Council planning record
Existing access from unclassified road, 500m south of A71 junction (access to proposed Mill Rig Wind Farm)
Last published check: 2 Oct 2026, 21:36. Check the council record for more recent changes.
Existing access from unclassified road, 500m south of A71 junction (access to proposed Mill Rig Wind Farm)
This record has no verified map location.
View council mapUpgrade to A71 junction and existing access track to proposed Mill Rigg wind farm (located in South Lanarkshire Council)
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| Nid formOther · PDF | 28 Jul 2025 | View |
| Grid connection hra response letterDecision Notices · PDF | 21 Oct 2024 | View |
| Cable works hra informationReports (Public) · PDF | 28 Aug 2024 | View |
| Report of handlingReports (Public) · PDF | 12 Jan 2023 | View |
| Approved with conditionsDecision Notices · PDF | 12 Jan 2023 | View |
| Volume 1 - chapter 2 - the proposed developmentReports (Public) · PDF | 13 Sept 2021 | View |
| Neighbour notification plan (no nn reqd)Drawing · PDF | 4 Aug 2021 | View |
| Appendix 1 - mill rig pan july 2020 slc formReports (Public) · PDF | 15 Jul 2021 | View |
| Appendix 1 - mill rig plan july 2020 eac formReports (Public) · PDF | 15 Jul 2021 | View |
| Appendix 1 - mill rig plan reportReports (Public) · PDF | 15 Jul 2021 | View |
| Appendix 2 - pan acceptance lettersReports (Public) · PDF | 15 Jul 2021 | View |
| Appendix 3 - newspaper advert and news releaseReports (Public) · PDF | 15 Jul 2021 | View |
| Appendix 4 - leaflet august 2020Reports (Public) · PDF | 15 Jul 2021 | View |
| Appendix 5 - leaflet november 2020Reports (Public) · PDF | 15 Jul 2021 | View |
| Appendix 6 - social media advert online consultation content emails follow upReports (Public) · PDF | 15 Jul 2021 | View |
| Appendix 7 - questions comments and responses from consultationReports (Public) · PDF | 15 Jul 2021 | View |
| Non technical summaryReports (Public) · PDF | 15 Jul 2021 | View |
| Planning statementReports (Public) · PDF | 15 Jul 2021 | View |
| Pre application consultation reportReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 1 - chapter 1 - introductionReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 1 - chapter 10 - water resourcesReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 1 - chapter 12 - traffic and transportReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 1 - chapter 13 - other effectsReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 1 - chapter 14 - summary of signficant effectsReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 1 - chapter 3 - site selection design evolutionReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 1 - chapter 4 - the eia processReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 1 - chapter 5 - lviaReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 1 - chapter 6 - ornithologyReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 1 - chapter 7 - ecologyReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 1 - chapter 8 - noiseReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 1 - chapter 9 - cultural heritage and archaeologyReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 1 - chapter 11 - geology and peatReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 12-1 traffic and transport study areaDrawing · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 12-2 traffic counter locationsDrawing · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 12-3 abnormal loads routeDrawing · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 13-1 proximity of fixed links to the siteDrawing · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 3-1 layout design iterationsDrawing · PDF | 15 Jul 2021 | View |
| Volume 2 - blacksidend cairnPhoto · PDF | 15 Jul 2021 | View |
| Volume 2 - dungavel hill cairnPhoto · PDF | 15 Jul 2021 | View |
| Volume 2 - glen carr cairnPhoto · PDF | 15 Jul 2021 | View |
| Volume 2 - main castle earthworkPhoto · PDF | 15 Jul 2021 | View |
| Volume 2 - stoneyhillPhoto · PDF | 15 Jul 2021 | View |
| Volume 2 - vp1Photo · PDF | 15 Jul 2021 | View |
| Volume 2 - vp10Photo · PDF | 15 Jul 2021 | View |
| Volume 2 - vp11Photo · PDF | 15 Jul 2021 | View |
| Volume 2 - vp12Photo · PDF | 15 Jul 2021 | View |
| Volume 2 - vp13Photo · PDF | 15 Jul 2021 | View |
| Volume 2 - vp14Photo · PDF | 15 Jul 2021 | View |
| Volume 2 - vp2Photo · PDF | 15 Jul 2021 | View |
| Volume 2 - vp3Photo · PDF | 15 Jul 2021 | View |
| Volume 2 - vp5Photo · PDF | 15 Jul 2021 | View |
| Volume 2 - vp6Photo · PDF | 15 Jul 2021 | View |
| Volume 2 - vp7Photo · PDF | 15 Jul 2021 | View |
| Volume 2 - vp8Photo · PDF | 15 Jul 2021 | View |
| Volume 2 - vp9Photo · PDF | 15 Jul 2021 | View |
| Volume 2 - waterheadPhoto · PDF | 15 Jul 2021 | View |
| Volume 2- vp4Photo · PDF | 15 Jul 2021 | View |
| Design and access statementReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 11-5 - surface firmnessDrawing · PDF | 15 Jul 2021 | View |
| Volume 1 - eiar - planning permission form - eacReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 10-1 - local hydrologyDrawing · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 10-2 - abstractions and dischargesDrawing · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 11-1 - superficial geologyDrawing · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 11-2 - bedrock geologyDrawing · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 11-3 - soilsDrawing · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 11-4 - peat depthDrawing · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 11-6 - land capability of agricultureDrawing · PDF | 15 Jul 2021 | View |
| Approved volume 1 - figure 2-1 - site layout - constructionDrawing · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 2-10 - temporary construction compoundDrawing · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 2-11 - indicative borrow pit layout 1Drawing · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 2-12 - indicative borrow pit layout 2Drawing · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 2-13 - indicative borrow pit layout 3Drawing · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 2-14 - indicative borrow pit layout 4Drawing · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 2-15 - typical borrow pit restorationDrawing · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 2-17 - construction felling planDrawing · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 2-18 - construction restock planDrawing · PDF | 15 Jul 2021 | View |
| Approved volume 1 - figure 2-2 - site layout - operationsDrawing · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 2-3 - typical turbine dimensionsDrawing · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 2-4 - typical turbine foundationDrawing · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 2-5 - typical crane hardstanding dimensionsDrawing · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 2-6 - indicative anemometer mast arrangementDrawing · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 2-7 - indicative cable trench detailDrawing · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 2-8 - indicative substation layoutDrawing · PDF | 15 Jul 2021 | View |
| Approved volume 1 - figure 2-9 - typical track design cross sectionDrawing · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 5-1 - local context and core pathsDrawing · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 5-10 - cumulative ztv study schemes in planning including woodDrawing · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 5-11 - ztv study 2000 candela nacelle light visibilityDrawing · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 5-13 - local landscape character and exisiting light pollutionDrawing · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 5-16 - baseline species planDrawing · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 5-2 - site location and landscape policy contextDrawing · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 5-3 - landscape characterDrawing · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 5-4 - topographyDrawing · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 5-5 - ztv study including woodlands and settlementsDrawing · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 5-6 - ztv study bare groundDrawing · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 5-7 - cumulative developments 25kmDrawing · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 5-8 - cumulative developments 15kmDrawing · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 5-9 - cumulative ztv study operational and consented schemes iDrawing · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 8-1- noise monitoring locations and noise assessments locationDrawing · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 8-2 - site infrastructure layout and noise assessment locationDrawing · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 8-3 - cumulative turbine locationsDrawing · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 9-1 - designated heritage assets abd nsr sites of schedulableDrawing · PDF | 15 Jul 2021 | View |
| Volume 1 - figure 9-2 - heritage assets and the construction footprintDrawing · PDF | 15 Jul 2021 | View |
| Volume 1- figure 5-12 - ztv study 2000 candela tower light visibilityDrawing · PDF | 15 Jul 2021 | View |
| Volume 2 - ta 13-2 - shadow flickerReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - appendices coversReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - appendices listReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 10-1 - flood risk assessment noteReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 10-2 - private water suppliesReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 10-3 - car licensesReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 10-4 - gwdte sepa checklistReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 10-5 - watercourse crossingReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 11-1 - peat survey reportReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 11-2 - outline peat management planReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 11-3 - peat landslide hazards risk assessmentReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 11-4 - plhra input to geotechnical risk registerReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 11-5 carbon balance studyReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 12-1 - abnormal loads access assessmentReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 12-2 - framework construction stage management planReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 13-1 - aviation impact assessmentReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 13-3 - telecommunications consultationReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 14-1 - summary of mitigationReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 2-1 - outline construction method statementReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 2-2- construction environmental management planReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 2-3 - connect2renewables charterReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 2-4 - forestryReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 4-1- scoping response tableReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 5-1 - glossary and methodologyReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 5-2 - viewpoint descriptionsReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 5-3 - effects of less than moderate significanceReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 6-2 - ornithological collison risk modelling and cumulative assessReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 7-1 - ecology technical report excluding bats part 2Reports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 7-1 - ecology technical report excluding bats part 3Reports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 7-1 - ecology technical report excluding bats part 4Reports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 7-1 - ecology technical report excluding bats part 1Reports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 7-2 - bats technical report part 2Reports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 7-2 - bats technical report part 1Reports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 7-2 - bats technical report part 3Reports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 7-2 - bats technical report part 4Reports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 7-2 - bats technical report part 5Reports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 7-2 - bats technical report part 6Reports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 7-3 - outline habitat management plan part 1Reports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 7-3 - outline habitat management plan part 2Reports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 8-1 - construction noise report part 1Reports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 8-1 - construction noise report part 2Reports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 8-2 - operational noise report part 1 - 3Reports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 8-2 - operational noise report part 1 - 4Reports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 8-2 - operational noise report part 1 -2Reports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 8-2 - operational noise report part 1 -5Reports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 8-2 - operational noise report part 1Reports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 8-2 - operational noise report part 2 -2Reports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 8-2 - operational noise report part 2Reports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 8-2 - operational noise report part 2-3Reports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 9-1 - cultural heritage baseline part 1Reports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 9-1 - cultural heritage baseline part 2 - 2Reports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 9-1 - cultural heritage baseline part 2 - 3Reports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 9-1 - cultural heritage baseline part 2Reports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 9-1 - cultural heritage baselineReports (Public) · PDF | 15 Jul 2021 | View |
| Volume 3 - ta 5-4 rvaaReports (Public) · PDF | 15 Jul 2021 | View |
| Approved location planDrawing · PDF | 2 Jul 2021 | View |
| Approved application boundaryDrawing · PDF | 2 Jul 2021 | View |
| Approved site layout - constructionDrawing · PDF | 2 Jul 2021 | View |
| Approved site layout - operationDrawing · PDF | 2 Jul 2021 | View |
| Application pdfApplication Form · PDF | 14 Jun 2021 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
No related records were published in this section.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.