Council planning record

Erection of 10 no wind turbines with a maximum height of 180 metres and associated infrastructure, including access tracks.

Overhill Wind Farm B741 From Armour Wynd To U720 Dalricket Dalmellington East Ayrshire

DecidedReference: 20/0425/PPEast Ayrshire

Application location

Overhill Wind Farm B741 From Armour Wynd To U720 Dalricket Dalmellington East Ayrshire

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Planning Permission
Received
20 Aug 2020
Validated
16 Sept 2020
Determination deadline
15 Jan 2021
Local authority
East Ayrshire

Application overview

Erection of 10 no wind turbines with a maximum height of 180 metres and associated infrastructure, including access tracks.

Proposal details

Reference
20/0425/PP
Alternative references
100294426-001
Ward
Cumnock And New Cumnock

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 148 of 148

DocumentPublishedAction
Public notice (chronical)Public Notices · PDF24 Jun 2026View
Decision notice appeal (dpea)Decision Notices · PDF7 Jul 2023View
Application form (appeal)Application Form · PDF15 Dec 2021View
Appeal statement of appealReports (Public) · PDF15 Dec 2021View
RefusedDecision Notices · PDF30 Sept 2021View
Committee reportReports (Public) · PDF24 Sept 2021View
Ifl lvia audit addendumReports (Public) · PDF31 Aug 2021View
Cumnock chroniclePublic Notices · PDF6 Aug 2021View
Reneighbour notification planDrawing · PDF27 Jul 2021View
Refused upper beoch rva wireframeDrawing · PDF26 Jul 2021View
Accon technical note - noiseReports (Public) · PDF30 Jun 2021View
Ifl lvia auditReports (Public) · PDF28 Jun 2021View
Refused appendix 1-1 eac emailOther · PDF20 Apr 2021View
Refused appendix 2-1 - nightime visualisations viewpoint 7 ochiltree near the a7Drawing · PDF20 Apr 2021View
Refused appendix 2-2 - nighttime visualisations viewpoint a upper beoch_low resDrawing · PDF20 Apr 2021View
Refused appendix 2-3 - luxsolar-datasheetReports (Public) · PDF20 Apr 2021View
Refused appendix 2-4 - operational turbine lightingDrawing · PDF20 Apr 2021View
Refused appendix 2-5 - stephenson halliday review of hepla rvaaReports (Public) · PDF20 Apr 2021View
Refused appendix 4-1 - carbon calculatorReports (Public) · PDF20 Apr 2021View
Refused appendix 4-2 - pre construction bat monitoring reportReports (Public) · PDF20 Apr 2021View
Refused figure 2-1 - lighting cztv - overhill - lethans - windy standard 3Drawing · PDF20 Apr 2021View
Refused figure 2-2 - lighting cztv - overhill - sanquhar 2Drawing · PDF20 Apr 2021View
Refused overhill fei report-textReports (Public) · PDF20 Apr 2021View
Accon noise reviewReports (Public) · PDF8 Feb 2021View
Refused octave sound power levels - condidate turbineReports (Public) · PDF21 Jan 2021View
Refused noise level, power curves, thrust curves - candidate turbineReports (Public) · PDF21 Jan 2021View
Main text volume 1 (appendices)Reports (Public) · PDF24 Nov 2020View
Refused main text volume 1Reports (Public) · PDF24 Nov 2020View
Refused volume ii contentsReports (Public) · PDF24 Nov 2020View
Refused volume ii figures 1.1-3.11Drawing · PDF24 Nov 2020View
Refused volume ii figures 10.1-10.4Drawing · PDF24 Nov 2020View
Refused volume ii figures 10.5-10.9Drawing · PDF24 Nov 2020View
Refused volume ii figures 10.10-10.15Drawing · PDF24 Nov 2020View
Refused volume ii figures 10.16-10.19Drawing · PDF24 Nov 2020View
Refused volume ii viewpoint 1Drawing · PDF24 Nov 2020View
Refused volume ii viewpoint 2Drawing · PDF24 Nov 2020View
Refused volume ii viewpoint 3Drawing · PDF24 Nov 2020View
Refused volume ii viewpoint 4Drawing · PDF24 Nov 2020View
Refused volume ii viewpoint 5Drawing · PDF24 Nov 2020View
Refused volume ii viewpoint 6Drawing · PDF24 Nov 2020View
Refused volume ii viewpoint 7Drawing · PDF24 Nov 2020View
Refused volume ii viewpoint 8Drawing · PDF24 Nov 2020View
Refused volume ii viewpoint 9Drawing · PDF24 Nov 2020View
Refused volume ii viewpoint 10Drawing · PDF24 Nov 2020View
Refused volume ii viewpoint 11Drawing · PDF24 Nov 2020View
Refused volume ii viewpoint 12-24Drawing · PDF24 Nov 2020View
Neighbour notification planDrawings / Plans · PDF13 Nov 2020View
Refused volume iv non technical summaryReports (Public) · PDF27 Oct 2020View
Refused volume i eiar written textReports (Public) · PDF27 Oct 2020View
Refused environmental statement (may 2017) vol. 1Reports (Public) · PDF25 Aug 2020View
Refused es vol. ii (may 2017) (project description and construction methods)Reports (Public) · PDF25 Aug 2020View
Refused es vol. ii (may 2017) (design evolution)Reports (Public) · PDF25 Aug 2020View
Refused es vol. ii (may 2017) (landscape and visual)Reports (Public) · PDF25 Aug 2020View
Refused es vol. ii (may 2017) (cultural heritage and archaeology)Reports (Public) · PDF25 Aug 2020View
Refused es vol. ii (may 2017) (ornithology)Reports (Public) · PDF25 Aug 2020View
Refused es vol. ii (may 2017) (ecology)Reports (Public) · PDF25 Aug 2020View
Refused es vol. ii (may 2017) (noise assessment location and predictions)Reports (Public) · PDF25 Aug 2020View
Refused es vol. ii (may 2017) (traffic and transport)Reports (Public) · PDF25 Aug 2020View
Refused es vol. ii (may 2017) (geology hydrology and hydrogeologyReports (Public) · PDF25 Aug 2020View
Refused es vol. ii (may 2017) (forestry)Reports (Public) · PDF25 Aug 2020View
Refused es vol. ii (may 2017) (tv shadow area)Reports (Public) · PDF25 Aug 2020View
Refused es vol. iii (may 2017) appendices (project description)Reports (Public) · PDF25 Aug 2020View
Refused es vol. iii (may 2017)appendices (landscape and visual)Reports (Public) · PDF25 Aug 2020View
Refused es vol. iii (may 2017) appendices (cultural heritage and archaeology)Reports (Public) · PDF25 Aug 2020View
Refused es vol. iii (may 2017) appendices (ornithology)Reports (Public) · PDF25 Aug 2020View
Refused es vol. iii (may 2017) appendices (ecology)Reports (Public) · PDF25 Aug 2020View
Refused es vol. iii (may 2017) appendices (noise)Reports (Public) · PDF25 Aug 2020View
Refused es vol. iii (may 2017) appendices (traffic and transportation)Reports (Public) · PDF25 Aug 2020View
Refused es vol. iii (may 2017) appendices (hydrology and hydrogeology)Reports (Public) · PDF25 Aug 2020View
Refused es vol. iii (may 2017) appendices (socio economic statement)Reports (Public) · PDF25 Aug 2020View
Refused es vol. iii (may 2017) appendices (summary)Reports (Public) · PDF25 Aug 2020View
Refused es vol.iv (may 2017) (non technical summary)Reports (Public) · PDF25 Aug 2020View
Refused fei (aug 2018) draft outline habitat management and research planReports (Public) · PDF25 Aug 2020View
Refused fei (aug 2018) outline habitat management planReports (Public) · PDF25 Aug 2020View
Refused fei (aug 2018) peat samples aReports (Public) · PDF25 Aug 2020View
Refused fei (aug 2018) peat samples bReports (Public) · PDF25 Aug 2020View
Refused fei (aug 2018) technical appendix 4.5 dpmpReports (Public) · PDF25 Aug 2020View
Refused further env. information (august 2018)Reports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) appendices (cover front)Reports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) appendices (cover rear)Reports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) over hill carbon calculatorReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) water crossingsReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) pws assessmentReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) gwdte assessmentReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) dpmp (p6 is landscape)Reports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) peat samples planReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) peat samples detail planReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) plhra calcsReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) plhra merged figures 1-7Reports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) plhra reportReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) ohmrpReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) ohmrp plansReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) snh and rspb correspondenceReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) clvia (2 colours)Reports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) decommissioning and restoration of over hill reportReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) decommissioning report figuresReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) contents pageReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) constraints and layout planReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) turbine and infrastructure layout planReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) dl-ovhReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) hc-ovhReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) dtm-ovhReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) br-bgs-ovhReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) s-bgs-ovhReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) wc-ovhReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) pws-ovhReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) gwdte-ovhReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) p2 peat samples ovhReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) peat p2 ovhReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) wind farm felling planReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) wind farm restock planReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) compensatory planting planReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) designations 5kReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) p1 habitats ovhReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) nvc habitats ovhReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) gwdte habitats ovhReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) annex 1 habitats ovhReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) ps ovhReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) bat survey locations ovhReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) bats spatial activity 2014 ovhReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) bat temporal activity pie 2014 ovhReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) bat temporal activity pie 2016 ovhReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) hmp ovhReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) ds ovhReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) sb-sa ovhReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) arch constraints planReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) cmra constraints planReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) chapter 1Reports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) chapter 2Reports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) chapter 3Reports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) chapter 4Reports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) chapter 5Reports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) chapter 6Reports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) chapter 7Reports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) chapter 8Reports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) chapter 9Reports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) chapter 10Reports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) chapter 11Reports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) contentsReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) over hill rvaa assessmentReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) banner visuals final 100Reports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) rvaa figuresReports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) res visuals final 100Reports (Public) · PDF25 Aug 2020View
Refused fei (mar 2018) res visuals final 400Reports (Public) · PDF25 Aug 2020View
Refused design and access statementReports (Public) · PDF25 Aug 2020View
Refused location planDrawing · PDF20 Aug 2020View
Application formApplication Form · PDF20 Aug 2020View
Refused pre application consultation reportReports (Public) · PDF20 Aug 2020View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  5. Last Advertised In Press Date

    Published milestoneCouncil source
  6. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Actual Committee Date

    Published milestoneCouncil source
  10. Decision Issued Date

    Published milestoneCouncil source
  11. Decision Made Date

    Published milestoneCouncil source
  12. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Refused

Appeal status: Appeal lodged

Decision notice appeal (dpea) Refused
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.