point 8 ohmrpReports (Public) · PDF16 Aug 2024View
May 2017_es_vol iv non technical summaryReports (Public) · PDF16 Aug 2024View
_march 2018_fei_vol ii lvia figures back coverReports (Public) · PDF16 Aug 2024View
_march 2018_fei_vol ii lvia figures contentsReports (Public) · PDF16 Aug 2024View
_march 2018_fei_vol ii lvia figures front coverReports (Public) · PDF16 Aug 2024View
March 2018_fei_figure 6 point 11 outline hmpDrawing · PDF16 Aug 2024View
March 2018_fei_figure 6 point 12 ornithological designated sitesDrawing · PDF16 Aug 2024View
March 2018_fei_figure 6 point 13 study areasDrawing · PDF16 Aug 2024View
March 2018_fei_figure 6 point 3a nvc habitatsDrawing · PDF16 Aug 2024View
March 2018_fei_figure 6 point 3b nvc habitatsDrawing · PDF16 Aug 2024View
March 2018_fei_figure 6 point 3c nvc habitatsDrawing · PDF16 Aug 2024View
March 2018_fei_figure 6 point 3d nvc habitatsDrawing · PDF16 Aug 2024View
March 2018_fei_figure 6 point 3e nvc habitatsDrawing · PDF16 Aug 2024View
March 2018_fei_figure 6 point 4a gwdte surveyDrawing · PDF16 Aug 2024View
March 2018_fei_figure 6 point 4b gwdte surveyDrawing · PDF16 Aug 2024View
March 2018_fei_figure 6 point 4c gwdte surveyDrawing · PDF16 Aug 2024View
March 2018_fei_figure 6 point 4d gwdte surveyDrawing · PDF16 Aug 2024View
March 2018_fei_figure 6 point 4e gwdte surveyDrawing · PDF16 Aug 2024View
March 2018_fei_figure 6 point 5a annex 1 habitatsDrawing · PDF16 Aug 2024View
March 2018_fei_figure 6 point 5b annex 1 habitatsDrawing · PDF16 Aug 2024View
March 2018_fei_figure 6 point 5c annex 1 habitatsDrawing · PDF16 Aug 2024View
March 2018_fei_figure 6 point 5d annex 1 habitatsDrawing · PDF16 Aug 2024View
March 2018_fei_figure 6 point 5e annex 1 habitatsDrawing · PDF16 Aug 2024View
March 2018_fei_figure 8 point 1 archaeological constraintsDrawing · PDF16 Aug 2024View
March 2018_fei_figure 9 point 1 mining constraintsDrawing · PDF16 Aug 2024View
March 2018_fei_vol ii lvia figure 10 point 1 location planDrawing · PDF16 Aug 2024View
March 2018_fei_vol ii lvia figure 10 point 10 comparative ztv 35kmDrawing · PDF16 Aug 2024View
March 2018_fei_vol ii lvia figure 10 point 11 comparative ztv 15kmDrawing · PDF16 Aug 2024View
March 2018_fei_vol ii lvia figure 10 point 2 landscape designationsDrawing · PDF16 Aug 2024View
March 2018_fei_vol ii lvia figure 10 point 3 local landscape designationsDrawing · PDF16 Aug 2024View
March 2018_fei_vol ii lvia figure 10 point 4 landscape characterDrawing · PDF16 Aug 2024View
March 2018_fei_vol ii lvia figure 10 point 5 local landscape characterDrawing · PDF16 Aug 2024View
March 2018_fei_vol ii lvia figure 10 point 6 ztv to tip 35kmDrawing · PDF16 Aug 2024View
March 2018_fei_vol ii lvia figure 10 point 7 ztv to hub 35kmDrawing · PDF16 Aug 2024View
March 2018_fei_vol ii lvia figure 10 point 8 ztv to tip 15kmDrawing · PDF16 Aug 2024View
March 2018_fei_vol ii lvia figure 10 point 9 ztv to hub 15kmDrawing · PDF16 Aug 2024View
_march 2018_fei_vol iii appendix 3 point 1 carbon calculatorReports (Public) · PDF16 Aug 2024View
_march 2018_fei_vol iii contentsReports (Public) · PDF16 Aug 2024View
_march 2018_fei_vol iii front coverReports (Public) · PDF16 Aug 2024View
_oct 2020_eia_vol ii contentsReports (Public) · PDF16 Aug 2024View
August 2018_fei_part 1 of 4Reports (Public) · PDF16 Aug 2024View
August 2018_fei_part 2 of 4Reports (Public) · PDF16 Aug 2024View
August 2018_fei_part 3 of 4Reports (Public) · PDF16 Aug 2024View
August 2018_fei_part 4 of 4Reports (Public) · PDF16 Aug 2024View
March 2018_fei_vol ii lvia figure 10 point 12 landscape designations ztvDrawing · PDF16 Aug 2024View
March 2018_fei_vol ii lvia figure 10 point 13 landscape character ztvDrawing · PDF16 Aug 2024View
March 2018_fei_vol ii lvia figure 10 point 14 recreational receptorsDrawing · PDF16 Aug 2024View
March 2018_fei_vol ii lvia figure 10 point 15 design analysis planDrawing · PDF16 Aug 2024View
March 2018_fei_vol ii lvia figure 10 point 16 ztv to tipDrawing · PDF16 Aug 2024View
March 2018_fei_vol ii lvia figure 10 point 17 ztv to tipDrawing · PDF16 Aug 2024View
March 2018_fei_vol ii lvia figures 360 degree cumulative visualisationsDrawing · PDF16 Aug 2024View
March 2018_fei_vol ii lvia figures 90 degree cumulative visualisationsDrawing · PDF16 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 1Drawing · PDF16 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 10Drawing · PDF16 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 11Drawing · PDF16 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 12Drawing · PDF16 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 13Drawing · PDF16 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 14Drawing · PDF16 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 15Drawing · PDF16 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 16Drawing · PDF16 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 17Drawing · PDF16 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 18Drawing · PDF16 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 19Drawing · PDF16 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 2Drawing · PDF16 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 20Drawing · PDF16 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 21Drawing · PDF16 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 22Drawing · PDF16 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 23Drawing · PDF16 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 3Drawing · PDF16 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 4Drawing · PDF16 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 5Drawing · PDF16 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 6Drawing · PDF16 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 7Drawing · PDF16 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 8Drawing · PDF16 Aug 2024View
March 2018_fei_vol ii lvia figures viewpoint 9Drawing · PDF16 Aug 2024View
March 2018_fei_vol iii appendix point 1 carbon calculatorReports (Public) · PDF16 Aug 2024View
March 2018_fei_vol iii appendix 10 point 1 scope of clviaReports (Public) · PDF16 Aug 2024View
March 2018_fei_vol iii appendix 11 part iReports (Public) · PDF16 Aug 2024View
March 2018_fei_vol iii appendix 11 part iiReports (Public) · PDF16 Aug 2024View
March 2018_fei_vol iii appendix 11 part iiiReports (Public) · PDF16 Aug 2024View
March 2018_fei_vol iii appendix 12 part iReports (Public) · PDF16 Aug 2024View
March 2018_fei_vol iii appendix 12 part iiReports (Public) · PDF16 Aug 2024View
March 2018_fei_vol iii appendix 4 point 1 watercourse crossingsReports (Public) · PDF16 Aug 2024View
March 2018_fei_vol iii appendix 4 point 2 pwsReports (Public) · PDF16 Aug 2024View
March 2018_fei_vol iii appendix 4 point 3 gwdteReports (Public) · PDF16 Aug 2024View
March 2018_fei_vol iii appendix 4 point 4 part iReports (Public) · PDF16 Aug 2024View
March 2018_fei_vol iii appendix 4 point 4 part iiReports (Public) · PDF16 Aug 2024View
March 2018_fei_vol iii appendix 4 point 5 part iReports (Public) · PDF16 Aug 2024View
March 2018_fei_vol iii appendix 4 point 5 part iiReports (Public) · PDF16 Aug 2024View
March 2018_fei_vol iii appendix 4 point 5 part iiiReports (Public) · PDF16 Aug 2024View
March 2018_fei_vol iii appendix 6 point 1 part iReports (Public) · PDF16 Aug 2024View
March 2018_fei_vol iii appendix 6 point 1 part iiReports (Public) · PDF16 Aug 2024View
March 2018_fei_vol iii appendix 6 point 2 correspondenceReports (Public) · PDF16 Aug 2024View
Oct 2020_eia_vol i main textReports (Public) · PDF16 Aug 2024View
Oct 2020_eia_vol ii figures 1 point 1 - 3 point 11Drawing · PDF16 Aug 2024View
Oct 2020_eia_vol ii figures 10 point 1-10 point 4Drawing · PDF16 Aug 2024View
Oct 2020_eia_vol ii figures 10 point 5-10 point 9Drawing · PDF16 Aug 2024View
Kilmarnock standardPublic Notices · PDF22 Dec 2023View
Nnplan230624ppApplication Correspondence (Public) · PDF11 Dec 2023View
Nnlist230624ppApplication Correspondence (Public) · PDF11 Dec 2023View
Apr 2021 fei_appendix 2_1_2_5Application Correspondence (Public) · PDF6 Dec 2023View
April 2021 fei appendix 2_4 _ operational turbine lightingReports (Public) · PDF6 Dec 2023View
April 2021 fei_appendix 2_1_nightime visualisations viewpoint 7 ochiltree near tReports (Public) · PDF6 Dec 2023View
April 2021 fei_appendix 2_2_nighttime visualisations viewpoint a upper beoch_lowReports (Public) · PDF6 Dec 2023View
April 2021 fei_appendix 4_1_ carbon calculatorReports (Public) · PDF6 Dec 2023View
April 2021 fei_appendix 4_2_pre construction bat monitoring reportReports (Public) · PDF6 Dec 2023View
April 2021 fei_fei appendix 2_1_visualisationsReports (Public) · PDF6 Dec 2023View
April 2021 fei_fei appendix 2-5 - stephenson halliday review of hepla rvaaReports (Public) · PDF6 Dec 2023View
April 2021 fei_figure 2_1_lighting cztv _overhill lethans_windy standard 3Drawing · PDF6 Dec 2023View
April 2021 fei_figure 2_2_lighting cztv_overhill sanquhar 2Drawing · PDF6 Dec 2023View
April 2021 fei_overhill fei report textReports (Public) · PDF6 Dec 2023View
April 2021_fei appendix 2_3_luxsolar_datasheetReports (Public) · PDF6 Dec 2023View
Oct 2020 eia_main text volume iReports (Public) · PDF6 Dec 2023View
Oct 2020 eia_volume ii contentsReports (Public) · PDF6 Dec 2023View
Oct 2020 eia_volume ii figures 3.1 - 3.11Drawing · PDF6 Dec 2023View
Oct 2020 eia_volume ii figures 10_1 10_4Drawing · PDF6 Dec 2023View
Oct 2020 eia_volume ii figures 10_10 10_15Drawing · PDF6 Dec 2023View
Oct 2020 eia_volume ii figures 10_16 10_19Drawing · PDF6 Dec 2023View
Oct 2020 eia_volume ii figures 10_5 10_9Drawing · PDF6 Dec 2023View
Oct 2020 eia_volume ii viewpoint 1Drawing · PDF6 Dec 2023View
Oct 2020 eia_volume ii viewpoint 10Drawing · PDF6 Dec 2023View
Oct 2020 eia_volume ii viewpoint 11Drawing · PDF6 Dec 2023View
Oct 2020 eia_volume ii viewpoint 12_24Drawing · PDF6 Dec 2023View
Oct 2020 eia_volume ii viewpoint 2Drawing · PDF6 Dec 2023View
Oct 2020 eia_volume ii viewpoint 3Drawing · PDF6 Dec 2023View
Oct 2020 eia_volume ii viewpoint 4Drawing · PDF6 Dec 2023View
Oct 2020 eia_volume ii viewpoint 5Drawing · PDF6 Dec 2023View
Oct 2020 eia_volume ii viewpoint 6Drawing · PDF6 Dec 2023View
Oct 2020 eia_volume ii viewpoint 7Drawing · PDF6 Dec 2023View
Oct 2020 eia_volume ii viewpoint 8Drawing · PDF6 Dec 2023View
Oct 2020 eia_volume ii viewpoint 9Drawing · PDF6 Dec 2023View
Application pdfApplication Form · PDF6 Dec 2023View
Proposed composite plan (modular control building)Drawing · PDF6 Dec 2023View
Appendix 4-1 peat management planReports (Public) · PDF20 Nov 2023View
Appendix 5-2 noise assessmentReports (Public) · PDF20 Nov 2023View
Comparative eiar vol iReports (Public) · PDF20 Nov 2023View
Comparative wirelinesDrawing · PDF20 Nov 2023View
Eiar vol ii contentsReports (Public) · PDF20 Nov 2023View
Eiar vol iii contentsReports (Public) · PDF20 Nov 2023View
Fig 1 comparative ztv hub heightDrawing · PDF20 Nov 2023View
Figure 1-2 typical turbine elevationDrawing · PDF20 Nov 2023View
Figure 1-3 proposed layoutDrawing · PDF20 Nov 2023View
Figure 1-4 typical turbine foundationsDrawing · PDF20 Nov 2023View
Figure 1-5 typical track cross sectionDrawing · PDF20 Nov 2023View
Figure 1-6 typical watercourse crossingDrawing · PDF20 Nov 2023View
Figure 1-7 typical construction compoundDrawing · PDF20 Nov 2023View
Figure 1-8 typical crane hardstandingDrawing · PDF20 Nov 2023View
Figure 1-9 typical cable trench designDrawing · PDF20 Nov 2023View
General arrangement plan and elevationsDrawing · PDF20 Nov 2023View
Figure 1-1 site location planDrawing · PDF20 Nov 2023View
Proposed layout and elevationsDrawing · PDF20 Nov 2023View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.