Council planning record

Additional 2-storey to two-storey commercial office building for C3 use as 4 x 1 bed flat

120, KING STREET, DUDLEY, WEST MIDLANDS, DY2 8NZ

Decision madeReference: P25/1503Dudley Metropolitan Borough Council

Last published check: 3 Oct 2026, 19:37. Check the council record for more recent changes.

Application location

120, KING STREET, DUDLEY, WEST MIDLANDS, DY2 8NZ

This record has no verified map location.

Application summary

Status
Decision made
Application type
Full Planning Permission
Received
15 Dec 2025
Validated
Not published
Determination deadline
18 Mar 2026
Local authority
Dudley Metropolitan Borough Council

Application overview

Additional 2-storey to two-storey commercial office building for C3 use as 4 x 1 bed flat

Proposal details

Reference
P25/1503
Alternative references
PP-14150979
Development type
Extension / Alteration
Ward
St. James's
Agent
Ball
UPRN
90124640

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 34 of 34

DocumentPublishedAction
The location planDCGENPLN15 Dec 2025View
Site/Block Plan - ExistingDCGENPLN15 Dec 2025View
SUPERSEDED Proposed Block plan of the siteDCSUPER15 Dec 2025View
Existing elevationsDCGENPLN15 Dec 2025View
SUPERSEDED front and right side elevationsDCSUPER15 Dec 2025View
SUPERSEDED Proposed rear and left side elevationsDCSUPER15 Dec 2025View
Existing floor plansDCGENPLN15 Dec 2025View
SUPERSEDED Proposed ground and first floor plansDCSUPER15 Dec 2025View
SUPERSEDED Proposed second and third floor plansDCSUPER15 Dec 2025View
SUPERSEDED Proposed roof terrace plan and roof planDCSUPER15 Dec 2025View
Heritage statementDCPUBLIC21 Jan 2026View
Land ContaminationDCCONRES2 Feb 2026View
Supporter - Goldfinch Town PlanningDCSUPPRT3 Feb 2026View
Comment - 1 Cornwall Street, BirminghamDCOBJECT4 Feb 2026View
EHO 1DCCONRES16 Feb 2026View
HET 1DCCONRES27 Feb 2026View
Highways (AMEY) 1DCCONRES27 Feb 2026View
Highways (AMEY) 2DCCONRES11 Mar 2026View
AMENDED 012.Rev01-Proposed Site PlanDCGENPLN11 Mar 2026View
SUPERSEDED 006A rev01 Proposed Elevations (1) (1)DCSUPER27 Apr 2026View
AMENDED 005A rev02 Proposed Roof PlanDCGENPLN27 Apr 2026View
SUPERSEDED 007A rev02 Proposed Elevations (1) (1)DCSUPER27 Apr 2026View
AMENDED 004A rev02 Proposed Floor PlansDCGENPLN27 Apr 2026View
Covering EmailDCPUBLIC27 Apr 2026View
ADD INFO P9794-OA1-V1 120 King Street, Dudley, DY2 8NZ - OA (1) Odour AssessmentDCPUBLIC15 May 2026View
ADD INFO P9794-NA1-V1 120 King St. Dudley Noise AssessmentDCPUBLIC15 May 2026View
HET 2DCCONRES20 May 2026View
AMENDED 006A rev02 Proposed ElevationsDCGENPLN21 May 2026View
ADD INFO Covering EmailDCPUBLIC21 May 2026View
AMENDED 007A rev03 Proposed ElevationsDCGENPLN21 May 2026View
Picture 1DCPUBLIC21 May 2026View
EHO 2DCCONRES29 May 2026View
Decision NoticeDCDECIS1 Jun 2026View
Officer ReportDCGENDOC1 Jun 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Site notice date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Dispatch date

    Published milestoneCouncil source
  10. Decision date

    Published milestoneCouncil source
  11. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  13. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  14. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approved with Conditions
Decision Notice
Planning conditions
  1. The development hereby permitted shall be begun before the expiration of three years from the date of this permission. REASON: To comply with Section 91(1) of the Town and Country Planning Act, 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
  2. The development hereby permitted shall be carried out in accordance with the following approved plans: 004A rev02 Proposed Floor Plans 005A rev02 Proposed Roof Plan 006A rev02 Proposed Elevations 007A rev03 Proposed Elevations 012 rev01 Proposed Site Plan REASON: For the avoidance of doubt and in the interests of proper planning.
  3. No part of the development shall be occupied before a scheme for protecting residents in the proposed dwellings from noise from nearby commercial uses and road traffic has been submitted to and approved in writing by the local planning authority. All works which form part of the approved scheme shall be completed before occupation of the permitted dwelling(s) and the protection measures in the agreed scheme shall be maintained throughout the life of the development. REASON: In order to safeguard the amenities and wellbeing of the occupiers of the proposed dwelling(s) in compliance with Borough Development Strategy 2017 Policy L1 Housing Development, extensions and alterations to existing dwellings Policy D2 Incompatible Land Uses
  4. No works other than demolition shall commence until details of the hard surfacing of the development hereby approved have been submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in complete accordance with the approved details and retained for the lifetime of the development unless otherwise agreed in writing with the local planning authority. REASON: In order to make a positive contribution to place-making and provide a high quality landscaping in accordance with BCCS Policies CSP4 - Place-Making, ENV 2 Historic Character and Local Distinctiveness, ENV3 - Design Quality and DEL1 - Infrastructure Provision Borough Development Strategy 2017 Policy S6 Urban Design and Policy L1 Housing Development, extensions and alterations to existing dwellings Policy D2 Incompatible Land Uses (in part)
  5. Prior to the first occupation or use of the development details of the type and location of bird nesting provision on the site shall be submitted to and approved in writing by the local planning authority. Prior to the first occupation or use of the development the agreed provision shall be installed on site and thereafter maintained and retained for the lifetime of the development. REASON: In order to enhance, encourage and protect the nature conservation value of the site and in accordance with BCCS Policies ENV1 - Nature Conservation, CSP3 Environmental Infrastructure and DEL1 - Infrastructure Provision and Borough Development Strategy 2017 Policy S21 Nature Conservation Enhancement, Mitigation and Compensation Policy S20 The Borough's Geology (in part) Policy S1 Presumption in favour of Sustainable Development (in part) and Policy S21 Nature Conservation Enhancement, Mitigation and Compensation (in part) Policy S19 Dudley Borough's Green Network (in part) Black Country Core Strategy Policy ENV1 Nature Conservation (in part). This detail is required pre commencement (excluding demolition, site clearance and initial ground works) in that the required works may need to be incorporated into buildings on the site.
  6. No works other than demolition shall commence the following full architectural and specification details (at a scale of 1:10) have been submitted to and approved in writing by the local planning authority. i. Window openings: architrave, surround, window head, cills, reveals. ii. Windows: Overall design, glazing bar and frame dimensions and arrangement, materials, position in reveal, opening mechanism, handles, latches and locks; iii. External Doors: Overall design, dimension of frames/architraves, arrangement of materials and individual components and members, materials, reveal, opening mechanism, handles, latches and locks; iv. Rainwater goods: Design, location, materials, finish and fixing; v. New masonry: The position, form, and bonding; decorative feature wall, window surrounds and parapet vi. New balconies and balustrades: Materials, colour and finish, balustrade and rail, positioning and fixing to principal structure; vii. External stair: Cladding materials, colour and finish viii. Roofing materials; surface materials for roof top terrace Development shall proceed in accordance with the agreed details and be retained for the lifetime of the development. REASON: To safeguard the architectural and historic integrity of the listed structure in accordance with BCCS Policy ENV2 - Historic Character and Distinctiveness and Borough Development Strategy 2017 Policy S10 Listed Buildings. Details are required prior to the commencement of development/works due to the statutory protection / sensitive nature of the site.
  7. The materials to be used in the approved development shall match in appearance, colour and texture those of the existing building unless otherwise required by other conditions attached to this permission. REASON: In the interests of the visual amenities of the area and to comply with BCCS Policies CSP4 - Place-Making and ENV2 - Historic Character and Local Distinctiveness and Borough Development Strategy 2017 Policy S6 Urban Design and Policy L1 Housing Development, extensions and alterations to existing dwellings Policy D2 Incompatible Land Uses (in part). Informatives In dealing with this application the Local Planning Authority have worked with the applicant in a positive and proactive manner, seeking solutions to problems arising in relation to dealing with the application, by seeking to help the applicant resolve technical detail issues where required and maintaining the delivery of sustainable development. The development would improve the economic, social and environmental concerns of the area and thereby being in accordance with paragraph 38 of the National Planning Policy Framework. Informative: Biodiversity Net Gain Requirements When granting planning permission, Article 35 of the Town and Country Planning (Development Management Procedure) (England) Order 2015 (as amended by The Biodiversity Gain (Town and Country Planning) (Modifications and Amendments) (England) Regulations 2024) (https://www.legislation.gov.uk/uksi/2015/595/article/35/) requires planning authorities to set out the following information to signpost an applicant to the statutory framework for Biodiversity Net Gain. Paragraph 13 of Schedule 7A to the Town and Country Planning Act 1990 states that planning permission, granted for the development of land in England, is deemed to have been granted subject to the "Biodiversity Gain condition" and that development may not begin unless: (a) a Biodiversity Gain Plan has been submitted to the planning authority, and (b) the planning authority has approved the plan. The planning authority, for the purposes of determining whether to approve a Biodiversity Gain Plan if one is required in respect of this permission is the Dudley Metropolitan Borough Council. In accordance with the Biodiversity Net Gain Planning Practice Guidance, the Biodiversity Gain condition is not being repeated within this decision notice. However, please be aware that noncompliance with this statutory condition may result in enforcement action. There are statutory exemptions and transitional arrangements which mean that the Biodiversity Gain condition does not always apply. These are set out in The Biodiversity Gain Requirements (Exemptions) Regulations 2024 (https://www.legislation.gov.uk/uksi/2024/47/contents/made) and The Environment Act 2021 (Commencement No.8 and Transitional Provisions) Regulations 2024 (https://www.legislation.gov.uk/uksi/2024/44/made). The planning authority requests that, where an applicant is required to submit a Biodiversity Gain Plan, Habitat Management & Monitoring Plan (HMMP) and /or HMMP monitoring reports, that the applicant uses the standard national templates. If this permission is not exempt, and there is "irreplaceable habitat" onsite (as set out within Biodiversity Gain Requirements (Irreplaceable Habitat) Regulations 2024) (https://www.legislation.gov.uk/uksi/2024/48/contents/made) there are additional obligations for the content of the Biodiversity Gain Plan/s. This must be addressed before the planning authority can approve the plan(s). Based on the information available, it is not considered that this permission is subject to the statutory Biodiversity Gain condition, as the following exemption/s apply/ies: 4.2 Development below the de minimis threshold, meaning development which: i) does not impact an onsite priority habitat (a habitat specified in a list published under section 41 of the Natural Environment and Rural Communities Act 2006); and ii) impacts less than 25 square metres of onsite habitat that has biodiversity value greater than zero and less than 5 metres in length of onsite linear habitat (as defined in the statutory metric). As BNG is fully assessed after approval, the circumstances and/or information within the planning proposal provided may change. Therefore, to avoid enforcement action, you must evaluate if the condition is required and proceed accordingly (i.e. submitting a Biodiversity Gain Plan (if one is required) for approval), prior to beginning works onsite.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.