WITHDRAWN - Construction of a 132Kv-33Kv -11Kv Supply Point Electricity Substation, Operational Electricity Plant, Substation Access Road and Surface Water Drainage Outfall

WITHDRAWN - Matford Home Farm, Matford Mews, Matford, Devon, EX2 8XT

Application WithdrawnReference: DCC/4329/2022Devon County Council

Last published check: 14 Sept 2026, 22:48. Check the council record for more recent changes.

Application location

WITHDRAWN - Matford Home Farm, Matford Mews, Matford, Devon, EX2 8XT

This record has no verified map location.

Application summary

Status
Application Withdrawn
Application type
Full Planning Consent
Received
30 Nov 2022
Validated
5 Dec 2022
Determination deadline
Not published
Local authority
Devon County Council

Application overview

WITHDRAWN - Construction of a 132Kv-33Kv -11Kv Supply Point Electricity Substation, Operational Electricity Plant, Substation Access Road and Surface Water Drainage Outfall

Proposal details

Reference
DCC/4329/2022
Agent
Ms Raakhee Patel

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 145 of 145

DocumentPublishedAction
ApplicationForm_amended_Redacted.pdfApplication Form (redacted)7 Dec 2022View
70072143 - Covering Letter.pdfCombined Substation & Matford Home Farm Spine Road Plan - 70082641-SUB-PI-001 Rev P0530 Nov 2022View
70082641-SUB-PA-001 P3 - Location - Site Plan.pdfLocation Plan/ Site Plan - 70082641-SUB-PA-001 Rev P330 Nov 2022View
70082641-SUB-PA-002 P4 - Land Ownership Plan.pdfLand Ownership & HMPE Plan - 70082641-SUB-PA-002 Rev P430 Nov 2022View
70082641-SUB-PA-003 P2 - Existing Site Topographical Survey.pdfExisting Site Topographical Survey - 70082641-SUB-PA-003 Rev P230 Nov 2022View
70082641-SUB-PA-004 P5 - Substation Works Overall Plan.pdfSubstation Works Overall Plan - 70082641-SUB-PA-004 Rev P530 Nov 2022View
70082641-SUB-PA-005 P4 - Substation and Access Road Works.pdfSubstation And Access Road Works - 70082641-SUB-PA-005 Rev P430 Nov 2022View
70082641-SUB-PA-006 P3 - Substation Access road and A379 Junction Details.pdfSubstation Access Road And A379 Junction Details - 70082641-SUB-PA-006 Rev P0330 Nov 2022View
70082641-SUB-PA-007 P3 - Site Access Route and Site Compound.pdfSite Access And Site Compound - 70082641-SUB-PA-007 Rev P0330 Nov 2022View
70082641-SUB-PA-008 P6 - Surface and Foul Water Drainage.pdfSurface And Foul Water Drainage Plan - 70082641-SUB-PA-008 Rev P0630 Nov 2022View
70082641-SUB-PA-009 P3 - Vegetation Clearance and Building Demolition Plan.pdfVegetation Clearance And Building Demolition Plan - 70082641-SUB-PA-009 Rev P330 Nov 2022View
70082641-SUB-PA-010 P4 - Soft Landscape Design.pdfSoft Landscape Design - 70082641-SUB-PA-010 Rev P0430 Nov 2022View
70082641-SUB-PA-011 P2 - Soft Landscape Construction Details.pdfSoft Landscape Details - 70082641-SUB-PA-011 Rev P230 Nov 2022View
70082641-SUB-PA-012 P1 - Bat House - Bat Roost Details.pdfIndicative Bat House/Bat Roost Details - 70082641-SUB-PA-012 Rev P0130 Nov 2022View
70082641-SUB-PA-013 P2 - 132kV Control Relay Room Elevations.pdfBuilding Plan and Elevations 132kv Control Room Building - 70082641-SUB-PA-013 Rev P0230 Nov 2022View
Elevation (Rear) - Proposed_included_in_Elevation (Front) - Proposed.pdfCross Sections Sheet 01 of 02 - 70082641-SUB-PA-015 Rev P330 Nov 2022View
70082641-SUB-PA-015 P3 - Electricity Substation Cross Sections Sheet 01 of 02.pdfCross Sections Sheet 02 Of 02 - 70082641-SUB-PA-016 Rev P330 Nov 2022View
70082641-SUB-PA-016 P3 - Electricity Substation Cross Sections Sheet 02 of 02.pdfMatford Home Farm Existing Utilities - 7082641-SUB-PA-017 Rev P0330 Nov 2022View
70082641-SUB-PA-017 P3 - Matford Home Farm Existing Utilities.pdfSubstation and Access Road Proposed Utilities - 70082641-SUB-PA-018 Rev P0330 Nov 2022View
70082641-SUB-PA-018 P3 - Substation and Access Road Proposed Utilities.pdfSubstation Lighting Plan - 70082641-SUB-PA-019 Rev P0230 Nov 2022View
70082641-SUB-PA-019 P2 - Substation Lighting.pdfExisting National Grid 132KV & Surf Telecoms Overhead Cable Clearance Details - 70082641-SUB-PA-020 Rev P230 Nov 2022View
70082641-SUB-PA-020 P2 - Existing NG 132kV and Surf Telecoms.pdfSubstation Proposed Levels and Contours - 70082641-SUB-PA-021 Rev P0230 Nov 2022View
70082641-SUB-PA-022.pdfIndicative Proposed Vegetation at 15 years post-completion15 Feb 2023View
Covering Letter_Redacted.pdfCovering Letter (Redacted)1 Dec 2022View
70072143-SUB-PA-PEA - PEA redacted_Part2.pdfPlanning, Design and Access Statement30 Nov 2022View
DCC_4329_2022_Electricity Substation_Planning DAS_Correction Technical Note.pdfPlanning, Design and Access Statement - Technical Note10 Jan 2023View
SW Exeter Substation OAR - FINAL DRAFT - accessible (1).pdfOptions Appraisal Report10 Jan 2023View
70072143-SUB-PA-BNG - Biodiversity Net Gain Report.pdfBiodiversity Net Gain Report30 Nov 2022View
Appendix C-DCC_HIF_Substation-BM3.1.xlsxBiodiversity Metric Calculator30 Nov 2022View
70072143-SUB-PA-CF - Substation Carbon Assessment.pdfSustainable Design - Carbon Assessment30 Nov 2022View
70072143-SUB-PA-FRA - Flood Risk Assessment_redacted.pdfFlood Risk Assessment (Redacted)30 Nov 2022View
70072143-SUB-PA-GEO-WFD - WFD Geomorphology.pdfWater Framework Directive Assessment30 Nov 2022View
70072143-SUB-PA-GI - Green Infrastructure Context Plan and Statement.pdfGreen Infrastructure Statement30 Nov 2022View
70072143-SUB-PA-HYD - Hydrological and Hydrogeological Risk.pdfHydrological And Hydrogeological Risk Assessment30 Nov 2022View
Updated Ligthting Statement_70072143-SUB-PA-LS.pdfUpdated Lighting Statement (Submitted 09/02/23)10 Feb 2023View
70072143-SUB-PA-LEMP - Landscape and Ecological Management Plan.pdfLandscape And Ecological Management Plan30 Nov 2022View
70072143-SUB-PA-LVIA - Landscape Visual Assessment.pdfLandscape and Visual Impact Appraisal30 Nov 2022View
70072143-Figure 1_Site_Location_Plan.pdfLandscape and Visual Impact Appraisal - Figure 1 Site Location Plan2 Dec 2022View
70072143-Figure 2_Landscape_Character.pdfLandscape and Visual Impact Appraisal - Figure 2 Landscape Character2 Dec 2022View
70072143-Figure 3_Planning_Designations.pdfLandscape and Visual Impact Appraisal - Figure 3 Planning Designations2 Dec 2022View
70072143-Figure 4_Topography.pdfLandscape and Visual Impact Appraisal - Figure 4 Topography2 Dec 2022View
70072143-Figure 5_Viewpoint_Locations_and_ZTV.pdfLandscape and Visual Impact Appraisal - Figure 5 Viewpoint Locations And Ztv2 Dec 2022View
70072143-Figure 6_Neighbouring_Development.pdfLandscape and Visual Impact Appraisal - Figure 6 Neighbouring Development2 Dec 2022View
70072143-Figure 7.1 - 7.4 - Photosheets.pdfLandscape and Visual Impact Appraisal - Figure 7.1 - 7.4 Viewpoint Photograph30 Nov 2022View
70072143-SUB-PA-NA - Noise Impact Assessment.pdfNoise Impact Assessment Report30 Nov 2022View
70072143-SUB-PA-OCMS - Outline Construction Management Scheme.pdfOutline Construction Management Scheme30 Nov 2022View
70072143-SUB-PA-ODMP - Outline Drainage Maintenance Management Plan.pdfOutline Drainage Maintenance and Management Plan30 Nov 2022View
70072143-SUB-PA-PDA - Pre-Demolition Audit.pdfPre-Demolition Audit30 Nov 2022View
70072143-SUB-PA-SDS - Sustainable Design Statement.pdfSustainable Design Statement30 Nov 2022View
70072143-SUB-PA-US - Utilities Statement.pdfUtilities Statement30 Nov 2022View
70072143-SUB-PA-WAS - Waste Audit Statement.pdfWaste Audit Statement30 Nov 2022View
70072143-SUB-PA-HEDBA - Appendix C Figures.pdfPhase 1 Contaminated Land Assessment Part 130 Nov 2022View
70072143-SUB-PA-CL - Phase 1 Contaminated Land Assessment_Part1_redacted.pdf(Redacted) Phase 1 Contaminated Land Assessment Part 230 Nov 2022View
70072143-SUB-PA-CL - Phase 1 Contaminated Land Assessment_Part2.pdfEcological Impact Assessment Part 130 Nov 2022View
70072143-SUB-PA-ECIA - ECIA redacted_Part1.pdfEcological Impact Assessment Part 2 (Figures 4 - 6B)30 Nov 2022View
70072143-SUB-PA-ECIA - ECIA redacted_Part2.pdfEcological Impact Assessment Part 3 (Figures 6C - 6G)30 Nov 2022View
70072143-SUB-PA-ECIA - ECIA redacted_Part3.pdfEcological Impact Assessment Part 4 (Figures 6H - 10)30 Nov 2022View
70072143-SUB-PA-ECIA - ECIA redacted_Part4.pdfEcological Impact Assessment Part 5 (Appendices)30 Nov 2022View
70072143-SUB-PA-ECIA - ECIA redacted_Part5.pdfPreliminary Ecological Appraisal Part 130 Nov 2022View
70072143-SUB-PA-PEA - PEA redacted_Part1.pdfPreliminary Ecological Appraisal Part 230 Nov 2022View
Planning statement_included_in_Design and access statement.pdfPublic Consultation Report30 Nov 2022View
SW Exeter Substation Public Consultation Report - FINAL (accessible).pdfArboricultural Impact Assessment Report30 Nov 2022View
DCC_4329_2022_Electricity Substation_Applicant responses_14th Feb.pdfApplicant's Response to Neighbour Representations 14/02/202320 Feb 2023View
HIF_Substation_Applicant Response_Alternative_Site_Location.pdfUpdated Options Appraisal Report Supplementary Document (Submitted 09/02/2022)9 Feb 2023View
HEDBA_Exeter_HIF_Substation_17-11-2022_Signed.pdf(Revised) Historic Environment Desk Based Assessment17 Jan 2023View
WSI_WB_Matford Farm Substation_01-02-2023.pdf(Revised) Archaeological Written Scheme of Investigation3 Feb 2023View
Historic Environment Desk Based Assessment.pdf(Superseded) Historic Environment Desk Based Assessment1 Dec 2022View
70072143-SUB-PA-HEDBA - Historic Environment Desk Based Assessment.pdf(Superseded) Historic Environment Desk Based Assessment - Appendix C - Figures30 Nov 2022View
WSI_WB_Matford Farm Substation_25-01-2023.pdf(Superseded) Archaeological Written Scheme of Investigation26 Jan 2023View
Comments.pdfExeter and Devon Airport Ltd Response 11/12/202214 Dec 2022View
DCC43292022_HERef_P01553315_L420119_redacted.pdfHistoric England Response 15/12/202216 Dec 2022View
DCC Historic Environment Response_redacted.pdfDCC Historic Environment Response 16/12/202216 Dec 2022View
DCC Historic Env_redacted.pdfUpdated DCC Historic Environment Response 02/02/20233 Feb 2023View
Response_DCC-4329-2022.pdfDCC Highways Response 20/12/202221 Dec 2022View
20221220_MOD_Response_Letter_Redacted.pdfMinistry of Defence Response 20/12/202221 Dec 2022View
Cllr Connett_Redacted.pdfResponse from Councillor Connett 04/01/20234 Jan 2023View
20230105 NHPR Conditions DCC-4329-2022_redacted.pdfNational Highways Response 05/01/20236 Jan 2023View
Comments (2)(7).pdfExeter City Council, Local Plans Team Response 11/01/202311 Jan 2023View
FRM.DCC.4329.2022 Response.pdfDCC Flood Risk Response 12/01/202313 Jan 2023View
22-DCC-4329-2022 - Construction of a Electricity Substation Operational Electricity Plant Substation Access Road and Surface Water Drainage FINAL.pdfExminster Parish Council Response 23/01/202324 Jan 2023View
EA Response_DCC_4329_2022.pdfEnvironment Agency Response 31/01/202331 Jan 2023View
TDC Response DCC Consultation substation_.pdfTeignbridge District Council Response 07/02/202320 Feb 2023View
21_00158_CONSLT-Recommendation_to_Consultee-201956.pdfTeignbridge District Council Response Attachment 07/02/202320 Feb 2023View
TDC EHO Response_redacted.pdfTDC Environmental Health Response 17/02/202320 Feb 2023View
Exchange of Information_Redacted.pdfWales&West Utilities Response 03/07/2023 (redacted)4 Jul 2023View
8150121170 plan.pdfWales&West Utilities plan.pdf4 Jul 2023View
23-00936-MAJ - Construction of a Electricity Substation Operational Electricity Plant Substation Access Road and Surface Water Drainage FINAL_Redacted.pdfExminster Parish Council Response - 07/08/2023 (redacted)8 Aug 2023View
Comments on planning application ref_Redacted.pdfRepresentation - John & Lynne Maclean 16/12/202220 Dec 2022View
DCC 4329 2022 OBJECTION.pdfRepresentation - Paul Miller 18/12/202220 Dec 2022View
Comments (2).pdfRepresentation - Tina Roberts 31/12/20223 Jan 2023View
Objection DCC-4329-2022.pdfRepresentation - Neil Langford 02/01/20233 Jan 2023View
Comments (5).pdfRepresentation - Catherine Hurl 03/01/20233 Jan 2023View
R Kemble.pdfRepresentation - Mr R Kemble 24/12/20223 Jan 2023View
Comments (2)(1).pdfRepresentation - Daryl Coles 04/01/20234 Jan 2023View
Comments (3).pdfRepresentation - Brian Briscoe 04/01/20234 Jan 2023View
Comments (2)(2).pdfRepresentation - Martin Searle 04/01/20234 Jan 2023View
Comments (3)(1).pdfRepresentation - Andrew Searle 04/01/20235 Jan 2023View
Comments (5)(1).pdfRepresentation - Georgina Brown 04/01/20235 Jan 2023View
objection to substation at EX2 8XT ref BGX DCC 4329 2022.pdfRepresentation - Faye Searle 04/01/20235 Jan 2023View
Comments (7).pdfRepresentation - Lauren Wright 04/01/20235 Jan 2023View
Comments (8).pdfRepresentation - Duncan Searle 04/01/20235 Jan 2023View
Comments (10).pdfRepresentation - Mrs KJ Conley 04/01/20235 Jan 2023View
Comments (11).pdfRepresentation - Thomas Conley 04/01/20235 Jan 2023View
Comments (12).pdfRepresentation - Louise Richardson 04/01/20235 Jan 2023View
Comments (13).pdfRepresentation - Eleanor Viola Spencer 04/01/20235 Jan 2023View
Comments (14).pdfRepresentation - Dave Sandercock 04/01/20235 Jan 2023View
Comments (15).pdfRepresentation - Kitty Nichol 04/01/20235 Jan 2023View
Comments (17).pdfRepresentation - Farid Adhamy-Nichol 04/01/20235 Jan 2023View
Comments (18).pdfRepresentation - Barbara Simpson 04/01/20235 Jan 2023View
Comments (19).pdfRepresentation - Brendan Nedelec 05/01/20235 Jan 2023View
Comments (2)(3).pdfRepresentation - Terry Dyson 05/01/20235 Jan 2023View
Comments (2)(4).pdfRepresentation - Rose Nichol 05/01/20236 Jan 2023View
Comments (3)(2).pdfRepresentation - Jade Pinder 05/01/20236 Jan 2023View
Comments (5)(2).pdfRepresentation - Mrs Anne Murray 05/01/20236 Jan 2023View
Planning Objection V1.docx(Attachment) Representation - Jeff Searle 05/01/20235 Jan 2023View
Comments (8)(1).pdfRepresentation - Faye Searle 05/01/20236 Jan 2023View
Comments (9).pdfRepresentation - Paul Conley 05/01/20236 Jan 2023View
Representation - Derek Hewertson 05012023_redacted.pdfRepresentation - Derek Hewertson 05/01/20236 Jan 2023View
Comments (3)(3).pdfRepresentation - Lorraine Shelley 06/01/20236 Jan 2023View
Comments (5)(3).pdfRepresentation - Jamie Stables 06/01/20239 Jan 2023View
Comments (8)(2).pdfRepresentation - Robin Richardson 07/01/20239 Jan 2023View
Comments (9)(1).pdfRepresentation - Pauline Richardson 07/01/20239 Jan 2023View
JL Objection to SubStation.pdfRepresentation - Jack Langford 08/01/20239 Jan 2023View
2022.pdfRepresentation - Caroline Aird 08/01/20238 Jan 2023View
Comments (2)(5).pdfRepresentation - Catherine Miller 09/01/20239 Jan 2023View
Comments (3)(4).pdfRepresentation - Brianna Miller 09/01/20239 Jan 2023View
Comments (2)(6).pdfRepresentation - Wendy Elmsall 09/01/202310 Jan 2023View
Comments (3)(5).pdfRepresentation - R Brownbridge 09/01/202310 Jan 2023View
representation_redacted.pdfRepresentation - Mark Dyson 31/03/20236 Apr 2023View
Andrew Dursley_Redacted.pdfRepresentation - Andrew Dursley 18/05/202323 May 2023View
Ben Hodges_Redacted.pdfRepresentation - Ben Hodges 19/05/202323 May 2023View
Ben Morgan_Redacted.pdfRepresentation - Ben Morgan 18/05/2023 (redacted)23 May 2023View
Phyllis Greenaway_Redacted.pdfRepresentation - Phyllis Greenaway 18/05/202323 May 2023View
Ruth Chalmers_Redacted.pdfRepresentation - Ruth Chalmers 18/05/202323 May 2023View
Todd Donochie_Redacted.pdfRepresentation - Todd Donochie 18/05/202323 May 2023View
Comments (3)(6).pdfRepresentation - Jon Boyd 01/06/20236 Jun 2023View
Comments (5)(5).pdfRepresentation - Paul Connolly 01/06/20236 Jun 2023View
DCC4329 Comment Pauline Richardson_redacted.pdfRepresentation - Pauline Richardson 31/05/20237 Jun 2023View
DCC 4329 Robin Richardson_redacted.pdfRepresentation - Robin Richardson 31/05/20237 Jun 2023View
DCC 4329 Jenny Marshall_redacted.pdfRepresentation - Jenny Marshall 01/06/20237 Jun 2023View
DCC 4329 Liese Connolly_redacted.pdfRepresentation - Liese Connolly 01/06/20237 Jun 2023View
DCC-4329-2022_Objection_England(1).pdfRepresentation - Nicholas England 20/07/202321 Jul 2023View
Comments (5)(6).pdfRepresentation - Ruth Viñuela 14/02/202414 Feb 2024View
HIF Substation_Applicant response_Alternative Site Location.pdfOptions Appraisal Report Supplementary Document (Submitted 06/02/2022)6 Feb 2023View
70072143-SUB-PA-LS - Lighting Statement.pdfSuperseded Lighting Statement30 Nov 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Issue Date

    Published milestoneCouncil source

Decision & conditions

Withdrawn After Validation
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.