Council planning record

Application for Section 36 Consent for Lethans Wind Farm Extension.

Lethans U716 Craigshiel From C47 Mansfield Road To Corsencon Hill New Cumnock East Ayrshire

Awaiting decisionReference: 22/0001/S36East Ayrshire

Application location

Lethans U716 Craigshiel From C47 Mansfield Road To Corsencon Hill New Cumnock East Ayrshire

This record has no verified map location.

View council map

Application summary

Status
Awaiting decision
Application type
Section 36
Received
10 Jan 2022
Validated
21 Feb 2022
Determination deadline
20 Apr 2022
Local authority
East Ayrshire

Application overview

Application for Section 36 Consent for Lethans Wind Farm Extension.

Proposal details

Reference
22/0001/S36
Alternative references
22/0001/S36
Ward
Cumnock And New Cumnock
Agent
Jill Lomax Banks Group

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 212 of 212

DocumentPublishedAction
Response (ayrshire rivers trust)Consultations (Public) · PDF20 Dec 2024View
Scottish ministers' decision letterReports (Public) · PDF8 Aug 2024View
Scottish ministers' decision letter annex 3 site layoutReports (Public) · PDF8 Aug 2024View
Scottish ministers' decision letter annex 4 appropriate assessmentReports (Public) · PDF8 Aug 2024View
Naturescots commentsConsultations (Public)20 Jul 2022View
E-mail from ecu with extrnsion of timeApplication Correspondence (Public)14 Jul 2022View
E-mail from ecu re extension of timeApplication Correspondence (Public)4 Jul 2022View
Consultation response (wsas)Consultations (Public) · PDF17 Mar 2022View
E-mail from ecu with sepa consultation responseApplication Correspondence (Public)4 Mar 2022View
Volume 2 - part a - blade tip ztv to 20km with viewpointsDrawing · PDF22 Feb 2022View
Volume 2 - part a - fig 4-18 hub height ztv to 45km with viewpointsDrawing · PDF22 Feb 2022View
Volume 2 - part a - fig 4-19 hub height ztv to 45km with viewpoints - ne quadranDrawing · PDF22 Feb 2022View
Volume 2 - part a - fig 4-20 hub height ztv to 45km with viewpoints - se quadranDrawing · PDF22 Feb 2022View
Volume 2 - part a - fig 4-21 hub height ztv to 45km with viewpoints - nw quadranDrawing · PDF22 Feb 2022View
Volume 2 - part a - fig 4-22 hub height ztv to 45km with viewpoints - sw quadranDrawing · PDF22 Feb 2022View
Volume 2 - part a - fig 4-23 hub height ztv to 20km with viewpointsDrawing · PDF22 Feb 2022View
Volume 2 - part a - fig 4-24 landscape designations within 20km with blade tip zDrawing · PDF22 Feb 2022View
Volume 2 - part a - fig 4-25 landscape character types local authority within 20Drawing · PDF22 Feb 2022View
Volume 2 - part a - fig 4-26 landscape character types snh within 20km with bladDrawing · PDF22 Feb 2022View
Volume 2 - part a - fig 4-27 principle visual receptors to 20km with ztv and vieDrawing · PDF22 Feb 2022View
Volume 2 - part a - fig 4-28 ctzv to 45km operational schemes north of siteDrawing · PDF22 Feb 2022View
Volume 2 - part a - fig 4-29 ctzv to 45km operational schemes south of siteDrawing · PDF22 Feb 2022View
Volume 2 - part a - fig 4-30 ctzv to 45km consented schemes north of siteDrawing · PDF22 Feb 2022View
Volume 2 - part a - fig 4-31 ctzv to 45km consented schemes south of siteDrawing · PDF22 Feb 2022View
Volume 2 - part a - fig 4-32 cztv to 45km in planning schemes north of siteDrawing · PDF22 Feb 2022View
Volume 2 - part a - fig 4-33 cztv to 45km in planning schemes south of siteDrawing · PDF22 Feb 2022View
Volume 2 - part a - fig 4-34 ctzv to 45km consented lethans and lethans extensioDrawing · PDF22 Feb 2022View
Volume 2 - part b - fig 4-35 vp1 b743 east of nethershieldDrawing · PDF22 Feb 2022View
Volume 2 - part b - fig 4-36 vp2 b705 auchlinleckDrawing · PDF22 Feb 2022View
Volume 2 - part b - fig 4-37 vp3 a70 north east of cumnockDrawing · PDF22 Feb 2022View
Volume 2 - part b - fig 4-38 vp4 glenmuir water roadDrawing · PDF22 Feb 2022View
Volume 2 - part b - fig 4-39 vp5 kyle castleDrawing · PDF22 Feb 2022View
Volume 2 - part b - fig 4-40 vp6 boig road glaisnock road junction - core pathDrawing · PDF22 Feb 2022View
Volume 2 - part b - fig 4-41 vp7 a76 new cumnockDrawing · PDF22 Feb 2022View
Volume 2 - part b - fig 4-42 vp8 blackcraig hillDrawing · PDF22 Feb 2022View
Volume 2 - part b - fig 4-43 vp9 west of rigg farmDrawing · PDF22 Feb 2022View
Volume 2 - part b - fig 4-44 vp10 librymoor plantation - new cumnock path networDrawing · PDF22 Feb 2022View
Volume 2 - part b - fig 4-45 vp11 a76 kirkconnelDrawing · PDF22 Feb 2022View
Volume 2 - part b - fig 4-46 vp12 todholes hillDrawing · PDF22 Feb 2022View
Volume 2 - part b - fig 4-47 vp13 cairn kinneyDrawing · PDF22 Feb 2022View
Volume 2 - part b - fig 4-48 vp14 cairn table hillDrawing · PDF22 Feb 2022View
Volume 2 - part b - fig 4-49 vp15 a76 between kirkconnel and sanquharDrawing · PDF22 Feb 2022View
Volume 2 - part b - fig 4-50 vp16 whing head - southern upland wayDrawing · PDF22 Feb 2022View
Volume 2 - part b - fig 4-51 vp17 b741 boig road junctionDrawing · PDF22 Feb 2022View
Volume 2 - part b - fig 4-52 vp18 dalleaglesDrawing · PDF22 Feb 2022View
Volume 2 - part b - fig 4-53 vp19 high park farm new cumnockDrawing · PDF22 Feb 2022View
Volume 2 - part b - fig 4-54 vp20 wellwood street muikirkDrawing · PDF22 Feb 2022View
Volume 2 - part b - fig 4-55 vp21 lowther hillDrawing · PDF22 Feb 2022View
Volume 2 - part b - fig 4-56 vp22 ryehill motte - sm708Drawing · PDF22 Feb 2022View
Volume 2 - part b - fig 4-57 vp4 dark - glenmuir water roadDrawing · PDF22 Feb 2022View
Volume 2 - part b - fig 4-58 vp7 dark - a76 new cumnockDrawing · PDF22 Feb 2022View
Volume 2 - part b - fig 4-59 vp9 dark - a76 west of rigg farmDrawing · PDF22 Feb 2022View
Volume 2 - part b - fig 4-60 vp19 dark - high park farm new cumnockDrawing · PDF22 Feb 2022View
Volume 2 - part b - fig 8-1 dumfries house gdlDrawing · PDF22 Feb 2022View
Volume 2 - part b - fig 8-10 auchensaugh hill cairn - sm4234Drawing · PDF22 Feb 2022View
Volume 2 - part b - fig 8-2 kemps castle - fort 320m sw of euchan bridgeDrawing · PDF22 Feb 2022View
Volume 2 - part b - fig 8-3 connor hill enclosureDrawing · PDF22 Feb 2022View
Volume 2 - part b - fig 8-4 sanquhar conservationDrawing · PDF22 Feb 2022View
Volume 2 - part b - fig 8-5 kyle castleDrawing · PDF22 Feb 2022View
Volume 2 - part b - fig 8-6 cairn kinneyDrawing · PDF22 Feb 2022View
Volume 2 - part b - fig 8-7 cairn tableDrawing · PDF22 Feb 2022View
Volume 2 - part b - fig 8-8 crichton peel and sanquhar castle - sm687Drawing · PDF22 Feb 2022View
Volume 2 - part b - fig 8-9 ryehill motte - sm708Drawing · PDF22 Feb 2022View
Volume 2 - part b - ta4-7 fig 1 glenmuir water roadDrawing · PDF22 Feb 2022View
Volume 2 - part b - ta4-7 fig 2 a76 west of rigg farmDrawing · PDF22 Feb 2022View
Volume 2 - part b - ta4-7 fig 3 todholes hillDrawing · PDF22 Feb 2022View
Volume 2 - part b - ta4-7 fig 4 cairn table hillDrawing · PDF22 Feb 2022View
Volume 2 - part b - ta4-7 fig 5 high park farm new cumnockDrawing · PDF22 Feb 2022View
Volume 1 - appendices listReports (Public) · PDF21 Feb 2022View
Volume 1 - drawings listReports (Public) · PDF21 Feb 2022View
Volume 1 - eiar - chapter 1 introductionReports (Public) · PDF21 Feb 2022View
Volume 1 - eiar - chapter 10 ground conditions and hydrologyReports (Public) · PDF21 Feb 2022View
Volume 1 - eiar - chapter 11 tourism access and recreationReports (Public) · PDF21 Feb 2022View
Volume 1 - eiar - chapter 12 other effectsReports (Public) · PDF21 Feb 2022View
Volume 1 - chapter 13 synergistic effects mitigation residual effects and concluReports (Public) · PDF21 Feb 2022View
Volume 1 - eiar - chapter 2 proposed developmentReports (Public) · PDF21 Feb 2022View
Volume 1 - eiar - chapter 3 site selection design iteration and consideration ofReports (Public) · PDF21 Feb 2022View
Volume 1 - eiar - chapter 4 landscape and visual impactReports (Public) · PDF21 Feb 2022View
Volume 1 - eiar - chapter 5 ornithologyReports (Public) · PDF21 Feb 2022View
Volume 1 - eiar - chapter 7 noiseReports (Public) · PDF21 Feb 2022View
Volume 1 - eiar - chapter 8 cultural heritage and archaeologyReports (Public) · PDF21 Feb 2022View
Volume 1 - eiar - chapter 9 traffic and transportationReports (Public) · PDF21 Feb 2022View
Volume 1 - eiar - prefaceReports (Public) · PDF21 Feb 2022View
Volume 1 - eiar01 typical wind turbine specificationDrawing · PDF21 Feb 2022View
Volume 1 - eiar02 typical turbine foundationDrawing · PDF21 Feb 2022View
Volume 1 - eiar03 indicative crane pad designDrawing · PDF21 Feb 2022View
Volume 1 - eiar04 access optionsDrawing · PDF21 Feb 2022View
Volume 1 - indicative track design cross sectionDrawing · PDF21 Feb 2022View
Volume 1 - eiar06 indicative water crossing detailDrawing · PDF21 Feb 2022View
Volume 1 - eiar07 indicative batching plantDrawing · PDF21 Feb 2022View
Volume 1 - eiar08 typical borrow pitDrawing · PDF21 Feb 2022View
Volume 1 - eiar09 indicative control building and substation layoutDrawing · PDF21 Feb 2022View
Volume 1 - eiar10 indicative construction compoundDrawing · PDF21 Feb 2022View
Volume 1 - eiar11 typical wind monitoring mastDrawing · PDF21 Feb 2022View
Volume 1 - eiar12 indicative cable trench installation detailsDrawing · PDF21 Feb 2022View
Volume 1 - eiar13 socioeconomics infographicDrawing · PDF21 Feb 2022View
Volume 1 - eiar14 layout evolutionDrawing · PDF21 Feb 2022View
Volume 1 - eiar15 site constraints planDrawing · PDF21 Feb 2022View
Volume 1 - eiar16 existing features planDrawing · PDF21 Feb 2022View
Volume 1 - eiar17 draft habitat management planDrawing · PDF21 Feb 2022View
Volume 1 - eiar18 ornithological featuresDrawing · PDF21 Feb 2022View
Volume 1 - eiar19 ecological designationsDrawing · PDF21 Feb 2022View
Volume 1 - eiar20 noise assessment locationsDrawing · PDF21 Feb 2022View
Volume 1 - eiar21 heritage assets considered within the eiarDrawing · PDF21 Feb 2022View
Volume 1 - eiar22 traffic counter locationsDrawing · PDF21 Feb 2022View
Volume 1 - eiar23 abnormal loads routeDrawing · PDF21 Feb 2022View
Volume 1 - eiar24 shadow flicker study areaDrawing · PDF21 Feb 2022View
Volume 1 - eiar25 indicative grid connection corridorDrawing · PDF21 Feb 2022View
Volume 1 - eiar - non technical summaryReports (Public) · PDF21 Feb 2022View
Volume 1 - pa01 location planDrawing · PDF21 Feb 2022View
Volume 1 pa02 application boundaryDrawing · PDF21 Feb 2022View
Volume 1 - pa03 site layout plan - construction layoutDrawing · PDF21 Feb 2022View
Volume 1 - pa04 site layout plan - operational layoutDrawing · PDF21 Feb 2022View
Volume 1 - pa05 micrositing planDrawing · PDF21 Feb 2022View
Planning statementReports (Public) · PDF21 Feb 2022View
Application formApplication Form · PDF21 Feb 2022View
Volume 1 - ta 6-1 ecological impact assessmentReports (Public) · PDF21 Feb 2022View
Volume 1 - ta fig 5-1a vantagepoint viewsheds 2013-2015Drawing · PDF21 Feb 2022View
Volume 1 - ta fig 5-1b raptors flight activity 2013-2015Drawing · PDF21 Feb 2022View
Volume 1 - ta fig 5-1c other species flight activity 2013-2015Drawing · PDF21 Feb 2022View
Volume 1 - ta fig 5-2a vantage point viewsheds 2019-2020Drawing · PDF21 Feb 2022View
Volume 1 - ta fig 5-2b raptors flight activity 2019-2020Drawing · PDF21 Feb 2022View
Volume 1 - ta fig 5-2c other species flight activity 2019-2020Drawing · PDF21 Feb 2022View
Volume 1 - ta fig 6-2 nvc assessed valuesDrawing · PDF21 Feb 2022View
Volume 1 - ta fig 6-3 gwdtesDrawing · PDF21 Feb 2022View
Volume 1 - ta1-1 ecu application checklistReports (Public) · PDF21 Feb 2022View
Volume 1 - ta2-1 draft construction method statementReports (Public) · PDF21 Feb 2022View
Volume 1 - ta2-2 draft environmental management planReports (Public) · PDF21 Feb 2022View
Volume 1 - ta2-4 connect2renewables charterReports (Public) · PDF21 Feb 2022View
Volume 1 - ta4-1 lvia assessment criteriaReports (Public) · PDF21 Feb 2022View
Volume 1 - ta4-2 information to be read in conjunction with ztvs and visualisatiReports (Public) · PDF21 Feb 2022View
Volume 1 - ta4-3 viewpoint assessmentReports (Public) · PDF21 Feb 2022View
Volume 1 - ta4-4 annex 1 property locationsDrawing · PDF21 Feb 2022View
Volume 1 - ta4-4 annex 2 angle of viewDrawing · PDF21 Feb 2022View
Volume 1 - ta4-4 annex 3 property 1 glenwharrieDrawing · PDF21 Feb 2022View
Volume 1 - ta4-4 annex 4 property 2 vennelDrawing · PDF21 Feb 2022View
Volume 1 - ta4-4 annex 5 property 3 kirkland farmDrawing · PDF21 Feb 2022View
Volume 1 - ta4-4 annex 6 property 4 old kirkland cottageDrawing · PDF21 Feb 2022View
Volume 1 - ta4-4 annex 7 property 5 gareland cottageDrawing · PDF21 Feb 2022View
Volume 1 - ta4-4 annex 8 to 12 - wireframesDrawing · PDF21 Feb 2022View
Volume 1 - ta4-4 residential visual amenity studyReports (Public) · PDF21 Feb 2022View
Volume 1 - ta4-5 townscape visual assessmentReports (Public) · PDF21 Feb 2022View
Volume 1 - ta4-6 assessment of effects on landscape designationsReports (Public) · PDF21 Feb 2022View
Volume 1 - ta4-7 proposed development in isolationReports (Public) · PDF21 Feb 2022View
Volume 1 - ta4-8 annex - comparative visualisationsDrawing · PDF21 Feb 2022View
Volume 1 - ta4-8 consented lethans wind farm revised rotor diameterReports (Public) · PDF21 Feb 2022View
Volume 1 - ta5-3 vp dataReports (Public) · PDF21 Feb 2022View
Volume 1 - ta5-4 crm modelling exampleReports (Public) · PDF21 Feb 2022View
Volume 1 - ta5-5 cumulative assessmentReports (Public) · PDF21 Feb 2022View
Volume 1 - ta7-1 construction and decommissioning noise assessmentReports (Public) · PDF21 Feb 2022View
Volume 1 - ta7-2 operational noise assessmentReports (Public) · PDF21 Feb 2022View
Volume 1 - ta8-1 cultural heritage baseline part 1Reports (Public) · PDF21 Feb 2022View
Volume 1 - ta8-1 cultural heritage baseline part 2Drawing · PDF21 Feb 2022View
Volume 1 - ta8-1 cultural heritage baseline part 3Drawing · PDF21 Feb 2022View
Volume 1 - ta8-2 proposed development in isolationReports (Public) · PDF21 Feb 2022View
Volume 1 - ta8-3 consented lethans wind farm revised rotor diameterReports (Public) · PDF21 Feb 2022View
Volume 1 - ta9-1a abnormal loads assessment - glasgow route part 1Reports (Public) · PDF21 Feb 2022View
Volume 2 - part a - fig 4-1 site location and initial lvia study area 45kmDrawing · PDF21 Feb 2022View
Volume 2 - part a - fig 4-10 local landscape context to 2kmDrawing · PDF21 Feb 2022View
Volume 2 - part a - fig 4-11 principle visual receptors to 35kmDrawing · PDF21 Feb 2022View
Volume 2 - part a - fig 4-12 blade tip ztv to 45km with viewpointsDrawing · PDF21 Feb 2022View
Volume 2 - part a - fig 4-13 blade tip ztv to 45km with viewpoints - ne quadrantDrawing · PDF21 Feb 2022View
Volume 2 - part a - fig 4-14 blade tip ztv to 45km with viewpoints - se quadrantDrawing · PDF21 Feb 2022View
Volume 2 - part a - fig 4-15 blade tip ztv to 45km with viewpoints - nw quadrantDrawing · PDF21 Feb 2022View
Volume 2 - part a - fig 4-16 blade tip ztv to 45km with viewpoints - sw quadrantDrawing · PDF21 Feb 2022View
Volume 2 - part a - fig 4-2 other wind farms within 35kmDrawing · PDF21 Feb 2022View
Volume 2 - part a - fig 4-3 other wind farms within 20kmDrawing · PDF21 Feb 2022View
Volume 2 - part a - fig 4-4 landscape designations within 35kmDrawing · PDF21 Feb 2022View
Volume 2 - part a - fig 4-5 landscape character types local authority within 35kDrawing · PDF21 Feb 2022View
Volume 2 - part a - fig 4-6 landscape character types snh within 35kmDrawing · PDF21 Feb 2022View
Volume 2 - part a - fig 4-7 landscape character types local authority within 20kDrawing · PDF21 Feb 2022View
Volume 2 - part a - fig 4-8 landscape character types snh within 20kmDrawing · PDF21 Feb 2022View
Volume 2 - part a - fig 4-9 topography plan to 35kmDrawing · PDF21 Feb 2022View
Volume 1 - ta fig 10-1 solid geologyDrawing · PDF21 Feb 2022View
Volume 1 - ta fig 10-2 superficial geologyDrawing · PDF21 Feb 2022View
Volume 1 - ta fig 10-3 peat interpolationDrawing · PDF21 Feb 2022View
Volume 1 - ta fig 10-4 hydrologyDrawing · PDF21 Feb 2022View
Volume 1 - ta fig 10-5 peat slide hazardDrawing · PDF21 Feb 2022View
Volume 1 - ta fig 10-6 topographyDrawing · PDF21 Feb 2022View
Volume 1 - ta fig 10-7 peat excavationDrawing · PDF21 Feb 2022View
Volume 1 - ta fig 11-1 recreational paths and routes within study areasDrawing · PDF21 Feb 2022View
Volume 1 - ta fig 12-3-1 baseline felling planDrawing · PDF21 Feb 2022View
Volume 1 - ta fig 12-3-2 baseline restocking planDrawing · PDF21 Feb 2022View
Volume 1 - ta fig 12-3-3 development felling planDrawing · PDF21 Feb 2022View
Volume 1 - ta fig 12-3-4 development restocking planDrawing · PDF21 Feb 2022View
Volume 1 - ta fig 12-3-5 access map fellingDrawing · PDF21 Feb 2022View
Volume 1 - ta fig 12-3-6 access map restockingDrawing · PDF21 Feb 2022View
Volume 1 - ta fig 13-3-1 location planDrawing · PDF21 Feb 2022View
Volume 1 - ta fig 13-3-2 scoping layoutDrawing · PDF21 Feb 2022View
Volume 1 - ta fig 13-3-3 design iteration oneDrawing · PDF21 Feb 2022View
Volume 1 - ta fig 13-3-4 design iteration two chilled turbine layoutDrawing · PDF21 Feb 2022View
Volume 1 - ta fig 13-3-5 design iteration two chilled turbine layout with infrasDrawing · PDF21 Feb 2022View
Volume 1 - ta fig 9-1 traffic study areaDrawing · PDF21 Feb 2022View
Volume 1 - ta10-1 preliminary peat slide risk assessment part 1 of 2Reports (Public) · PDF21 Feb 2022View
Volume 1 - ta10-1 preliminary peat slide risk assessment part 2 of 2Drawing · PDF21 Feb 2022View
Volume 1 - ta10-2 preliminary peat management planDrawing · PDF21 Feb 2022View
Volume 1 - ta10-3 carbon balance studyReports (Public) · PDF21 Feb 2022View
Volume 1 - ta10-4 watercourse crossing strategyDrawing · PDF21 Feb 2022View
Volume 1 - ta12-1 aviation impact assessmentReports (Public) · PDF21 Feb 2022View
Volume 1 - ta12-2 shadow flicker assessmentReports (Public) · PDF21 Feb 2022View
Volume 1 - ta12-3 forestryReports (Public) · PDF21 Feb 2022View
Volume 1 - ta12-4 grid connection optionsReports (Public) · PDF21 Feb 2022View
Volume 1 - ta13-1 annex 1 description of developmentReports (Public) · PDF21 Feb 2022View
Volume 1 - ta13-2 annex 2 proposed conditionsReports (Public) · PDF21 Feb 2022View
Volume 1 - ta13-3 gatecheck reportReports (Public) · PDF21 Feb 2022View
Volume 1 - ta9-1a abnormal loads assessment - glasgow route part 2Drawing · PDF21 Feb 2022View
Volume 1 - ta9-1a abnormal loads assessment - glasgow route part 3Drawing · PDF21 Feb 2022View
Volume 1 - ta9-1b abnormal loads assessment - ayr route part 1Reports (Public) · PDF21 Feb 2022View
Volume 1 - ta9-1b abnormal loads assessment - ayr route part 2Drawing · PDF21 Feb 2022View
Volume 1 - ta9-1b abnormal loads assessment - ayr route part 3Drawing · PDF21 Feb 2022View
Amended vol 1 - pa03 - site layout (construction) planDrawings / Plans · PDF20 Jan 2022View
Amended vol 1 - pa04 - site layout (operational) planDrawings / Plans · PDF20 Jan 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision Made Date

    Published milestoneCouncil source

Decision & conditions

Decision not yet published
Scottish ministers' decision letter Scottish ministers' decision letter annex 3 site layout Scottish ministers' decision letter annex 4 appropriate assessment
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.