Proposed installation of additional and replacement infrastructure on the existing works and change of use from undeveloped land to an operational site to extend the operational site area on land at (and adjacent to) Malborough Waste Water Treatment Works
Land adjacent to Malborough Waste Water Treatment Works, Malborough, Kingsbridge, TQ7 3DD
Proposed installation of additional and replacement infrastructure on the existing works and change of use from undeveloped land to an operational site to extend the operational site area on land at (and adjacent to) Malborough Waste Water Treatment Works
Reference
DCC/4366/2023
Agent
Mr Nicholas Leaney
Sign in to view all collected council fields and recorded changes.
53127-SWE-00-XX-DR-PL-7002 - Existing site layout plan.pdfExisting Site Layout Plan - 53127-SWE-00-XX-DR-PL-7002 - C016 Sept 2023View
53127-SWE-00-XX-DR-PL-7003 - Site layout plan.pdfProposed Site Layout Plan - 53127-SWE-00-XX-DR-PL-7003 - C016 Sept 2023View
53127-GT-00-XX-DR-PL-7005 - proposed site sections.pdfProposed Site Sections - 53127-GT-00-XX-DR-PL-7005 - C016 Sept 2023View
53127-GT-00-XX-DR-PL-7006 - sludge thickener building.pdfSludge Thickener Building Plan & Elevation - 53127-GT-00-XX-DR-PL-7006 - C016 Sept 2023View
53127-GT-00-XX-DR-PL-7007 - blower building.pdfBlower Building Plan & Elevation - 53127-GT-00-XX-DR-PL-7007 - C016 Sept 2023View
53127-GT-00-XX-DR-PL-7008 - transformer and generator building.pdfTransformer And Generator Building Plan & Elevations - 53127-GT-00-XX-DR-PL-7008 - C016 Sept 2023View
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.