Council planning record

Variation of condition 2 (approved drawings) and 11 (SUDS) on planning permission 22/00705 as amended by 24/00258 (Installation of an electrical battery storage facility including the installation of UKPN connection area and equipment, ground raising, landscaping and associated works) to vary room sizes, the layout of access, increase of size of SUDS basin, removal of secondary security fencing and secondary water tanks, and to update drainage strategy report

Richborough Energy Park (Part Of Former Richborough Power Station) Ramsgate Road Sandwich CT13 9NL

DecidedReference: 25/00649Dover District Council

Last published check: 29 Sept 2026, 14:18. Check the council record for more recent changes.

Application location

Richborough Energy Park (Part Of Former Richborough Power Station) Ramsgate Road Sandwich CT13 9NL

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Removal or Variation of Condition(s)
Received
4 Jun 2025
Validated
24 Jun 2025
Determination deadline
23 Sept 2025
Local authority
Dover District Council

Application overview

Variation of condition 2 (approved drawings) and 11 (SUDS) on planning permission 22/00705 as amended by 24/00258 (Installation of an electrical battery storage facility including the installation of UKPN connection area and equipment, ground raising, landscaping and associated works) to vary room sizes, the layout of access, increase of size of SUDS basin, removal of secondary security fencing and secondary water tanks, and to update drainage strategy report

Proposal details

Reference
25/00649
Ward
Sandwich
Parish
SANDWICH
Agent
Montagu-Evans

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 34 of 34

DocumentPublishedAction
DECISION NOTICEDecision · PDF23 Dec 2025View
OFFICER REPORTReport23 Dec 2025View
KCC HIGHWAYSConsultee Response · PDF1 Dec 2025View
ENVRIONMENT AGENCYConsultee Response · PDF6 Nov 2025View
AMENDED EMPReport · PDF20 Oct 2025View
AMENDED CEMPReport · PDF20 Oct 2025View
LOCAL FLOOD AUTHORITYConsultee Comment · PDF7 Oct 2025View
LOCAL FLOOD AUTHORITYConsultee Response · PDF7 Oct 2025View
LOCAL FLOOD AUTHORITYConsultee Comment · PDF17 Sept 2025View
SURFACE WATER DRAINAGE STRATEGY AND CALCULATIONS REPORT - P07.PDFReport · PDF5 Sept 2025View
BASIN DESIGN CHECKLISTReport · PDF5 Sept 2025View
SURFACE WATER DRAINAGE STRATEGY AND CALCULATIONS REPORTReport · PDF28 Aug 2025View
AMENDED ARCHITECTURE_LAYOUT_&_SECTIONS_UKPN REV-BDrawing · PDF29 Jul 2025View
AMENDED LAYOUTS_PUMP HOUSE-300 REV-CDrawing · PDF29 Jul 2025View
AMENDED DRAINAGE SECTIONS DETAILS-207 REV-BDrawing · PDF29 Jul 2025View
AMENDED BASIN_DETAILS-208 REV-C.Drawing · PDF29 Jul 2025View
AMENDED GENERAL_LAYOUT-501_REV-CDrawing · PDF29 Jul 2025View
AMENDED GENERAL ARRANGEMENTSECTIONS.Drawing · PDF29 Jul 2025View
AMENDED GENERAL LAYOUT-501 REV-B UKPN AND EDPR CONTROL ROOM BUILDINGDrawing · PDF29 Jul 2025View
LOCAL FLOOD AUTHORITYConsultee Response · PDF16 Jul 2025View
SANDWICH TOWN COUNCILConsultee Response · PDF15 Jul 2025View
ENVRIONMENT AGENCYConsultee Response · PDF26 Jun 2025View
APPLICATION FORMApplication Form · PDF4 Jun 2025View
SUPERSEDED SITE LAYOUT PLANDrawing · PDF4 Jun 2025View
SUPERSEDED SUDS BASIN DETAILSDrawing · PDF4 Jun 2025View
SUPERSEDED DRAINAGE SECTIONSDrawing · PDF4 Jun 2025View
SURFACE WATER DRAINAGE STRATEGY AND CALCULATIONS REPORTReport · PDF4 Jun 2025View
DRAINAGE GA PLAN LAYOUTDrawing · PDF4 Jun 2025View
EDPR CONTROL BUILDING ELEVATIONS AND SECTIONSDrawing · PDF4 Jun 2025View
SUPERSEDED UKPN AND EDPR CONTROL ROOM BUILDING FLOOR PLANDrawing · PDF4 Jun 2025View
SUPERSEDED GENERAL ARRANGEMENT SECTIONSDrawing · PDF4 Jun 2025View
SUPERSEDED HYDRANT-WATER SUPPLY BUILDERS WORK DETAILSDrawing · PDF4 Jun 2025View
SUPERSEDED CLADDING 3DDrawing · PDF4 Jun 2025View
COVER LETTERCorrespondence · PDF4 Jun 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Last Site Notice Posted Date

    Published milestoneCouncil source
  4. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision Issued Date

    Published milestoneCouncil source
  7. Decision Made Date

    Published milestoneCouncil source

Decision & conditions

Grant Planning Permission
DECISION NOTICE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.