T2 Cedar Option 1 Reduce height by 5m and prune sides to shape (by up to 3-4m) Option 2 Install Cobra Bracing System to support main stems Option 3 Have union tested at 1.8m by consultant using decay detection device.T3 - Birch - FellT5 - Beech - Remove major deadwood Monitor condition bienniallyT6 - Spruce - FellT7 - Sycamore - Remove major deadwood Monitor conditionT9 - Ash - Sever ivy at the base Monitor when in leaf, for signs of Ash DiebackT10 - Cypress - Fell as close to ground level as practical Grind the stumps below ground level to allow this section of the hedgerow to be replantedT11 - Beech - Pruning light secondary branches: Crown lift/prune back from road up to 5m Prune to clear streetlight by 1.5m TPO - WVDC-1-1988 and CCD-10-2010
The Old Court 25 Holywood Wolsingham Bishop Auckland DL13 3HE
T2 Cedar Option 1 Reduce height by 5m and prune sides to shape (by up to 3-4m) Option 2 Install Cobra Bracing System to support main stems Option 3 Have union tested at 1.8m by consultant using decay detection device.T3 - Birch - FellT5 - Beech - Remove major deadwood Monitor condition bienniallyT6 - Spruce - FellT7 - Sycamore - Remove major deadwood Monitor conditionT9 - Ash - Sever ivy at the base Monitor when in leaf, for signs of Ash DiebackT10 - Cypress - Fell as close to ground level as practical Grind the stumps below ground level to allow this section of the hedgerow to be replantedT11 - Beech - Pruning light secondary branches: Crown lift/prune back from road up to 5m Prune to clear streetlight by 1.5m TPO - WVDC-1-1988 and CCD-10-2010
Reference
DM/25/00626/TPO
Alternative references
PP-13821311
Ward
Weardale
Parish
Wolsingham
Agent
Olivers Tree Services Ltd
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.