Council planning record

Request for Scoping Opinion for proposed Section 36 application

Haghsaw Energy Cluster - Western Expansion

DecidedReference: 22/0003/S36SCPEast Ayrshire

Last published check: 29 Sept 2026, 02:24. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Decision Made Date

    Published milestoneCouncil source
  5. Decision Issued Date

    Published milestoneCouncil source
  6. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided
Application type
Section 36 Scoping
Received
4 Oct 2022
Validated
4 Oct 2022
Determination deadline
3 Dec 2022
Local authority
East Ayrshire

Application overview

Request for Scoping Opinion for proposed Section 36 application

Proposal details

Reference
22/0003/S36SCP
Ward
Cumnock And New Cumnock

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Haghsaw Energy Cluster - Western Expansion

This record has no verified map location.

View council map

Documents 26 of 26

DocumentPublishedAction
Consultation response (wosas)Consultations (Public) · PDF8 Dec 2022View
Consultation response (nature scotland)Consultations (Public) · PDF15 Nov 2022View
Eac s36 scoping consultation responseApplication Correspondence (Public)26 Oct 2022View
Response (reg. services)Consultations (Public) · PDF25 Oct 2022View
Hecwe scoping report: figure 1.1 site location planDrawing · PDF10 Oct 2022View
Hecwe scoping report: figure 2.1 cumulative developmentsDrawing · PDF10 Oct 2022View
Hecwe scoping report: figure 3.1 environmental designations within 5kmDrawing · PDF10 Oct 2022View
Hecwe scoping report: figure 3.2 indicative proposed development layoutDrawing · PDF10 Oct 2022View
Hecwe scoping report: figure 3.3 indicative proposed development layoutDrawing · PDF10 Oct 2022View
Hecwe scoping report: figure 5.1 blade tip zone of theoretical visibility to 35Drawing · PDF10 Oct 2022View
Hecwe scoping report: figure 5.2 landscape designations within 20 km with viewpoDrawing · PDF10 Oct 2022View
Hecwe scoping report: figure 5.3 other wind farms within 20 kmDrawing · PDF10 Oct 2022View
Hecwe scoping report: figure 6.1 habitats and protected mammals survey areasDrawing · PDF10 Oct 2022View
Hecwe scoping report: figure 7.1 ornithology study areasDrawing · PDF10 Oct 2022View
Hecwe scoping report: figure 7.2 vp locations and viewshedsDrawing · PDF10 Oct 2022View
Hecwe_scoping report_figure 8.1 35 dbla90 contour and noise sensitive receptorsDrawing · PDF10 Oct 2022View
Hecwe scoping report: figure 9.1 cultural heritage: inner study areaDrawing · PDF10 Oct 2022View
Hecwe scoping report: figure 9.2 cultural heritage: outer study areaDrawing · PDF10 Oct 2022View
Hecwe scoping report: figure 10.1 coal development high risk area & gcrDrawing · PDF10 Oct 2022View
Hecwe scoping report: figure 10.2 superficial geologyDrawing · PDF10 Oct 2022View
Hecwe scoping report: figure 10.3 peat classificationDrawing · PDF10 Oct 2022View
Hecwe scoping report: figure 10.4 peat depthsDrawing · PDF10 Oct 2022View
Hecwe scoping report: figure 10.5a bedrock geology and faultsDrawing · PDF10 Oct 2022View
Hecwe scoping report: figure 10.5b key: bedrock geology and faultsDrawing · PDF10 Oct 2022View
Hecwe scoping report: figure 10.6 watercourses and waterbodiesDrawing · PDF10 Oct 2022View
Hecwe scoping reportReports (Public) · PDF10 Oct 2022View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Scope agreed
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.