Council planning record

Amend the bell-mouth road access design by bringing the road 5 metres into the site to allow for safe vehicle movement, finish the 5 metre road to final road finish specification and adjust gate configuration to new road layout and ensure security of the site entrance (Planning Consent No. 20/0240/PP)

Formation Of A New Access Road Junction Lugton Road Dunlop East Ayrshire

DecidedReference: 21/0047/NMVEast Ayrshire

Last published check: 2 Oct 2026, 15:26. Check the council record for more recent changes.

Application location

Formation Of A New Access Road Junction Lugton Road Dunlop East Ayrshire

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Non Material Variations
Received
14 Sept 2021
Validated
14 Sept 2021
Determination deadline
13 Nov 2021
Local authority
East Ayrshire

Application overview

Amend the bell-mouth road access design by bringing the road 5 metres into the site to allow for safe vehicle movement, finish the 5 metre road to final road finish specification and adjust gate configuration to new road layout and ensure security of the site entrance (Planning Consent No. 20/0240/PP)

Proposal details

Reference
21/0047/NMV
Ward
Annick
Agent
EAC Facilities and Property Management

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 7 of 7

DocumentPublishedAction
Nmv decision letterDecision Notices · PDF30 Sept 2021View
Approved non material variationApplication Form · PDF14 Sept 2021View
Approved composite plan (proposed site entrance lugton road)Drawing · PDF14 Sept 2021View
Approved proposed site plan (works to 35 lugton road)Drawing · PDF14 Sept 2021View
Approved proposed bellmouth and footway works planDrawing · PDF14 Sept 2021View
Approved proposed bellmouth and footway works detailsDrawing · PDF14 Sept 2021View
Approved proposed sewer diversion (scottish water)Other · PDF14 Sept 2021View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Decision Issued Date

    Published milestoneCouncil source
  5. Decision Made Date

    Published milestoneCouncil source
  6. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approved
Nmv decision letter
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.