WithdrawnCouncil status: Application Withdrawn

Proposed installation of additional and replacement infrastructure on the existing works and change of use from undeveloped land to an operational site to extend the operational site area on land at (and adjacent to) Malborough Waste Water Treatment Works

Land adjacent to Malborough Waste Water Treatment Works, Malborough, Kingsbridge, TQ7 3DD

Devon County CouncilReference DCC/4366/2023Full Planning Consent

Last published check: 13 Nov 2026, 23:14. Check the council record for more recent changes.

Open council website

Status and dates

Last published check: 13 Nov 2026, 23:14 (UK)

  1. DoneReceived4 Sept 2023
  2. DoneValidated4 Sept 2023
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. ClosedWithdrawnApplication Withdrawn

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (5)
  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Issue Date

    Published milestoneCouncil source
Application type
Full Planning Consent
Documents
73 published

Proposal

Proposed installation of additional and replacement infrastructure on the existing works and change of use from undeveloped land to an operational site to extend the operational site area on land at (and adjacent to) Malborough Waste Water Treatment Works

Reference
DCC/4366/2023
Agent
Mr Nicholas Leaney

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • ApplicationFormRedacted.pdfApplication Form (redacted)6 Sept 2023View
  • 53127-SWE-00-XX-DR-PL-7001 - Location Plan.pdfSite Location Plan - 53127-SWE-00-XX-DR-PL-7001 - C016 Sept 2023View
  • 53127-SWE-00-XX-DR-PL-7002 - Existing site layout plan.pdfExisting Site Layout Plan - 53127-SWE-00-XX-DR-PL-7002 - C016 Sept 2023View
  • 53127-SWE-00-XX-DR-PL-7003 - Site layout plan.pdfProposed Site Layout Plan - 53127-SWE-00-XX-DR-PL-7003 - C016 Sept 2023View
  • 53127-GT-00-XX-DR-PL-7005 - proposed site sections.pdfProposed Site Sections - 53127-GT-00-XX-DR-PL-7005 - C016 Sept 2023View
  • 53127-GT-00-XX-DR-PL-7006 - sludge thickener building.pdfSludge Thickener Building Plan & Elevation - 53127-GT-00-XX-DR-PL-7006 - C016 Sept 2023View
  • 53127-GT-00-XX-DR-PL-7007 - blower building.pdfBlower Building Plan & Elevation - 53127-GT-00-XX-DR-PL-7007 - C016 Sept 2023View
  • 53127-GT-00-XX-DR-PL-7008 - transformer and generator building.pdfTransformer And Generator Building Plan & Elevations - 53127-GT-00-XX-DR-PL-7008 - C016 Sept 2023View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Withdrawn After Validation
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.