Council planning record

Battery Energy Storage System (BESS) with a maximum generating capacity of 29.9MW involving the installation of up to 18 battery containers, a substation and related electrical equipment, and associated ancillary infrastructure including a new access track, existing access track improvements, surface water drainage/SUDS, acoustic fencing, perimeter fencing with lighting/CCTV, and landscape planting

Land South Of Coylton Substation A70 From B730 To U74 Bardarroch Ochiltree East Ayrshire

DecidedReference: 23/0604/PPEast Ayrshire

Last published check: 22 Sept 2026, 07:52. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  5. Last Advertised In Press Date

    Published milestoneCouncil source
  6. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Decision Issued Date

    Published milestoneCouncil source
  11. Decision Made Date

    Published milestoneCouncil source

Application summary

Status
Decided
Application type
Planning Permission
Received
9 Nov 2023
Validated
28 Nov 2023
Determination deadline
27 Mar 2024
Local authority
East Ayrshire

Application overview

Battery Energy Storage System (BESS) with a maximum generating capacity of 29.9MW involving the installation of up to 18 battery containers, a substation and related electrical equipment, and associated ancillary infrastructure including a new access track, existing access track improvements, surface water drainage/SUDS, acoustic fencing, perimeter fencing with lighting/CCTV, and landscape planting

Proposal details

Reference
23/0604/PP
Alternative references
100649412-001
Agent
Savills

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Land South Of Coylton Substation A70 From B730 To U74 Bardarroch Ochiltree East Ayrshire

This record has no verified map location.

View council map

Documents 66 of 66

DocumentPublishedAction
Committee reportReports (Public) · PDF6 Mar 2025View
Approved with conditionsDecision Notices · PDF4 Mar 2025View
Site photosPhoto22 Dec 2023View
Site photosPhoto22 Dec 2023View
Site photosPhoto22 Dec 2023View
Site photosPhoto22 Dec 2023View
Site photosPhoto22 Dec 2023View
Site photosPhoto22 Dec 2023View
Site photosPhoto22 Dec 2023View
Kilmarnock standardPublic Notices · PDF15 Dec 2023View
Rural location planDrawing · PDF28 Nov 2023View
Approved ga and levels layoutDrawing · PDF9 Nov 2023View
Approved swept path analysisDrawing · PDF9 Nov 2023View
Approved drainage layoutDrawing · PDF9 Nov 2023View
Aerial planDrawing · PDF9 Nov 2023View
Approved proposed composite plan (battery container)Drawing · PDF9 Nov 2023View
Approved proposed composite plan (battery inverter transformer)Drawing · PDF9 Nov 2023View
Approved proposed composite plan (cctv lighting)Drawing · PDF9 Nov 2023View
Approved cultural heritage desk based assessmentReports (Public) · PDF9 Nov 2023View
Approved geo-environmental desk study rev 2Reports (Public) · PDF9 Nov 2023View
Approved proposed composite plan (dno room)Drawing · PDF9 Nov 2023View
Approved drainage strategy reportReports (Public) · PDF9 Nov 2023View
Approved existing planDrawing · PDF9 Nov 2023View
Approved existing topo planDrawing · PDF9 Nov 2023View
Approved landscape and visual impact assessmentReports (Public) · PDF9 Nov 2023View
Approved location planDrawing · PDF9 Nov 2023View
Approved lvia figure 1 - study area with ztvDrawing · PDF9 Nov 2023View
Approved lvia figure 2 - landscape character and designations with ztvDrawing · PDF9 Nov 2023View
Approved lvia figure 3 - visual receptors with ztvDrawing · PDF9 Nov 2023View
Approved lvia figure 4 - cumulative baseline with ztvDrawing · PDF9 Nov 2023View
Approved lvia figure 5 - landscape mitigation planDrawing · PDF9 Nov 2023View
Approved lvia figure 6 - visualisation location with ztvDrawing · PDF9 Nov 2023View
Approved lvia figure 7(a-e) - visualisation location 1Drawing · PDF9 Nov 2023View
Approved lvia figure 8(a-e) - visualisation location 2Drawing · PDF9 Nov 2023View
Approved noise impact assessmentReports (Public) · PDF9 Nov 2023View
Approved outline fire safety management planReports (Public) · PDF9 Nov 2023View
Pac report - appendix 1Reports (Public) · PDF9 Nov 2023View
Pac report - appendix 10Reports (Public) · PDF9 Nov 2023View
Pac report - appendix 11Reports (Public) · PDF9 Nov 2023View
Pac report - appendix 12Reports (Public) · PDF9 Nov 2023View
Pac report - appendix 2Reports (Public) · PDF9 Nov 2023View
Pac report - appendix 3Reports (Public) · PDF9 Nov 2023View
Pac report - appendix 4Reports (Public) · PDF9 Nov 2023View
Pac report - appendix 5Reports (Public) · PDF9 Nov 2023View
Pac report - appendix 6Reports (Public) · PDF9 Nov 2023View
Pac report - appendix 7Reports (Public) · PDF9 Nov 2023View
Pac report - appendix 8Reports (Public) · PDF9 Nov 2023View
Pac report - appendix 9Reports (Public) · PDF9 Nov 2023View
Pac reportReports (Public) · PDF9 Nov 2023View
Approved proposed composite plan (paladin fence)Drawing · PDF9 Nov 2023View
Peat survey reportReports (Public) · PDF9 Nov 2023View
Planning design and access statementReports (Public) · PDF9 Nov 2023View
Application pdfApplication Form · PDF9 Nov 2023View
Approved proposed composite plan plan (private substation)Drawing · PDF9 Nov 2023View
Private water supply risk assessment - part 1Reports (Public) · PDF9 Nov 2023View
Private water supply risk assessment - part 2Reports (Public) · PDF9 Nov 2023View
Approved proposed composite plan (access gate)Drawing · PDF9 Nov 2023View
Approved proposed composite plan (acoustic fence)Drawing · PDF9 Nov 2023View
Approved proposed elevations aa-ddDrawing · PDF9 Nov 2023View
Approved proposed plan (1:1250)Drawing · PDF9 Nov 2023View
Approved proposed plan (1:500)Drawing · PDF9 Nov 2023View
Approved proposed composite plan (storage room)Drawing · PDF9 Nov 2023View
Proposed composite plan (transformer)Drawing · PDF9 Nov 2023View
Approved transport statement and ctmpReports (Public) · PDF9 Nov 2023View
Approved utilities planDrawing · PDF9 Nov 2023View
Approved proposed composite plan (welfare control room)Drawing · PDF9 Nov 2023View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Approved with Conditions
Approved with conditions
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.